Rooney Construction
- Based in
- Millbrae
- On San Francisco permits
- Apr 2001 to Feb 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 1 days from filing to permit and 55 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2020 | Completed final sign-off Aug 2020 | 545 Junipero Serra Bl | remove and rebuild existing front stair & landing as in kind (same size & shape). less than 50%Details
remove and rebuild existing front stair & landing as in kind (same size & shape). less than 50% | $32,000 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 126 Park St | installation of stairway & deck (metal at rear.Details
installation of stairway & deck (metal at rear. | $7,500 |
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 1438 38th Av | stairway wall, remove all damaged dryrot,framing members & replace with pressure treated lumber.Details
stairway wall, remove all damaged dryrot,framing members & replace with pressure treated lumber. | $3,700 |
| Apr 10, 2001 | Completed final sign-off May 2001 | 206 San Jose Av | repair & remodel (e) stairs, stringers, threads, risers & postDetails
repair & remodel (e) stairs, stringers, threads, risers & post | $4,500 |