Back to kitchen remodel contractors
Rooney Construction
- Based in
- Millbrae
- On San Francisco permits
- Apr 2001 to Feb 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2014 | Completed final sign-off May 2014 | 846 Capp St | remove existing fire damaged wood framing members in walls, ceilings & floors, repl with new wood, repair old windows and doors broken by fire dept. repair and replace smoke damaged appliance toilet shower stall & vanity, rebuild kitchen area, repl glass and windows onlyDetails
remove existing fire damaged wood framing members in walls, ceilings & floors, repl with new wood, repair old windows and doors broken by fire dept. repair and replace smoke damaged appliance toilet shower stall & vanity, rebuild kitchen area, repl glass and windows only | $52,000 |