Rodscape

Contractor license
1030103
State license record
Based in
San Francisco
On San Francisco permits
Jan 2019 to Aug 2024
Last 24 months
0 permits filed

9 permits since 2000: 9 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 2Stairs 2Kitchen remodel 3Bathroom remodel 5

2 stairs permits: 2 completed. Typically 4 days from filing to permit and 173 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 21, 2021Completed
final sign-off May 2022
1734 08th Avupgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans.
Details
Permit
202112214799
Status
complete
Filed
Dec 21, 2021
Permit issued
Dec 21, 2021
Final sign-off
May 2, 2022
Declared cost
$50,000
Address
1734 08th Av

upgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans.

Open the permit page

$50,000
Jan 11, 2019Completed
final sign-off Aug 2019
379 Head Stmain floor - remodel kitchen and bathroom, add 1 full bath, reconstruct (e) interior stair; ground floor - add 2 bedrooms and 1 full bath
Details
Permit
201901110133
Status
complete
Filed
Jan 11, 2019
Permit issued
Jan 18, 2019
Final sign-off
Aug 20, 2019
Declared cost
$65,000
Address
379 Head St

main floor - remodel kitchen and bathroom, add 1 full bath, reconstruct (e) interior stair; ground floor - add 2 bedrooms and 1 full bath

Open the permit page

$65,000