Back to bathroom remodel contractors
Rodscape
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Aug 2024
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2022 | Completed final sign-off Dec 2023 | 651 Panorama Dr | divide the garage to create additional living area (n) bathroom and (n) wet bar, add steps @ rear, add (9) windows, add sliding door @ rearDetails
divide the garage to create additional living area (n) bathroom and (n) wet bar, add steps @ rear, add (9) windows, add sliding door @ rear | $52,500 |
| Jan 13, 2022 | Completed final sign-off May 2022 | 1734 08th Av | revision to bpa#202112214799. remodel (1) add'l bathroom on 1st fl. remove (e)tile, replace toilet, light switches/outlets, replace fan. (2) kitchen remodel, 1st and 2nd fl. removing counter top, back splash, replace sink, hood & electrical outlets/switches. ext siding dryrot repair like for likeDetails
revision to bpa#202112214799. remodel (1) add'l bathroom on 1st fl. remove (e)tile, replace toilet, light switches/outlets, replace fan. (2) kitchen remodel, 1st and 2nd fl. removing counter top, back splash, replace sink, hood & electrical outlets/switches. ext siding dryrot repair like for like | $20,000 |
| Dec 21, 2021 | Completed final sign-off May 2022 | 1734 08th Av | upgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans.Details
upgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans. | $50,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2021 | 75 Folsom St | remodel 1 kitchen and 2 bathrooms:demolition of kitchen cabinets-install new kitchen cabinets, drywall repair, framing repair, flooring shower wall tile install, new bathroom cabinets install new recessed lights to be install, closets doors replacement paint.Details
remodel 1 kitchen and 2 bathrooms:demolition of kitchen cabinets-install new kitchen cabinets, drywall repair, framing repair, flooring shower wall tile install, new bathroom cabinets install new recessed lights to be install, closets doors replacement paint. | $20,000 |
| Jan 11, 2019 | Completed final sign-off Aug 2019 | 379 Head St | main floor - remodel kitchen and bathroom, add 1 full bath, reconstruct (e) interior stair; ground floor - add 2 bedrooms and 1 full bathDetails
main floor - remodel kitchen and bathroom, add 1 full bath, reconstruct (e) interior stair; ground floor - add 2 bedrooms and 1 full bath | $65,000 |