Rodscape
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Aug 2024
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 14 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2021 | Completed final sign-off May 2022 | 1734 08th Av | upgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans.Details
upgrade 2.5 bathrooms, bring elec up to code, replacement of shower tile, shower valves, install fan, replacement of tub, replacement of light switches and outets, repair 40% dryrot on outside deck, installation of new smoke detectors, replacment of existing stair handrail.bathroom fans. | $50,000 |
| Oct 3, 2019 | Completed final sign-off Oct 2020 | 1374 45th Av | comply w/ complaint 201981831. construct deck 35'x15' and shed at rear w/ electrical, plumbingDetails
comply w/ complaint 201981831. construct deck 35'x15' and shed at rear w/ electrical, plumbing | $10,000 |