Back to kitchen remodel contractors
Robert Howard Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2023
- Last 24 months
- 0 permits filed
96 permits since 2000: 83 completed, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 15 completed, 5 expired or cancelled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Jun 2021 | 174 Bonview St | replace in kind kitchenDetails
replace in kind kitchen | $33,000 |
| Aug 9, 2017 | Expired or cancelled expired Mar 2019 | 35 Dorland St | kitchen remodel; remove wall betwee kitchen & dining room & replace with beam; install posts & footingsDetails
kitchen remodel; remove wall betwee kitchen & dining room & replace with beam; install posts & footings | $50,000 |
| May 23, 2017 | Expired or cancelled expired May 2019 | 1283 Page St | renovate kitchen and breakfast area, add new powder room on 2nd floor. voluntary strengthening upgrade on 1st floor. remove bathroom on 1st floorDetails
renovate kitchen and breakfast area, add new powder room on 2nd floor. voluntary strengthening upgrade on 1st floor. remove bathroom on 1st floor | $50,000 |
| Dec 1, 2016 | Completed final sign-off Jun 2017 | 164 Bonview St | replace in-kind kitchen remodel. no structural work.Details
replace in-kind kitchen remodel. no structural work. | $35,000 |
| Jun 6, 2014 | Completed final sign-off Jul 2014 | 214 Cole St | replace inkind kitchen remodel. new fah furnaceDetails
replace inkind kitchen remodel. new fah furnace | $30,000 |
| Jan 29, 2014 | Completed final sign-off Jul 2014 | 602 Hampshire St | remodel existing kitchen, bath, creatin of new 1/2 bath. includes new cabinetry, appliances, floor and wall finishes, electrical and plumbing upgrades per title 24. all work is insterior. no change to building envelope, size, or height.Details
remodel existing kitchen, bath, creatin of new 1/2 bath. includes new cabinetry, appliances, floor and wall finishes, electrical and plumbing upgrades per title 24. all work is insterior. no change to building envelope, size, or height. | $85,000 |
| Jun 24, 2013 | Completed final sign-off Nov 2013 | 76 Gates St | kitchen remodel, replace in kind. lightings will comply with title 24.Details
kitchen remodel, replace in kind. lightings will comply with title 24. | $15,000 |
| Jan 25, 2011 | Completed final sign-off Sep 2011 | 150 Bonview St | interior remodel: replace in kind bath, kitchen, new bedroom, full bath, relocate w/d. exterior remodel: new windows on front & rear facades, repair e. stucco, paint. new roof membrance, replace e. skylight in kind.Details
interior remodel: replace in kind bath, kitchen, new bedroom, full bath, relocate w/d. exterior remodel: new windows on front & rear facades, repair e. stucco, paint. new roof membrance, replace e. skylight in kind. | $75,000 |
| Sep 21, 2010 | Completed final sign-off Jan 2011 | 214 Cole St | replace 5 windows:4 at rear, 1 in lightwell. u factor 0.40 max. upgrade electrical in all rooms except kitchen and bath. install plumbing for laundry hook up in pantry.Details
replace 5 windows:4 at rear, 1 in lightwell. u factor 0.40 max. upgrade electrical in all rooms except kitchen and bath. install plumbing for laundry hook up in pantry. | $10,000 |
| Feb 19, 2010 | Expired or cancelled expired Sep 2016 | 111 03rd Av | alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope.Details
alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope. | $250,000 |
| Mar 13, 2009 | Completed final sign-off Dec 2009 | 33 Pond St | #35 pond-removal of in operative chminey flu adjacent to kitchen (top unit)-additonal kitchen cabinets, electrical outlets to kitchen,addition of toilet & new vanity to current half bathrm adjacent to kitchen,tile kitchen/full bathrm flrs,replace kitchen window,living rm window & full bathrm windowsDetails
#35 pond-removal of in operative chminey flu adjacent to kitchen (top unit)-additonal kitchen cabinets, electrical outlets to kitchen,addition of toilet & new vanity to current half bathrm adjacent to kitchen,tile kitchen/full bathrm flrs,replace kitchen window,living rm window & full bathrm windows | $65,000 |
| Jan 25, 2007 | Completed final sign-off Oct 2009 | 2033 22nd St | demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floorDetails
demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floor | $100,000 |
| Feb 6, 2006 | Completed final sign-off Nov 2006 | 428 Cortland Av | secondary egress replacement. rear facade of basement & first floor repair sincluding insulation, new siding, new windows & french doors, in unit no. 430-remove living room wall, replace kitchen cabinets, remodel rear bathDetails
secondary egress replacement. rear facade of basement & first floor repair sincluding insulation, new siding, new windows & french doors, in unit no. 430-remove living room wall, replace kitchen cabinets, remodel rear bath | $80,000 |
| Mar 14, 2005 | Completed final sign-off Oct 2005 | 81 Crescent Av | remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets.Details
remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets. | $70,000 |
| Jul 24, 2003 | Completed final sign-off Oct 2003 | 1668 Grove St | kitchen remodel; new cabs & flrng; upgrade electrical & add lights; move range, move sink, new countDetails
kitchen remodel; new cabs & flrng; upgrade electrical & add lights; move range, move sink, new count | $22,500 |
| Mar 26, 2003 | Completed final sign-off Aug 2003 | 2655 16th Av | horizontal addition-remodel kitchen (no structural work) replace one window, alter opening size & reDetails
horizontal addition-remodel kitchen (no structural work) replace one window, alter opening size & re | $34,000 |
| Feb 13, 2001 | Expired or cancelled expired Jun 2001 | 101 Andover St | renew 200002182336-for final tile in kitchen & shelvesDetails
renew 200002182336-for final tile in kitchen & shelves | |
| Nov 30, 2000 | Completed final sign-off May 2001 | 76 Rockridge Dr | addition to #200006233492 repair kitchen cabinets, replace floor, update electrical, move sinkDetails
addition to #200006233492 repair kitchen cabinets, replace floor, update electrical, move sink | $18,000 |
| Oct 3, 2000 | Completed final sign-off Jan 2001 | 165 Hazelwood Av | remodel kitchen,replace cabinets & flooring,new vinyl flooring,new stub, replace bath vinyl floorinDetails
remodel kitchen,replace cabinets & flooring,new vinyl flooring,new stub, replace bath vinyl floorin | $15,000 |
| Jun 16, 2000 | Expired or cancelled expired Jul 2001 | 175 Commonwealth Av | legalize deck, alter kitchen, sitting rm, breakfast rm, replace wall w/steel beam seismic u/g @ rearDetails
legalize deck, alter kitchen, sitting rm, breakfast rm, replace wall w/steel beam seismic u/g @ rear | $50,000 |