Back to bathroom remodel contractors
Robert Howard Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2023
- Last 24 months
- 0 permits filed
96 permits since 2000: 83 completed, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 21 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2022 | Completed final sign-off Feb 2024 | 164 Bonview St | to create a new master bedroom and bath in an extg basement space. to create a new interior stairway connecting the basement to the main level.Details
to create a new master bedroom and bath in an extg basement space. to create a new interior stairway connecting the basement to the main level. | $125,000 |
| Apr 6, 2021 | Completed final sign-off Jun 2022 | 156 Bonview St | build a new partion wall to separate a new 1 car garage and new living space including a new bedroom and a bathroom & laundry. replace exiting furnace and water heater with new tankless water heater. relocate laundry. reroute upstair plumbing as reqDetails
build a new partion wall to separate a new 1 car garage and new living space including a new bedroom and a bathroom & laundry. replace exiting furnace and water heater with new tankless water heater. relocate laundry. reroute upstair plumbing as req | $10,000 |
| Nov 22, 2017 | Expired or cancelled expired May 2019 | 1283 Page St | replace in-kind 2nd floor bath. toilet/shower/sink.Details
replace in-kind 2nd floor bath. toilet/shower/sink. | $10,000 |
| May 23, 2017 | Expired or cancelled expired May 2019 | 1283 Page St | renovate kitchen and breakfast area, add new powder room on 2nd floor. voluntary strengthening upgrade on 1st floor. remove bathroom on 1st floorDetails
renovate kitchen and breakfast area, add new powder room on 2nd floor. voluntary strengthening upgrade on 1st floor. remove bathroom on 1st floor | $50,000 |
| May 9, 2016 | Never finaled filed May 2016, never issued | 3735 20th St | due to rot, deterioration & lead paint hazards. replacement in kind of 8 windows. 4 in front bya, 1 in setback wall, 2 in interior lightwell, 1 in rear set back wall. replace in kind rear french door. new window install in upstairs bath. alteration to (e) rear deck.Details
due to rot, deterioration & lead paint hazards. replacement in kind of 8 windows. 4 in front bya, 1 in setback wall, 2 in interior lightwell, 1 in rear set back wall. replace in kind rear french door. new window install in upstairs bath. alteration to (e) rear deck. | $20,000 |
| Mar 14, 2016 | Completed final sign-off Jul 2016 | 3735 20th St | new full bathroom on 3rd floor, as per drawings. no structural work. no exterior work.Details
new full bathroom on 3rd floor, as per drawings. no structural work. no exterior work. | $20,000 |
| Jan 29, 2014 | Completed final sign-off Jul 2014 | 602 Hampshire St | remodel existing kitchen, bath, creatin of new 1/2 bath. includes new cabinetry, appliances, floor and wall finishes, electrical and plumbing upgrades per title 24. all work is insterior. no change to building envelope, size, or height.Details
remodel existing kitchen, bath, creatin of new 1/2 bath. includes new cabinetry, appliances, floor and wall finishes, electrical and plumbing upgrades per title 24. all work is insterior. no change to building envelope, size, or height. | $85,000 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 3717 20th St | remodel exist'g bathroom in-kind: new toilet, sink, tub and shower fixtures, replace tile on floor, no wall relocation. replace window in light well in-kind, not visible from street, no rough opening changes, maximum u-factor for window shall not exceed 0.40.Details
remodel exist'g bathroom in-kind: new toilet, sink, tub and shower fixtures, replace tile on floor, no wall relocation. replace window in light well in-kind, not visible from street, no rough opening changes, maximum u-factor for window shall not exceed 0.40. | $10,000 |
| Jan 25, 2011 | Completed final sign-off Sep 2011 | 150 Bonview St | interior remodel: replace in kind bath, kitchen, new bedroom, full bath, relocate w/d. exterior remodel: new windows on front & rear facades, repair e. stucco, paint. new roof membrance, replace e. skylight in kind.Details
interior remodel: replace in kind bath, kitchen, new bedroom, full bath, relocate w/d. exterior remodel: new windows on front & rear facades, repair e. stucco, paint. new roof membrance, replace e. skylight in kind. | $75,000 |
| Sep 21, 2010 | Completed final sign-off Jan 2011 | 214 Cole St | replace 5 windows:4 at rear, 1 in lightwell. u factor 0.40 max. upgrade electrical in all rooms except kitchen and bath. install plumbing for laundry hook up in pantry.Details
replace 5 windows:4 at rear, 1 in lightwell. u factor 0.40 max. upgrade electrical in all rooms except kitchen and bath. install plumbing for laundry hook up in pantry. | $10,000 |
| Sep 3, 2010 | Completed final sign-off Dec 2015 | 16 28th St | remodel & addition to (e) 2 story single family residence. project to result in 3 bedrooms, 2 baths, great room & deck on upper level. master suite, laundry & garage on lower level. total addition of living space is 436 sq. ft.Details
remodel & addition to (e) 2 story single family residence. project to result in 3 bedrooms, 2 baths, great room & deck on upper level. master suite, laundry & garage on lower level. total addition of living space is 436 sq. ft. | $225,000 |
| Apr 13, 2010 | Completed final sign-off Sep 2010 | 30 Rockaway Av | revision to pa# 2008-0819-9526-minor structural change in footing on pg s-1, (e) stairs to basement to remain, new bannister only. (e) side door & window to remain. (e) 2nd floor bathroom to be remodeled in kind.Details
revision to pa# 2008-0819-9526-minor structural change in footing on pg s-1, (e) stairs to basement to remain, new bannister only. (e) side door & window to remain. (e) 2nd floor bathroom to be remodeled in kind. | |
| Feb 19, 2010 | Expired or cancelled expired Sep 2016 | 111 03rd Av | alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope.Details
alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope. | $250,000 |
| Feb 10, 2009 | Completed final sign-off Oct 2009 | 111 Valdez Av | 1 bathroom remodel. replace in kind. replace all windows on upper level. total of 16 windows. u-factor=0.67 max. maintain egress windows.Details
1 bathroom remodel. replace in kind. replace all windows on upper level. total of 16 windows. u-factor=0.67 max. maintain egress windows. | $25,000 |
| Jun 3, 2008 | Completed final sign-off Aug 2008 | 212 Cole St | work @ unit# 214 only. 1 bathroom & 1 water closet romodel. replace in kind. no change doors or exiting. change window @ bathroom & water closet room @ light well.Details
work @ unit# 214 only. 1 bathroom & 1 water closet romodel. replace in kind. no change doors or exiting. change window @ bathroom & water closet room @ light well. | $15,000 |
| Jan 25, 2007 | Completed final sign-off Oct 2009 | 2033 22nd St | demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floorDetails
demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floor | $100,000 |
| Jun 8, 2006 | Completed final sign-off Nov 2006 | 428 Cortland Av | rev. to pa32006/02/06/3894 - add a full bathroom and laundry closet to basement levelDetails
rev. to pa32006/02/06/3894 - add a full bathroom and laundry closet to basement level | $14,000 |
| Feb 6, 2006 | Completed final sign-off Nov 2006 | 428 Cortland Av | secondary egress replacement. rear facade of basement & first floor repair sincluding insulation, new siding, new windows & french doors, in unit no. 430-remove living room wall, replace kitchen cabinets, remodel rear bathDetails
secondary egress replacement. rear facade of basement & first floor repair sincluding insulation, new siding, new windows & french doors, in unit no. 430-remove living room wall, replace kitchen cabinets, remodel rear bath | $80,000 |
| Jun 27, 2005 | Completed final sign-off Feb 2006 | 2655 16th Av | alter stairs add hall bathroom and closet on 1/f add fire wall and deck move laundry water heater anDetails
alter stairs add hall bathroom and closet on 1/f add fire wall and deck move laundry water heater an | $150,000 |
| Mar 14, 2005 | Completed final sign-off Oct 2005 | 81 Crescent Av | remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets.Details
remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets. | $70,000 |
| May 1, 2002 | Completed final sign-off Jul 2002 | 2655 16th Av | remodel bathroom new fixtures, tile, upgradt electrical. existing bathroom remodel located on main lDetails
remodel bathroom new fixtures, tile, upgradt electrical. existing bathroom remodel located on main l | $7,500 |
| Feb 1, 2001 | Completed final sign-off Mar 2001 | 62 Aloha Av | remodel bath-replace tub/shower and fixture, replace sink/vanity, replace floor & shower tile, alterDetails
remodel bath-replace tub/shower and fixture, replace sink/vanity, replace floor & shower tile, alter | $5,000 |
| Oct 17, 2000 | Completed final sign-off Jan 2001 | 165 Hazelwood Av | remodel bathroom in main level, replace vanity, replace water closetDetails
remodel bathroom in main level, replace vanity, replace water closet | $2,500 |
| Oct 3, 2000 | Completed final sign-off Jan 2001 | 165 Hazelwood Av | remodel kitchen,replace cabinets & flooring,new vinyl flooring,new stub, replace bath vinyl floorinDetails
remodel kitchen,replace cabinets & flooring,new vinyl flooring,new stub, replace bath vinyl floorin | $15,000 |
| Jan 27, 2000 | Completed final sign-off May 2000 | 62 Aloha Av | bathroom remodel, replace shower, vanity, etcDetails
bathroom remodel, replace shower, vanity, etc |