Robert Howard Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2023
- Last 24 months
- 0 permits filed
96 permits since 2000: 83 completed, 3 never finaled, 10 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
16 deck permits: 12 completed, 2 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2016 | Never finaled filed May 2016, never issued | 3735 20th St | due to rot, deterioration & lead paint hazards. replacement in kind of 8 windows. 4 in front bya, 1 in setback wall, 2 in interior lightwell, 1 in rear set back wall. replace in kind rear french door. new window install in upstairs bath. alteration to (e) rear deck.Details
due to rot, deterioration & lead paint hazards. replacement in kind of 8 windows. 4 in front bya, 1 in setback wall, 2 in interior lightwell, 1 in rear set back wall. replace in kind rear french door. new window install in upstairs bath. alteration to (e) rear deck. | $20,000 |
| Sep 17, 2013 | Never finaled issued Aug 2014, no final | 551 Ellsworth St | new rear deck with stairs down to lower deck at grade ( less than 30" above grade). new hot tub, new slide from deck to ground.Details
new rear deck with stairs down to lower deck at grade ( less than 30" above grade). new hot tub, new slide from deck to ground. | $25,000 |
| Jan 8, 2013 | Completed final sign-off Apr 2013 | 289 Crescent Av | rear deck addition with stairs down to rear yard. install new door in (e) window opening for access to new deckDetails
rear deck addition with stairs down to rear yard. install new door in (e) window opening for access to new deck | $15,000 |
| Oct 15, 2010 | Completed final sign-off Jan 2012 | 619 Peralta Av | to comply with physical inspection report# cc-5748 dated march 15, 2010. work includes replacement of (e) rear yard deck & stair. see plans.Details
to comply with physical inspection report# cc-5748 dated march 15, 2010. work includes replacement of (e) rear yard deck & stair. see plans. | $10,000 |
| Sep 3, 2010 | Completed final sign-off Dec 2015 | 16 28th St | remodel & addition to (e) 2 story single family residence. project to result in 3 bedrooms, 2 baths, great room & deck on upper level. master suite, laundry & garage on lower level. total addition of living space is 436 sq. ft.Details
remodel & addition to (e) 2 story single family residence. project to result in 3 bedrooms, 2 baths, great room & deck on upper level. master suite, laundry & garage on lower level. total addition of living space is 436 sq. ft. | $225,000 |
| Feb 19, 2010 | Expired or cancelled expired Sep 2016 | 111 03rd Av | alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope.Details
alteration to all 3 floors of interior of s.f.d. including remodel (e) kitchen & relocate 3 (e) bathrooms, add one half bath, new 2nd floor horizontal extension - deck. no change to front facade except new retrofit double-hung windows. no change to (e) bldg envelope. | $250,000 |
| Jan 25, 2007 | Completed final sign-off Oct 2009 | 2033 22nd St | demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floorDetails
demolish and rebuild 2nd floor kitchen, new dormers at 2nd flr lvng/bath, new deck and steps at rear yard,enclose and provide access to existing wc on 1st flr, rewire 2nd flr apt, reconfigure bath fixtures on 2nd floor | $100,000 |
| Jun 27, 2005 | Completed final sign-off Feb 2006 | 2655 16th Av | alter stairs add hall bathroom and closet on 1/f add fire wall and deck move laundry water heater anDetails
alter stairs add hall bathroom and closet on 1/f add fire wall and deck move laundry water heater an | $150,000 |
| Mar 14, 2005 | Completed final sign-off Oct 2005 | 81 Crescent Av | remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets.Details
remodel kitchen & bath @ 2nd floor. new deck & stair @ 3rd floor. 2nd floor alterations to closets. | $70,000 |
| Nov 30, 2004 | Completed final sign-off Apr 2005 | 277 Clinton Pk | wrk done from lot #95,96,97,98,99 & 100 replac rear decks & stairs in kind 3 footings & posts underDetails
wrk done from lot #95,96,97,98,99 & 100 replac rear decks & stairs in kind 3 footings & posts under | $35,000 |
| May 4, 2004 | Completed final sign-off Aug 2004 | 77 Park Hill Av | replace existing deck with new extended deckDetails
replace existing deck with new extended deck | $10,000 |
| Mar 10, 2004 | Completed final sign-off Jun 2004 | 2670 17th Av | remodel kitche, new cabinets and fixtures. add 30 sq ft of floor space in lightwell, lightwell deck,Details
remodel kitche, new cabinets and fixtures. add 30 sq ft of floor space in lightwell, lightwell deck, | $25,000 |
| Sep 8, 2003 | Completed final sign-off Mar 2004 | 771 33rd Av | new deck with stair to backyardDetails
new deck with stair to backyard | $7,500 |
| Jul 2, 2002 | Completed final sign-off Nov 2002 | 415 Bosworth St | repair of back deck (addition to previous permit under construction)repair work will be less than 50Details
repair of back deck (addition to previous permit under construction)repair work will be less than 50 | $7,500 |
| Apr 8, 2002 | Completed final sign-off May 2002 | 116 Ellsworth St | replace rear deckDetails
replace rear deck | $4,000 |
| Jun 16, 2000 | Expired or cancelled expired Jul 2001 | 175 Commonwealth Av | legalize deck, alter kitchen, sitting rm, breakfast rm, replace wall w/steel beam seismic u/g @ rearDetails
legalize deck, alter kitchen, sitting rm, breakfast rm, replace wall w/steel beam seismic u/g @ rear | $50,000 |