Back to kitchen remodel contractors
Riley Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2012
- Last 24 months
- 0 permits filed
53 permits since 2000: 41 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2010 | Completed final sign-off Sep 2011 | 45 Melba Av | minor kitchen remodel to include: replace countertops to (e) cabinets, new vinyl floor, crown moulding, repair dryrot @ (e) rear window opening. install marvin insulated ultimate french replacement casement windows (2) at (e) window openings. no change to apprarence and fixtures, no structural modifDetails
minor kitchen remodel to include: replace countertops to (e) cabinets, new vinyl floor, crown moulding, repair dryrot @ (e) rear window opening. install marvin insulated ultimate french replacement casement windows (2) at (e) window openings. no change to apprarence and fixtures, no structural modif | $14,500 |
| Jul 24, 2009 | Completed final sign-off Aug 2009 | 756 Mission St | revision to permit application #200804180096. provide new 3-compartment sink @ kitchen and storage room.Details
revision to permit application #200804180096. provide new 3-compartment sink @ kitchen and storage room. | $2,000 |
| Apr 18, 2008 | Completed final sign-off Aug 2009 | 756 Mission St | kitchen remodel, electrical modifications, various doors and railing modifications to meet disabled access requirements. new exhaust flue at exterior (not visible from street)Details
kitchen remodel, electrical modifications, various doors and railing modifications to meet disabled access requirements. new exhaust flue at exterior (not visible from street) | $100,000 |
| Apr 24, 2006 | Completed final sign-off Nov 2006 | 1642 Funston Av | ceiling framing for kitchenDetails
ceiling framing for kitchen | $3,000 |
| Feb 3, 2006 | Completed final sign-off Nov 2006 | 1642 Funston Av | remodel (e) kitchen and breakfast nook, new cabinets, countertops, flooring, appliances, replace (e) lath and plaster wall and ceiling surfaces with new 5/8" type x sheetrockDetails
remodel (e) kitchen and breakfast nook, new cabinets, countertops, flooring, appliances, replace (e) lath and plaster wall and ceiling surfaces with new 5/8" type x sheetrock | $49,000 |
| Jul 15, 2005 | Expired or cancelled expired Dec 2006 | 1689 17th Av | remodel existing kitchen;new 5/8 sf (n) insulation r-13 ext walls r-19 ceiling; (n) cabinetry, (n) aDetails
remodel existing kitchen;new 5/8 sf (n) insulation r-13 ext walls r-19 ceiling; (n) cabinetry, (n) a | $42,000 |
| Aug 22, 2003 | Never finaled issued Aug 2003, no final | 1358 16th Av | increase opening at doorway/opneing hallway to kitchen. as shown in drawings by jim begunger aia. daDetails
increase opening at doorway/opneing hallway to kitchen. as shown in drawings by jim begunger aia. da | $1,200 |
| Jul 23, 2003 | Never finaled issued Jul 2003, no final | 1358 16th Av | remodel one bathrm at 1st fl & 2nd fl. instal new ceramic tiles at kitchen/pantry/dinette floor.Details
remodel one bathrm at 1st fl & 2nd fl. instal new ceramic tiles at kitchen/pantry/dinette floor. | $17,000 |
| Jan 6, 2003 | Completed final sign-off Mar 2004 | 20 Topaz Wy | remodel kitchen & powder room @ 1st flr.remodel one bathrm @ 2nd flr. work to include replacement ofDetails
remodel kitchen & powder room @ 1st flr.remodel one bathrm @ 2nd flr. work to include replacement of | $45,000 |
| Jul 18, 2000 | Completed final sign-off Jan 2001 | 185 Gates St | remodel kitchen & bath,cabinets,countertops,linoleum flooring, tub,toilet,lav,vnity,repair subfloorDetails
remodel kitchen & bath,cabinets,countertops,linoleum flooring, tub,toilet,lav,vnity,repair subfloor | $38,000 |