Back to bathroom remodel contractors
Riley Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2012
- Last 24 months
- 0 permits filed
53 permits since 2000: 41 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2012 | Never finaled issued Feb 2012, no final | 1622 Funston Av | partial voluntary seismic improvements at basement level to replace approx 94lf of inadequate concrete and brick foundation walls. create new bathroom at unfinished basement level.Details
partial voluntary seismic improvements at basement level to replace approx 94lf of inadequate concrete and brick foundation walls. create new bathroom at unfinished basement level. | $36,000 |
| Nov 9, 2010 | Completed final sign-off Apr 2011 | 43 Homestead St | remodel existing master bathroom, replace fixtures, vanity, countertop and tile. no exterior changes or structural modifications, replacement lighting to comply with title 24.Details
remodel existing master bathroom, replace fixtures, vanity, countertop and tile. no exterior changes or structural modifications, replacement lighting to comply with title 24. | $18,500 |
| Sep 14, 2009 | Completed final sign-off Jun 2010 | 1435 Portola Dr | replace 21 windows in kind, remodel 2 baths 2nd fl, replace insulation, remove wood burning fireplace and chimney/rplace with sealed unit. replace fau system and garage door.Details
replace 21 windows in kind, remodel 2 baths 2nd fl, replace insulation, remove wood burning fireplace and chimney/rplace with sealed unit. replace fau system and garage door. | $8,500 |
| Aug 14, 2009 | Completed final sign-off Jun 2010 | 1435 Portola Dr | remodel existing laurndry room and 1/2 bath at ground floor. to include new sheetrock, tile, toilet, and lav at bath. repair of dryrot at laundry and bath floorsDetails
remodel existing laurndry room and 1/2 bath at ground floor. to include new sheetrock, tile, toilet, and lav at bath. repair of dryrot at laundry and bath floors | $15,000 |
| Aug 13, 2003 | Expired or cancelled expired Jan 2007 | 964 Noe St | remodel exist 2nd fl bathroom-removal of nonbearing partition wall.add master bath &exist bath.Details
remodel exist 2nd fl bathroom-removal of nonbearing partition wall.add master bath &exist bath. | $42,000 |
| Apr 8, 2003 | Expired or cancelled expired Oct 2006 | 34 Shore View Av | install pocket doors @dining room to breakfast partition wall, remodel 2/f master bath, install (n)Details
install pocket doors @dining room to breakfast partition wall, remodel 2/f master bath, install (n) | $42,000 |
| Jul 18, 2000 | Completed final sign-off Jan 2001 | 185 Gates St | remodel kitchen & bath,cabinets,countertops,linoleum flooring, tub,toilet,lav,vnity,repair subfloorDetails
remodel kitchen & bath,cabinets,countertops,linoleum flooring, tub,toilet,lav,vnity,repair subfloor | $38,000 |