Riley Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2012
- Last 24 months
- 0 permits filed
53 permits since 2000: 41 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2011 | Completed final sign-off Apr 2012 | 292 Gold Mine Dr | replace wood raling at existing deck. new deck rail to be 42" high with 2x2 balusters, open space not to exceed 4". install new copper flashings at deck joist connection to house. patch cedar shingles at area of new flashings. no structural modifications.Details
replace wood raling at existing deck. new deck rail to be 42" high with 2x2 balusters, open space not to exceed 4". install new copper flashings at deck joist connection to house. patch cedar shingles at area of new flashings. no structural modifications. | $1,500 |
| May 5, 2010 | Completed final sign-off Jun 2010 | 2239 15th St | less < 50% total; repair deck for dry-rot. no struct. or arch. additions or mod. add mtl. connectors @ (e) post to beam connection. replace damaged stair treads at ground to 1st. level. replace damage jts. & deck bd. @ 1st. level. replace damaged stringers & treads @ 1st. deck to intermidiate landiDetails
less < 50% total; repair deck for dry-rot. no struct. or arch. additions or mod. add mtl. connectors @ (e) post to beam connection. replace damaged stair treads at ground to 1st. level. replace damage jts. & deck bd. @ 1st. level. replace damaged stringers & treads @ 1st. deck to intermidiate landi | $8,500 |
| Mar 15, 2004 | Completed final sign-off Jun 2004 | 1358 14th Av | repair for dry rot at rear deck and stairs, extensive dry rot requires total rebuildingDetails
repair for dry rot at rear deck and stairs, extensive dry rot requires total rebuilding | $5,800 |
| Sep 18, 2003 | Completed final sign-off Dec 2004 | 1358 16th Av | demo non conforming rear exit stairs.replace w/new 3 story stairway & deck to accommodate new handicDetails
demo non conforming rear exit stairs.replace w/new 3 story stairway & deck to accommodate new handic | $24,000 |
| Aug 9, 2002 | Completed final sign-off Aug 2002 | 55 Anzavista Av | dry rot repair at rear deck, repair only,no structural changes,all in kind lumber pressure treatedDetails
dry rot repair at rear deck, repair only,no structural changes,all in kind lumber pressure treated | $2,800 |
| Jan 18, 2001 | Expired or cancelled expired May 2001 | 2239 15th St | repair wood decking for dry rot at existing entry stairs/landing @ front of bldg. no structural modiDetails
repair wood decking for dry rot at existing entry stairs/landing @ front of bldg. no structural modi | $500 |