Back to kitchen remodel contractors
Richlen Construction
- Based in
- Pacheco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 61 permits filed
1,284 permits since 2000: 1,105 completed, 33 in progress, 62 never finaled, 84 expired or cancelled.
Of the 62 never-finaled permits, 1 is 3 to 5 years old, 25 are 5 to 10 years old, 36 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 5 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2023 | Completed final sign-off Feb 2024 | 188 Spear St | selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.Details
selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017. | $225,000 |
| Mar 22, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | 7/f: revision to p #202212158405, 7' wide double glass frameless door to large conf room in lieu of sliding glass, (n) conf rooms 717 & 718 not beng built, drywall & sliding dloors @ mtg & phone rm, keep rolling ladder & shelves @ nw corner, no wall coverings & kitchen millwork configurationDetails
7/f: revision to p #202212158405, 7' wide double glass frameless door to large conf room in lieu of sliding glass, (n) conf rooms 717 & 718 not beng built, drywall & sliding dloors @ mtg & phone rm, keep rolling ladder & shelves @ nw corner, no wall coverings & kitchen millwork configuration | $300,000 |
| Mar 5, 2021 | Completed final sign-off Jun 2024 | 401 Mason St | nightclub was forced to close due to sanitary sewer leak from tenant above. removed all of the interiror fiinshes and furningings, including bar and kitchen equipment, gyp board from walls and ceilings, flooring, lighting and ductwork, upgrades to the bathroom, stairs, elevator, andDetails
nightclub was forced to close due to sanitary sewer leak from tenant above. removed all of the interiror fiinshes and furningings, including bar and kitchen equipment, gyp board from walls and ceilings, flooring, lighting and ductwork, upgrades to the bathroom, stairs, elevator, and | $200,000 |
| May 20, 2008 | Completed final sign-off Dec 2008 | 350 Rhode Island St | 4th floor: in the pastry/chocolate kitchen #407 - adding new denhumidification unit in the ceiling plenum to produce humidity levels of 35% rh. adding new supplemental water source ac unit in the ceiling plenum.Details
4th floor: in the pastry/chocolate kitchen #407 - adding new denhumidification unit in the ceiling plenum to produce humidity levels of 35% rh. adding new supplemental water source ac unit in the ceiling plenum. | $10,000 |
| May 2, 2008 | Completed final sign-off Oct 2008 | 1 Market St | ti for 14th floor. demo and relocate hvac duct and vav box, add new exhaust fans and relocate induction units. demo plumbing for shower and kitchen. relocate and add new lights. sprinkler and fire alarm on seperate permit ref. pa# 2008/03/31/8393Details
ti for 14th floor. demo and relocate hvac duct and vav box, add new exhaust fans and relocate induction units. demo plumbing for shower and kitchen. relocate and add new lights. sprinkler and fire alarm on seperate permit ref. pa# 2008/03/31/8393 | $175,000 |
| Jul 10, 2007 | Completed final sign-off Nov 2007 | 350 Rhode Island St | office tenant improvement: (1) conference room, (1) classroom w/ kitchen, general office area, lounge reception / waiting, & storage. groundfloor (aka second floor)Details
office tenant improvement: (1) conference room, (1) classroom w/ kitchen, general office area, lounge reception / waiting, & storage. groundfloor (aka second floor) | $200,000 |
| Oct 3, 2005 | Completed final sign-off Dec 2005 | 88 King St | add structural slab infill; demolish some interior partitions; add new interior partitions, plumbing fixtures, lighting & kitchen island.Details
add structural slab infill; demolish some interior partitions; add new interior partitions, plumbing fixtures, lighting & kitchen island. | $25,000 |