Richbay Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to May 2025
- Last 24 months
- 2 permits filed
19 permits since 2000: 14 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 expired or cancelled. Typically 126 days from filing to permit and 705 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2023 | Completed final sign-off Sep 2025 | 92 Everglade Dr | garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney.Details
garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney. | $100,000 |
| Mar 21, 2019 | Completed final sign-off Dec 2020 | 185 Haight St | ref #201806293405(r1), attic remodeling to 2 bedroom, 1 bath, 1 game room with 4 roof skylights, 1 stairs, basement foundation upgrade rear side foundations and alter foundation in center, 2' retaining wall in front, new 2'x 6" framing and new 5 1/4" x 14" psl beam with 3 6x6 post at left side.Details
ref #201806293405(r1), attic remodeling to 2 bedroom, 1 bath, 1 game room with 4 roof skylights, 1 stairs, basement foundation upgrade rear side foundations and alter foundation in center, 2' retaining wall in front, new 2'x 6" framing and new 5 1/4" x 14" psl beam with 3 6x6 post at left side. | $40,000 |
| Jun 29, 2018 | Completed final sign-off Dec 2020 | 185 Haight St | convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansionDetails
convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansion | $100,000 |
| Sep 20, 2017 | Expired or cancelled expired Feb 2023 | 1315 Monterey Bl | 1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to incluDetails
1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to inclu | $350,000 |