Back to bathroom remodel contractors
Richbay Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to May 2025
- Last 24 months
- 2 permits filed
19 permits since 2000: 14 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 43 days from filing to permit and 480 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2023 | Completed final sign-off Sep 2025 | 92 Everglade Dr | garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney.Details
garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney. | $100,000 |
| Sep 21, 2023 | Completed final sign-off Feb 2024 | 2263 Market St | unit 2: replace kitchen cabinet, vinyl flooring, bathroom vanity & toilet, all in-kindDetails
unit 2: replace kitchen cabinet, vinyl flooring, bathroom vanity & toilet, all in-kind | |
| Oct 28, 2022 | Completed final sign-off Apr 2023 | 1308 18th Av | kitchen and bathroom remodel. counter and fixtures replacement in kind. no change floor plan and layout. no plan permit. work in both residential units in kind.Details
kitchen and bathroom remodel. counter and fixtures replacement in kind. no change floor plan and layout. no plan permit. work in both residential units in kind. | $20,000 |
| Mar 9, 2021 | Completed final sign-off Mar 2023 | 1201 Fitzgerald Av | proposed adding one master bedroom & a family room (including one full bathroom) on g/f. to comply with nov20271677.Details
proposed adding one master bedroom & a family room (including one full bathroom) on g/f. to comply with nov20271677. | $50,000 |
| Jul 21, 2020 | Completed final sign-off Dec 2020 | 1574 39th Av | reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood.Details
reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood. | $30,000 |
| Mar 21, 2019 | Completed final sign-off Dec 2020 | 185 Haight St | ref #201806293405(r1), attic remodeling to 2 bedroom, 1 bath, 1 game room with 4 roof skylights, 1 stairs, basement foundation upgrade rear side foundations and alter foundation in center, 2' retaining wall in front, new 2'x 6" framing and new 5 1/4" x 14" psl beam with 3 6x6 post at left side.Details
ref #201806293405(r1), attic remodeling to 2 bedroom, 1 bath, 1 game room with 4 roof skylights, 1 stairs, basement foundation upgrade rear side foundations and alter foundation in center, 2' retaining wall in front, new 2'x 6" framing and new 5 1/4" x 14" psl beam with 3 6x6 post at left side. | $40,000 |
| Jun 29, 2018 | Completed final sign-off Dec 2020 | 185 Haight St | convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansionDetails
convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansion | $100,000 |