Back to kitchen remodel contractors
Richbay Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to May 2025
- Last 24 months
- 2 permits filed
19 permits since 2000: 14 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 expired or cancelled. Typically 14 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2025 | Completed final sign-off Jun 2025 | 2433 Lake St | admin permit for change of address from address 2435 lake st to 2433 lake st only for kitchen remodel to include cabinet and countertop replacement and (e) backdoor and window in same area no work being done.Details
admin permit for change of address from address 2435 lake st to 2433 lake st only for kitchen remodel to include cabinet and countertop replacement and (e) backdoor and window in same area no work being done. | |
| Mar 26, 2025 | Completed final sign-off Jun 2025 | 2435 Lake St | kitchen remodel: relocate exit door and enclose 1-window in nook area. no structural changes. replace cabinets and counter tops.Details
kitchen remodel: relocate exit door and enclose 1-window in nook area. no structural changes. replace cabinets and counter tops. | $20,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2025 | 92 Everglade Dr | garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney.Details
garage remodel to add 1 bedroom, 1 bath, 1 laundry. 2nd fl add 1 full bath, switch staircase from kitchen to entrance foyer, new spc flooring. int/ext paint. new kitchen cabinet. add stari and landing at rear, replace all windows, remove the existing chimney. | $100,000 |
| Sep 21, 2023 | Completed final sign-off Feb 2024 | 2263 Market St | unit 2: replace kitchen cabinet, vinyl flooring, bathroom vanity & toilet, all in-kindDetails
unit 2: replace kitchen cabinet, vinyl flooring, bathroom vanity & toilet, all in-kind | |
| Oct 28, 2022 | Completed final sign-off Apr 2023 | 1308 18th Av | kitchen and bathroom remodel. counter and fixtures replacement in kind. no change floor plan and layout. no plan permit. work in both residential units in kind.Details
kitchen and bathroom remodel. counter and fixtures replacement in kind. no change floor plan and layout. no plan permit. work in both residential units in kind. | $20,000 |
| Mar 22, 2022 | Expired or cancelled cancelled Sep 2023 | 2263 Market St | unit #2 (2nd flr), #3 & #4 (3rd flr): interior remodel. kitchen remodel in-kind. replace cabinet, electrical & electrical upgrade to code. new laundry for unit #3, 4 in kitchen area.Details
unit #2 (2nd flr), #3 & #4 (3rd flr): interior remodel. kitchen remodel in-kind. replace cabinet, electrical & electrical upgrade to code. new laundry for unit #3, 4 in kitchen area. | $20,000 |
| Jul 21, 2020 | Completed final sign-off Dec 2020 | 1574 39th Av | reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood.Details
reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood. | $30,000 |
| Jun 29, 2018 | Completed final sign-off Dec 2020 | 185 Haight St | convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansionDetails
convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansion | $100,000 |