Back to kitchen remodel contractors
Rhapsody Painting And Environmental Svc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Jun 2024
- Last 24 months
- 0 permits filed
53 permits since 2000: 39 completed, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 never finaled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2021 | Completed final sign-off May 2022 | 2721 20th St | work to conform to his complaints 202177781, 202178672, 202178673, 202178674, kitchen cabinets, window as specified, stairs (rear), kitchen floor tiles or linoleum. windows not facing street.Details
work to conform to his complaints 202177781, 202178672, 202178673, 202178674, kitchen cabinets, window as specified, stairs (rear), kitchen floor tiles or linoleum. windows not facing street. | $30,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 2557 Alemany Bl | remodel kitchen & bathroom; paint interior/ exteriorDetails
remodel kitchen & bathroom; paint interior/ exterior | $60,000 |
| May 30, 2017 | Completed final sign-off Oct 2017 | 3840 Folsom St | electrical update all 4 units. upgrade 3 bathrooms, 3 kitchens. paint all unit, wall repairs, connect to (e) exhaust ducts.Details
electrical update all 4 units. upgrade 3 bathrooms, 3 kitchens. paint all unit, wall repairs, connect to (e) exhaust ducts. | $90,000 |
| May 22, 2017 | Completed final sign-off Oct 2017 | 1500 Cortland Av | replace existing aluminum framed windows with fiberglass framded windows in same configuration; install vinyl windows in lightwells facing street. max u-factor .32. 4 kitchen and bathroom updates. electrical updates, one water heater.(install new wall heaters, gas remove and replace "direct ventDetails
replace existing aluminum framed windows with fiberglass framded windows in same configuration; install vinyl windows in lightwells facing street. max u-factor .32. 4 kitchen and bathroom updates. electrical updates, one water heater.(install new wall heaters, gas remove and replace "direct vent | $105,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2019 | 380 San Jose Av | apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units.Details
apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units. | $25,000 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 1353 Folsom St | to comply with #2 -nov 201553251, replace 18 windows (vinyl) not visble from the street in kind size, to comply with #2 & #3 nov 201550832 - stair repairs 20% kitchen cabinet replacement.Details
to comply with #2 -nov 201553251, replace 18 windows (vinyl) not visble from the street in kind size, to comply with #2 & #3 nov 201550832 - stair repairs 20% kitchen cabinet replacement. | $21,000 |
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 380 San Jose Av | exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors inDetails
exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors in | $65,000 |
| Jul 22, 2014 | Completed final sign-off Jul 2014 | 486 Hayes St | replace kitchen window, u-factor = 0.32 max. paint bathroom.Details
replace kitchen window, u-factor = 0.32 max. paint bathroom. | $1,200 |
| May 8, 2013 | Never finaled issued May 2013, no final | 344 Spruce St | update breaker box, minor repair to windows, sash cords & painting them, wood work, repair cabinets in kitchen. (unit # 344 spruce only)Details
update breaker box, minor repair to windows, sash cords & painting them, wood work, repair cabinets in kitchen. (unit # 344 spruce only) | $4,000 |
| Apr 1, 2013 | Never finaled issued Apr 2013, no final | 342 Spruce St | handrail -36" high- spindler by 4" center. install new cabinets in kitchen & sink. new electrical switches & plugs, repaint, refinish floors. smoke detector, handrail repair. floors, repair broken glass, provide heat in all bedrooms to comply with complaint #201281111Details
handrail -36" high- spindler by 4" center. install new cabinets in kitchen & sink. new electrical switches & plugs, repaint, refinish floors. smoke detector, handrail repair. floors, repair broken glass, provide heat in all bedrooms to comply with complaint #201281111 | $15,000 |