Back to bathroom remodel contractors
Rhapsody Painting And Environmental Svc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Jun 2024
- Last 24 months
- 0 permits filed
53 permits since 2000: 39 completed, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 2557 Alemany Bl | remodel kitchen & bathroom; paint interior/ exteriorDetails
remodel kitchen & bathroom; paint interior/ exterior | $60,000 |
| May 30, 2017 | Completed final sign-off Oct 2017 | 3840 Folsom St | electrical update all 4 units. upgrade 3 bathrooms, 3 kitchens. paint all unit, wall repairs, connect to (e) exhaust ducts.Details
electrical update all 4 units. upgrade 3 bathrooms, 3 kitchens. paint all unit, wall repairs, connect to (e) exhaust ducts. | $90,000 |
| May 22, 2017 | Completed final sign-off Oct 2017 | 1500 Cortland Av | replace existing aluminum framed windows with fiberglass framded windows in same configuration; install vinyl windows in lightwells facing street. max u-factor .32. 4 kitchen and bathroom updates. electrical updates, one water heater.(install new wall heaters, gas remove and replace "direct ventDetails
replace existing aluminum framed windows with fiberglass framded windows in same configuration; install vinyl windows in lightwells facing street. max u-factor .32. 4 kitchen and bathroom updates. electrical updates, one water heater.(install new wall heaters, gas remove and replace "direct vent | $105,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2019 | 380 San Jose Av | apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units.Details
apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units. | $25,000 |
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 380 San Jose Av | exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors inDetails
exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors in | $65,000 |
| Jul 22, 2014 | Completed final sign-off Jul 2014 | 486 Hayes St | replace kitchen window, u-factor = 0.32 max. paint bathroom.Details
replace kitchen window, u-factor = 0.32 max. paint bathroom. | $1,200 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 933 Stanyan St | kitche & 1 1/2 bathroom remodel.Details
kitche & 1 1/2 bathroom remodel. | $3,500 |
| Apr 1, 2013 | Never finaled issued Apr 2013, no final | 348 Spruce St | replace window in bathroom, not visible from street. replace bath window/install new plugs/switches thru out apartment. repair ceiling, walls, window sash cord, replace handrail - install somke detector, repair broken glass, install correct sash, provide heat in bedrooms, in complain w/complaint #20Details
replace window in bathroom, not visible from street. replace bath window/install new plugs/switches thru out apartment. repair ceiling, walls, window sash cord, replace handrail - install somke detector, repair broken glass, install correct sash, provide heat in bedrooms, in complain w/complaint #20 | $2,500 |