Block 6532, lot 034
380 San Jose Ave
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 4
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,394 sq ft
- Lot
- 3,245 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2026 | In progress issued Mar 2026 | 380 San Jose Av | Elias Hom Improvements | replacing 4 gas water heater with electric hybrid water heater. install 4 in the garage. run electrical circuit and disconnect for each. connect electrical (30 amp). cap the gas line.Details
replacing 4 gas water heater with electric hybrid water heater. install 4 in the garage. run electrical circuit and disconnect for each. connect electrical (30 amp). cap the gas line. | $13,800 |
| Mar 17, 2017 | Completed final sign-off Jun 2017 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | voluntary retrofit at ground floor.Details
voluntary retrofit at ground floor. | $5,000 |
| Mar 17, 2017 | Completed final sign-off May 2017 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | repair retaining wall @ front garden. remove & retain the railing.Details
repair retaining wall @ front garden. remove & retain the railing. | $10,000 |
| Jan 5, 2017 | Expired or cancelled withdrawn Jan 2017 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | garden wall, communication improvement unit #2, structural retrofit- voluntary improvement entrance steps and retaining wall repair sidewalkDetails
garden wall, communication improvement unit #2, structural retrofit- voluntary improvement entrance steps and retaining wall repair sidewalk | $20,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2019 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units.Details
apt 3: replace kitchen cab, sink. bathroom: replace toilet,reglaze tub & tiles. replace 3 vinyl windows not visible from st. apt 4: r/r kitchen cbainets & sink. bathroom: replace toilet , replace tub, upgrade electrical in both units. | $25,000 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 380 San Jose Av | street space permitDetails
street space permit | ||
| Sep 20, 2016 | Completed final sign-off Feb 2017 | 380 San Jose Av | Rhapsody Painting And Environmental Svc | exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors inDetails
exterior local siding repairs and paint (40 sq. ft). replace 6 windows vinyl (3) in unit 1 and 3 in unit 2. u fact<.32 not visible from st. unit 1 kitchen remodel, unit 1 and 2 replace vanity, electric upgrade toilet in both bathrooms. repair the rear stairs. install co2 and smoke detectors in | $65,000 |
| Sep 14, 2016 | Never finaled issued Sep 2016, no final | 380 San Jose Av | street spaceDetails
street space | ||
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 380 San Jose Av | Ampex Engineering & Co | make repairs to items in nov including window repair, electrical repairs, water heater repair (item # 2, #5, #6)Details
make repairs to items in nov including window repair, electrical repairs, water heater repair (item # 2, #5, #6) | $400 |
| Sep 9, 2013 | Completed final sign-off Nov 2013 | 380 San Jose Av | Ampex Engineering & Co | repair railing 20' at side walkway; repair & replace broken windows at rear of bldg; install permanent heat source for unit 4; install pan & drain line & strapping for (e) w/h in units 3 & 4; repair hallway light o/s unit 3 & 4; install stove hood & vent for unit 4.Details
repair railing 20' at side walkway; repair & replace broken windows at rear of bldg; install permanent heat source for unit 4; install pan & drain line & strapping for (e) w/h in units 3 & 4; repair hallway light o/s unit 3 & 4; install stove hood & vent for unit 4. | $600 |
| Jan 24, 2003 | Completed final sign-off Feb 2003 | 380 San Jose Av | repair 30% of rear deck. to comply w/ h.i.s. nov issued 12/22/02 complaint#200235109 to complete allDetails
repair 30% of rear deck. to comply w/ h.i.s. nov issued 12/22/02 complaint#200235109 to complete all | $500 | |
| May 9, 2000 | Completed final sign-off May 2000 | 380 San Jose Av | remove bedding/furnishings and sink from garage areaDetails
remove bedding/furnishings and sink from garage area | $500 | |
| Apr 20, 2000 | Expired or cancelled expired Aug 2000 | 380 San Jose Av | Khoury Construction | comply with n.o.v. painting kitchen, repair broken glass on windowDetails
comply with n.o.v. painting kitchen, repair broken glass on window | $2,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rhapsody Painting And Environmental Svc (5), Ampex Engineering & Co (2), Elias Hom Improvements, Khoury Construction
- Engineers
- David J. Messmer, Geronimo Daliva, Jaime B. Neilson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.