Reeb Design & Build Inc
- Based in
- Oakland
- On San Francisco permits
- May 2021 to Dec 2025
- Last 24 months
- 5 permits filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 119 days from filing to permit and 646 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2021 | Completed final sign-off Jun 2023 | 542 Valley St | renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure belowDetails
renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure below | $100,000 |