Back to bathroom remodel contractors
Reeb Design & Build Inc
- Based in
- Oakland
- On San Francisco permits
- May 2021 to Dec 2025
- Last 24 months
- 5 permits filed
10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 119 days from filing to permit and 535 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2024 | In progress issued Aug 2025 | 49 Hartford St | rear addition on 3 levels full kitchen and bathroom remodel. addition of a half bathroom, (n) interior balustrade, new skylights on 3rd floor,new window, upgrade hvac, and add (n) rear deck.Details
rear addition on 3 levels full kitchen and bathroom remodel. addition of a half bathroom, (n) interior balustrade, new skylights on 3rd floor,new window, upgrade hvac, and add (n) rear deck. | $1,200,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2026 | 300 Beale St | interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan.Details
interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan. | $470,000 |
| May 25, 2021 | Completed final sign-off Jun 2023 | 542 Valley St | renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure belowDetails
renovation of e single family, 3 1/2 bath, 4 bdrm home. basement and stair to 1st sfl. add 1 bdrm,1 full bath. ex basement floor to drop 18" throughout building footprint. project to preserve japanese deck in rear with new structure below | $100,000 |