10 permits since 2000: 7 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 in progress. Typically 34 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress issued Feb 2026 | 49 Hartford St | revision to 202411124801. includes relocation of heat pump units from rear yard to a new rooftop mechanical platform. demo e slab at hall 002 to lower finish floor at garage. additional stepped landscape at rt wall to allow for grade change. add sink to kitchen island.Details
revision to 202411124801. includes relocation of heat pump units from rear yard to a new rooftop mechanical platform. demo e slab at hall 002 to lower finish floor at garage. additional stepped landscape at rt wall to allow for grade change. add sink to kitchen island. | $10,000 |
| Dec 23, 2024 | In progress issued Aug 2025 | 49 Hartford St | rear addition on 3 levels full kitchen and bathroom remodel. addition of a half bathroom, (n) interior balustrade, new skylights on 3rd floor,new window, upgrade hvac, and add (n) rear deck.Details
rear addition on 3 levels full kitchen and bathroom remodel. addition of a half bathroom, (n) interior balustrade, new skylights on 3rd floor,new window, upgrade hvac, and add (n) rear deck. | $1,200,000 |
| Oct 23, 2024 | Completed final sign-off Jan 2026 | 300 Beale St | interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan.Details
interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan. | $470,000 |
| Apr 25, 2024 | Completed final sign-off Sep 2024 | 221 Collingwood St | remodel kitchen, in-kind. new cabinets, counter tops, flooring & paint. non structuralDetails
remodel kitchen, in-kind. new cabinets, counter tops, flooring & paint. non structural | $4,000 |