Back to kitchen remodel contractors
Redican Homes
- Based in
- Petaluma
- On San Francisco permits
- May 2011 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 16 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 56 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2021 | Completed final sign-off Apr 2022 | 319 Banks St | interior kitchen/bath renovation. addition of 2 skylights. replacement of 2 doors and 2 windows on 1/f, and 3 windows at rear of the bldg on 2/f. conversion of 526 sf unconditional garage space into conditioned space on ground floor/1st level. reroof existing roof.Details
interior kitchen/bath renovation. addition of 2 skylights. replacement of 2 doors and 2 windows on 1/f, and 3 windows at rear of the bldg on 2/f. conversion of 526 sf unconditional garage space into conditioned space on ground floor/1st level. reroof existing roof. | $80,000 |
| Feb 11, 2020 | Never finaled issued Feb 2021, no final | 610 16th Av | small rear expansion. fill in 4'x10' area @ rear of (e) structure for interior stair. proposed addition increases (e) footprint by 40 sf & extends vertically (2) stories of the (3) story building. interior renovation of (e) kitchen, mudroom & replacement of all (e) windows @ rear west face of bldgDetails
small rear expansion. fill in 4'x10' area @ rear of (e) structure for interior stair. proposed addition increases (e) footprint by 40 sf & extends vertically (2) stories of the (3) story building. interior renovation of (e) kitchen, mudroom & replacement of all (e) windows @ rear west face of bldg | $80,000 |
| Apr 5, 2018 | Completed final sign-off Dec 2019 | 3580 Pierce St | interior remodel to include expansion of the existing doorway leading into the dining and relocation of (e) doorway from hall into kitchen. maher ord 155-13 naDetails
interior remodel to include expansion of the existing doorway leading into the dining and relocation of (e) doorway from hall into kitchen. maher ord 155-13 na | $100,000 |
| Aug 10, 2017 | Completed final sign-off May 2019 | 2500 Green St | interior renovation of (e) 5767sf single family, 4 story rh-1 home. renovation including 5-1/2 baths, 1 kitchenette, 1 kitchen laundry area and 1 bedroom. building footprint to remain unchanged.Details
interior renovation of (e) 5767sf single family, 4 story rh-1 home. renovation including 5-1/2 baths, 1 kitchenette, 1 kitchen laundry area and 1 bedroom. building footprint to remain unchanged. | $375,000 |
| Mar 16, 2017 | Completed final sign-off Jul 2017 | 1170 Sacramento St | unit 4a-4th floor: interior demo of non bearing partitions kitchen, dining, bath, no changes to foot print ext. walls elev. vestibule, new kitchecn cabinets, bath, appliance, upgrade lighting, and subpanelDetails
unit 4a-4th floor: interior demo of non bearing partitions kitchen, dining, bath, no changes to foot print ext. walls elev. vestibule, new kitchecn cabinets, bath, appliance, upgrade lighting, and subpanel | $55,000 |
| Jan 14, 2016 | Completed final sign-off May 2016 | 1070 Green St | apt. #1402: interior demo of non-load bearing partition walls, remodel kitchen & bath, relocation and construction of new interior non-load bearing partition walls. ceiling patched and repaired.Details
apt. #1402: interior demo of non-load bearing partition walls, remodel kitchen & bath, relocation and construction of new interior non-load bearing partition walls. ceiling patched and repaired. | $175,000 |
| Mar 13, 2015 | Completed final sign-off Nov 2016 | 22 Dawnview Wy | construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14.Details
construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14. | $225,000 |
| May 2, 2012 | Completed final sign-off May 2013 | 1115 Union St | 2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard.Details
2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard. | $50,000 |