Redican Homes
- Based in
- Petaluma
- On San Francisco permits
- May 2011 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 16 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 never finaled. Typically 164 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2017 | Completed final sign-off Mar 2019 | 56 Lloyd St | revision to 201706210014. rev to deck structuralDetails
revision to 201706210014. rev to deck structural | $7,000 |
| Mar 13, 2015 | Completed final sign-off Nov 2016 | 22 Dawnview Wy | construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14.Details
construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14. | $225,000 |
| Dec 18, 2012 | Never finaled issued Sep 2013, no final | 1115 Union St | enclose space below (e) deck to create new master bedroom w/ new windows & sliding glass doors. new internal stair fr level 1 to level2.renovate storage space as part of mstr suite incl 2 closets & 1 bathroom.new external stair to rear yard terraces.Details
enclose space below (e) deck to create new master bedroom w/ new windows & sliding glass doors. new internal stair fr level 1 to level2.renovate storage space as part of mstr suite incl 2 closets & 1 bathroom.new external stair to rear yard terraces. | $60,000 |
| May 2, 2012 | Completed final sign-off May 2013 | 1115 Union St | 2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard.Details
2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard. | $50,000 |