Back to bathroom remodel contractors
Redican Homes
- Based in
- Petaluma
- On San Francisco permits
- May 2011 to Sep 2022
- Last 24 months
- 0 permits filed
24 permits since 2000: 16 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 3 never finaled. Typically 47 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2022 | Never finaled issued Sep 2022, no final | 146 Avila St | renovation in kind of 1 bathroom: full bath.Details
renovation in kind of 1 bathroom: full bath. | $9,000 |
| Nov 16, 2021 | Never finaled issued Nov 2021, no final | 319 Banks St | rev to pa202103096224: bathroom layout change. change rear window to french doors on ground floor.Details
rev to pa202103096224: bathroom layout change. change rear window to french doors on ground floor. | |
| Mar 9, 2021 | Completed final sign-off Apr 2022 | 319 Banks St | interior kitchen/bath renovation. addition of 2 skylights. replacement of 2 doors and 2 windows on 1/f, and 3 windows at rear of the bldg on 2/f. conversion of 526 sf unconditional garage space into conditioned space on ground floor/1st level. reroof existing roof.Details
interior kitchen/bath renovation. addition of 2 skylights. replacement of 2 doors and 2 windows on 1/f, and 3 windows at rear of the bldg on 2/f. conversion of 526 sf unconditional garage space into conditioned space on ground floor/1st level. reroof existing roof. | $80,000 |
| Aug 10, 2017 | Completed final sign-off May 2019 | 2500 Green St | interior renovation of (e) 5767sf single family, 4 story rh-1 home. renovation including 5-1/2 baths, 1 kitchenette, 1 kitchen laundry area and 1 bedroom. building footprint to remain unchanged.Details
interior renovation of (e) 5767sf single family, 4 story rh-1 home. renovation including 5-1/2 baths, 1 kitchenette, 1 kitchen laundry area and 1 bedroom. building footprint to remain unchanged. | $375,000 |
| May 22, 2017 | Completed final sign-off Mar 2019 | 56 Lloyd St | renovation of extg 1178 sq ft ground level dwelling unit of a 2 unit r-3 residential building. no change to bldg footprint. electrical and plumbing work as required by code. extg 2 bed, 1 bath unit to be renovated to allow 3 bedrooms and one bath.Details
renovation of extg 1178 sq ft ground level dwelling unit of a 2 unit r-3 residential building. no change to bldg footprint. electrical and plumbing work as required by code. extg 2 bed, 1 bath unit to be renovated to allow 3 bedrooms and one bath. | $125,000 |
| Mar 16, 2017 | Completed final sign-off Jul 2017 | 1170 Sacramento St | unit 4a-4th floor: interior demo of non bearing partitions kitchen, dining, bath, no changes to foot print ext. walls elev. vestibule, new kitchecn cabinets, bath, appliance, upgrade lighting, and subpanelDetails
unit 4a-4th floor: interior demo of non bearing partitions kitchen, dining, bath, no changes to foot print ext. walls elev. vestibule, new kitchecn cabinets, bath, appliance, upgrade lighting, and subpanel | $55,000 |
| Jan 14, 2016 | Completed final sign-off May 2016 | 1070 Green St | apt. #1402: interior demo of non-load bearing partition walls, remodel kitchen & bath, relocation and construction of new interior non-load bearing partition walls. ceiling patched and repaired.Details
apt. #1402: interior demo of non-load bearing partition walls, remodel kitchen & bath, relocation and construction of new interior non-load bearing partition walls. ceiling patched and repaired. | $175,000 |
| Mar 13, 2015 | Completed final sign-off Nov 2016 | 22 Dawnview Wy | construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14.Details
construct 474 sq. ft.(e)unconditioned garage to conditioned space.(e) lower level kitchen, bedroom, bathroom &laundry room as well as the (e) upper level kitchen&bathroom to be remodeled&upgrade at(e)south facing doors&windows.repair or replace(e)decks,legalize dwelling unit ord #43-14. | $225,000 |
| Dec 18, 2012 | Never finaled issued Sep 2013, no final | 1115 Union St | enclose space below (e) deck to create new master bedroom w/ new windows & sliding glass doors. new internal stair fr level 1 to level2.renovate storage space as part of mstr suite incl 2 closets & 1 bathroom.new external stair to rear yard terraces.Details
enclose space below (e) deck to create new master bedroom w/ new windows & sliding glass doors. new internal stair fr level 1 to level2.renovate storage space as part of mstr suite incl 2 closets & 1 bathroom.new external stair to rear yard terraces. | $60,000 |
| May 2, 2012 | Completed final sign-off May 2013 | 1115 Union St | 2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard.Details
2nd level unit: remodel 1 kitchen and dining area (sink, countertop, cabinets). 2 baths (toilet, sink, vanity) french doors and install deck at rear of building and stair to yard. | $50,000 |
| May 3, 2011 | Completed final sign-off Jun 2011 | 439 Connecticut St | removal of (e) 2x4 non load bearing partition wall between (e) master bedroom & master bathroom on 2nd floor. construct new 2x4 load bearing partition wall between master bedroom & master bathroom. new finish to matchDetails
removal of (e) 2x4 non load bearing partition wall between (e) master bedroom & master bathroom on 2nd floor. construct new 2x4 load bearing partition wall between master bedroom & master bathroom. new finish to match | $6,000 |