Back to kitchen remodel contractors
Randomity Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 30 completed, 2 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 7 completed, 4 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2020 | Completed final sign-off Dec 2020 | 1388 Gough St | unit 401: kitchen remodeling in-kind.Details
unit 401: kitchen remodeling in-kind. | $10,000 |
| Dec 31, 2019 | Never finaled issued Aug 2023, no final | 533 Union St | legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14.Details
legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14. | $85,000 |
| Jun 28, 2016 | Expired or cancelled expired Dec 2017 | 329 18th Av | to comply w/ nov#201564441 - 3/f -fire restoration for entire unit, remodel 2 bathrooms, kitchen, replace water heater & furnace, junciton box, and all affected by fire, install new insulation & drywall affected by fire, no changes of walls layout.Details
to comply w/ nov#201564441 - 3/f -fire restoration for entire unit, remodel 2 bathrooms, kitchen, replace water heater & furnace, junciton box, and all affected by fire, install new insulation & drywall affected by fire, no changes of walls layout. | $100,000 |
| Jul 7, 2015 | Never finaled issued Sep 2015, no final | 632 London St | comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft.Details
comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft. | $40,000 |
| May 11, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit #2: remodel kitchen 100 s.ft.remodel 2 bathrooms 60 sf each, install new sub panel in unit ;4.replace 9 windows in kind wood tilt pack in side & back, not visible from street, u factor 0.32 max, replace hot water heater.Details
unit #2: remodel kitchen 100 s.ft.remodel 2 bathrooms 60 sf each, install new sub panel in unit ;4.replace 9 windows in kind wood tilt pack in side & back, not visible from street, u factor 0.32 max, replace hot water heater. | $30,000 |
| Apr 2, 2015 | Never finaled issued Oct 2015, no final | 2943 16th St | change of business ownership, minor replacement and relocation of commercial kitchen equip, furnishings and finishes, install new accessible restroom and power operated door opener. tankless water heater another permit, historical door another permit per plan. maher - not req'd. per plan.Details
change of business ownership, minor replacement and relocation of commercial kitchen equip, furnishings and finishes, install new accessible restroom and power operated door opener. tankless water heater another permit, historical door another permit per plan. maher - not req'd. per plan. | $25,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 4: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tile pack and back not visible from street and u-factor 0-32max, 5) replace water heater.Details
unit 4: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tile pack and back not visible from street and u-factor 0-32max, 5) replace water heater. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 1: 1) remodel kitchen (100sf), 2) remodel bathroom (60sf), 3) install subpanel in the unit, 4) install windows in-kind (u-factor 0.32 max) with wood til pack at the side & back not visible from the street, 5) replace water heater.Details
unit 1: 1) remodel kitchen (100sf), 2) remodel bathroom (60sf), 3) install subpanel in the unit, 4) install windows in-kind (u-factor 0.32 max) with wood til pack at the side & back not visible from the street, 5) replace water heater. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 3: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tilet pack and back not visible from street and u-factor 0-32max, 5) replace water heater.Details
unit 3: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tilet pack and back not visible from street and u-factor 0-32max, 5) replace water heater. | $30,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2013 | 456 Funston Av | radiant heater for floor kitchen ; 2 kw; change cabinets in kitchen, install led lights, removed some outlets, install tub at hallway bathroom, install shower at master bed, install recess lights at dining living rm, hallway & bedroom, lighting per cec 150(k)Details
radiant heater for floor kitchen ; 2 kw; change cabinets in kitchen, install led lights, removed some outlets, install tub at hallway bathroom, install shower at master bed, install recess lights at dining living rm, hallway & bedroom, lighting per cec 150(k) | $12,000 |
| Feb 25, 2013 | Completed final sign-off Sep 2013 | 149 Panama St | to com0ply w/ complaint#'s 201281484,201282265 & 201282271. restore original designed & used as single family dwelling. illegal kitchen on 1st & 3rd floors, remove cabinets, stove & doors. capped gas line terminate electrical not properly installed.Details
to com0ply w/ complaint#'s 201281484,201282265 & 201282271. restore original designed & used as single family dwelling. illegal kitchen on 1st & 3rd floors, remove cabinets, stove & doors. capped gas line terminate electrical not properly installed. | $2,000 |
| Feb 20, 2013 | Never finaled issued Mar 2013, no final | 159 Panama St | to comply w/ nov#201281485, 201282272 & 201282264. remove illegal kitchen on gr fl, convert back to family room. add washer and dryer & legalize (e) bathroom & bedroom at the garage. remove illegal kitchen from 3rd fl and legalize wetbar. confirm total of 5 full bathsDetails
to comply w/ nov#201281485, 201282272 & 201282264. remove illegal kitchen on gr fl, convert back to family room. add washer and dryer & legalize (e) bathroom & bedroom at the garage. remove illegal kitchen from 3rd fl and legalize wetbar. confirm total of 5 full baths | $15,000 |