Randomity Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 30 completed, 2 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 12 completed, 4 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2022 | Completed final sign-off Mar 2022 | 265 Central Av | to add one sink in half bathroom and open partial wall to add block header to able to run piping for the sink. insulation as needed, partial drywall after. to add one toilet in full bathroom & open the subfloor & partial wall, add sisters joist to create support from the running of the pipes.Details
to add one sink in half bathroom and open partial wall to add block header to able to run piping for the sink. insulation as needed, partial drywall after. to add one toilet in full bathroom & open the subfloor & partial wall, add sisters joist to create support from the running of the pipes. | $6,000 |
| Dec 31, 2019 | Never finaled issued Aug 2023, no final | 533 Union St | legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14.Details
legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14. | $85,000 |
| Apr 9, 2019 | Completed final sign-off Jul 2019 | 2741 Geary Bl | 2741a geary bl: front - interior remodel of existing top unit to add (n) bathroomDetails
2741a geary bl: front - interior remodel of existing top unit to add (n) bathroom | $10,000 |
| Jun 28, 2016 | Expired or cancelled expired Dec 2017 | 329 18th Av | to comply w/ nov#201564441 - 3/f -fire restoration for entire unit, remodel 2 bathrooms, kitchen, replace water heater & furnace, junciton box, and all affected by fire, install new insulation & drywall affected by fire, no changes of walls layout.Details
to comply w/ nov#201564441 - 3/f -fire restoration for entire unit, remodel 2 bathrooms, kitchen, replace water heater & furnace, junciton box, and all affected by fire, install new insulation & drywall affected by fire, no changes of walls layout. | $100,000 |
| Jul 7, 2015 | Never finaled issued Sep 2015, no final | 632 London St | comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft.Details
comply w/ nov 201486691 - 2nd floor: remodel (e) bathroom & reposition kitchen, add another bathroom @ living area. electrical upgrade, water heater upgrade, add bedroom, furnace replacement in kind, upgrade water lines & lateral sewer. backyard redo (e) concrete pad & replace (e) fence<6ft. | $40,000 |
| May 11, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit #2: remodel kitchen 100 s.ft.remodel 2 bathrooms 60 sf each, install new sub panel in unit ;4.replace 9 windows in kind wood tilt pack in side & back, not visible from street, u factor 0.32 max, replace hot water heater.Details
unit #2: remodel kitchen 100 s.ft.remodel 2 bathrooms 60 sf each, install new sub panel in unit ;4.replace 9 windows in kind wood tilt pack in side & back, not visible from street, u factor 0.32 max, replace hot water heater. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 4: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tile pack and back not visible from street and u-factor 0-32max, 5) replace water heater.Details
unit 4: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tile pack and back not visible from street and u-factor 0-32max, 5) replace water heater. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 1: 1) remodel kitchen (100sf), 2) remodel bathroom (60sf), 3) install subpanel in the unit, 4) install windows in-kind (u-factor 0.32 max) with wood til pack at the side & back not visible from the street, 5) replace water heater.Details
unit 1: 1) remodel kitchen (100sf), 2) remodel bathroom (60sf), 3) install subpanel in the unit, 4) install windows in-kind (u-factor 0.32 max) with wood til pack at the side & back not visible from the street, 5) replace water heater. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 1925 Laguna St | unit 3: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tilet pack and back not visible from street and u-factor 0-32max, 5) replace water heater.Details
unit 3: 1) remodel kitchen 100sf, 2) remodel bathroom 60sf, 3) install subpanel in unit, 4) install windows in-kind with wood tilet pack and back not visible from street and u-factor 0-32max, 5) replace water heater. | $30,000 |
| Dec 19, 2013 | Never finaled issued Jan 2014, no final | 212 Andover St | ground floor interior remodel. add new habitable space @ ground floor, new (1) bathroom, den, family room, approx 400 sq ft. structural upgrade @ground floor per plan. all work is in the ground floor only.Details
ground floor interior remodel. add new habitable space @ ground floor, new (1) bathroom, den, family room, approx 400 sq ft. structural upgrade @ground floor per plan. all work is in the ground floor only. | $35,000 |
| Sep 4, 2013 | Completed final sign-off Oct 2013 | 456 Funston Av | radiant heater for floor kitchen ; 2 kw; change cabinets in kitchen, install led lights, removed some outlets, install tub at hallway bathroom, install shower at master bed, install recess lights at dining living rm, hallway & bedroom, lighting per cec 150(k)Details
radiant heater for floor kitchen ; 2 kw; change cabinets in kitchen, install led lights, removed some outlets, install tub at hallway bathroom, install shower at master bed, install recess lights at dining living rm, hallway & bedroom, lighting per cec 150(k) | $12,000 |
| Sep 3, 2013 | Completed final sign-off May 2014 | 488 Fell St | t.i. for candy store. add handicap bathroom, rearrange store layout. install water heater, hvac.Details
t.i. for candy store. add handicap bathroom, rearrange store layout. install water heater, hvac. | $60,000 |
| Jun 10, 2013 | Completed final sign-off Aug 2013 | 199 Bocana St | legalize existing half bath powder room at the lower level (garage), ground level repair rot of post and beamDetails
legalize existing half bath powder room at the lower level (garage), ground level repair rot of post and beam | $1,500 |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 199 Bocana St | bathroom remodel change electrical panel (upgrade) lighting shall comply with title 24Details
bathroom remodel change electrical panel (upgrade) lighting shall comply with title 24 | $9,000 |
| Feb 20, 2013 | Never finaled issued Mar 2013, no final | 159 Panama St | to comply w/ nov#201281485, 201282272 & 201282264. remove illegal kitchen on gr fl, convert back to family room. add washer and dryer & legalize (e) bathroom & bedroom at the garage. remove illegal kitchen from 3rd fl and legalize wetbar. confirm total of 5 full bathsDetails
to comply w/ nov#201281485, 201282272 & 201282264. remove illegal kitchen on gr fl, convert back to family room. add washer and dryer & legalize (e) bathroom & bedroom at the garage. remove illegal kitchen from 3rd fl and legalize wetbar. confirm total of 5 full baths | $15,000 |
| Sep 11, 2012 | Completed final sign-off Oct 2013 | 1917 Ellis St | remodel 1 master bathroom, lighting to comply with cec 150 (k)Details
remodel 1 master bathroom, lighting to comply with cec 150 (k) | $15,000 |
| Jul 18, 2011 | Completed final sign-off Feb 2012 | 315 Guerrero St | repair bathroom walls ruin from water flooding; install gfci, circuit, breaker & fan light t-24 @ 317 + 319, replace + repair stack pipes, drainage from exterior as needed & toilet drainage, tub and vanity drainage, run conduit fro branch circuit apt 317 + 319.Details
repair bathroom walls ruin from water flooding; install gfci, circuit, breaker & fan light t-24 @ 317 + 319, replace + repair stack pipes, drainage from exterior as needed & toilet drainage, tub and vanity drainage, run conduit fro branch circuit apt 317 + 319. | $20,000 |