Block 3555, lot 033
315 Guerrero St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 5,004 sq ft
- Lot
- 3,567 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 15, 2017 | Completed final sign-off Dec 2020 | 315 Guerrero St | Trim Fit Constr. - O'reilly Engineering | compliance with mandatory seismic retofit program per 2016 sfebc chapter 4d & 2016 cebc appx a4.Details
compliance with mandatory seismic retofit program per 2016 sfebc chapter 4d & 2016 cebc appx a4. | $50,000 |
| Jan 4, 2012 | Completed final sign-off Jan 2012 | 315 Guerrero St | L H S Construction | remove portion of (e) vinyl siding to provide access for new stack pipe installation. remove approx 65 sq ft of plaster ceiling in 2 locations to provide access to replace waste lines for tub, toilet & vanity (2 access holes approx 16"x6' in size - replace in kind). enterior wood siding to remain.Details
remove portion of (e) vinyl siding to provide access for new stack pipe installation. remove approx 65 sq ft of plaster ceiling in 2 locations to provide access to replace waste lines for tub, toilet & vanity (2 access holes approx 16"x6' in size - replace in kind). enterior wood siding to remain. | $4,000 |
| Jul 18, 2011 | Completed final sign-off Feb 2012 | 315 Guerrero St | Randomity Construction | repair bathroom walls ruin from water flooding; install gfci, circuit, breaker & fan light t-24 @ 317 + 319, replace + repair stack pipes, drainage from exterior as needed & toilet drainage, tub and vanity drainage, run conduit fro branch circuit apt 317 + 319.Details
repair bathroom walls ruin from water flooding; install gfci, circuit, breaker & fan light t-24 @ 317 + 319, replace + repair stack pipes, drainage from exterior as needed & toilet drainage, tub and vanity drainage, run conduit fro branch circuit apt 317 + 319. | $20,000 |
| Dec 18, 2009 | Completed final sign-off Dec 2010 | 315 Guerrero St | Ahn House Corporation | reroofingDetails
reroofing | $14,000 |
| May 7, 2008 | Never finaled issued May 2008, no final | 315 Guerrero St | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.