Randomity Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2026
- Last 24 months
- 2 permits filed
47 permits since 2000: 30 completed, 2 in progress, 11 never finaled, 4 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 6 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2022 | Expired or cancelled expired Jul 2026 | 1709 Oak St | replacement of extg rear staircase to 2nd floor deckDetails
replacement of extg rear staircase to 2nd floor deck | $7,500 |
| Aug 22, 2018 | Completed final sign-off Aug 2018 | 416 Precita Av | to comply with nov #201866551. fix handrail on deckDetails
to comply with nov #201866551. fix handrail on deck | $1,000 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 632 London St | new deck per plan; concrete slab at backyard with proper drain; fence replacement max 6'4, repair or replace soil. retaining wall less than 3' on grade. catch basinDetails
new deck per plan; concrete slab at backyard with proper drain; fence replacement max 6'4, repair or replace soil. retaining wall less than 3' on grade. catch basin | $30,000 |