Back to kitchen remodel contractors
R M Construction
- Based in
- Sausalito
- On San Francisco permits
- Mar 2000 to Jul 2025
- Last 24 months
- 1 permit filed
64 permits since 2000: 44 completed, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 13 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2021 | Completed final sign-off Sep 2023 | 2525 19th St | new dwelling unit within density at 1st fl consisting of 1 bedroom, 1 bath, kitchen and living/dining room for a total of 544 sfDetails
new dwelling unit within density at 1st fl consisting of 1 bedroom, 1 bath, kitchen and living/dining room for a total of 544 sf | $15,000 |
| Nov 13, 2017 | Expired or cancelled expired May 2024 | 2524 19th St | legalize 1st flr enclosed 375 sq ft studio area, convert 1st flr unconditioned area to living space, move kitchen to 1st flr, add 1/2 bath & create mechanical rm on 1st flr, create (n) hall access from entry foyer to 1st flr living space, create master bed & bath on 2nd flr, remodel 2nd flr bath.Details
legalize 1st flr enclosed 375 sq ft studio area, convert 1st flr unconditioned area to living space, move kitchen to 1st flr, add 1/2 bath & create mechanical rm on 1st flr, create (n) hall access from entry foyer to 1st flr living space, create master bed & bath on 2nd flr, remodel 2nd flr bath. | $115,000 |
| Aug 31, 2015 | Completed final sign-off Sep 2016 | 254 States St | kitchen remodel: new cabinets, counter, dishwasher, tile kitchen floor, replace sink, faucet, move some counter plugs and add under cabinet lights.Details
kitchen remodel: new cabinets, counter, dishwasher, tile kitchen floor, replace sink, faucet, move some counter plugs and add under cabinet lights. | $10,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 1488 14th Av | remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit.Details
remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit. | $112,000 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 1045 Scott St | unit 3: partial kitchen remodel, replace cabinets, counters, tile, back splash, new dishwasher, stove. all in-kind. compliance with maher ordinance 155-13 not required.Details
unit 3: partial kitchen remodel, replace cabinets, counters, tile, back splash, new dishwasher, stove. all in-kind. compliance with maher ordinance 155-13 not required. | $11,000 |
| Dec 15, 2014 | Completed final sign-off Jan 2015 | 56 Morningside Dr | kitchen remodel, new cabinets, countertops and tile floor, sink upgrade, electric plugs to all rooms and lighting in kitchen in kindDetails
kitchen remodel, new cabinets, countertops and tile floor, sink upgrade, electric plugs to all rooms and lighting in kitchen in kind | $11,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 673 04th Av | remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing.Details
remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing. | $16,000 |
| Aug 19, 2013 | Completed final sign-off Jul 2014 | 692 Hamilton St | replace windows in front and back; add shower pan. remodel kitchen, bathroom; hardwood floors, replace (e) torch down roof; install water heater (on demand) and dumb waiter; paint inside; to comply with cec 150 (k) 8 & 10. u-factor not more than 0.32.Details
replace windows in front and back; add shower pan. remodel kitchen, bathroom; hardwood floors, replace (e) torch down roof; install water heater (on demand) and dumb waiter; paint inside; to comply with cec 150 (k) 8 & 10. u-factor not more than 0.32. | $45,000 |
| Aug 19, 2013 | Expired or cancelled cancelled Jan 2026 | 692 Hamilton St | remodel kitchen & bathroom (legalize), replace some windows, visible from the street. paint all inside. install hardwood floors, install green house in garden (seperate structure) & landscaping work, replace torch down roof, install on demand water heaterDetails
remodel kitchen & bathroom (legalize), replace some windows, visible from the street. paint all inside. install hardwood floors, install green house in garden (seperate structure) & landscaping work, replace torch down roof, install on demand water heater | $45,000 |
| Jul 2, 2013 | Completed final sign-off May 2014 | 235 Valdez Av | interior remodel of (e) single family residence: remodel to (e) kitchen & structural foundation upgrade to one (e) post in basement. remove 1 (e) window, not visible from street; install beam & posts at kitchen bearing wall removal & continue posts to new footings.Details
interior remodel of (e) single family residence: remodel to (e) kitchen & structural foundation upgrade to one (e) post in basement. remove 1 (e) window, not visible from street; install beam & posts at kitchen bearing wall removal & continue posts to new footings. | $22,000 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 85 Cresta Vista Dr | move kitchen from front to rear of house new cabinets, counters, remove walls between extg kitchen and hall and rear office/bedroom, close door and build closet in extg living room/bedroom, replace patio door at rear of house, electrical and plmg to tie in to extg and build shear wall in basementDetails
move kitchen from front to rear of house new cabinets, counters, remove walls between extg kitchen and hall and rear office/bedroom, close door and build closet in extg living room/bedroom, replace patio door at rear of house, electrical and plmg to tie in to extg and build shear wall in basement | $45,000 |
| May 4, 2011 | Completed final sign-off Sep 2012 | 829 North Point St | remodel 829/831 north point st, remove and replace kitchen, bath and laundry in each unit, replace plumbing throughout, install on demand water heater in each unit, all new electric throughout and new upgraded service, replace forced air furnaces with 2 new heaters and ducting. add 1/2 bath (toiletDetails
remodel 829/831 north point st, remove and replace kitchen, bath and laundry in each unit, replace plumbing throughout, install on demand water heater in each unit, all new electric throughout and new upgraded service, replace forced air furnaces with 2 new heaters and ducting. add 1/2 bath (toilet | $175,000 |
| Jun 12, 2009 | Completed final sign-off Nov 2011 | 1562 Church St | install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint throughoDetails
install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint througho | $20,000 |
| Jul 24, 2008 | Completed final sign-off Oct 2008 | 40 Cumberland St | replace kitchen cabinets and countertop with new electrical and some plumbing and bathroom fixtures light, toilet, vanity sink.Details
replace kitchen cabinets and countertop with new electrical and some plumbing and bathroom fixtures light, toilet, vanity sink. | $10,000 |
| Dec 10, 2007 | Completed final sign-off Sep 2008 | 1020 Union St | kitchen and bath remodel. replace carbinet, counter tops, lighting, floor tiles and new fixtures in bathroom. replace bathroom windows in kind and re-frame closet walls. all work to be in unit # 28 onlyDetails
kitchen and bath remodel. replace carbinet, counter tops, lighting, floor tiles and new fixtures in bathroom. replace bathroom windows in kind and re-frame closet walls. all work to be in unit # 28 only | $27,000 |
| Aug 23, 2001 | Completed final sign-off Feb 2002 | 2904 California St | remove old kitchen and install new kitchen cabinets and countertopDetails
remove old kitchen and install new kitchen cabinets and countertop | $3,000 |
| Mar 31, 2000 | Expired or cancelled expired Oct 2000 | 2904 California St | plumbing work in kitchen and bathroom, kitchen cabinets in 3 unitsDetails
plumbing work in kitchen and bathroom, kitchen cabinets in 3 units |