Block 6601, lot 003
1564 Church St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 2,608 sq ft
- Lot
- 2,840 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 26, 2022 | Completed final sign-off Jun 2023 | 1564 Church St | Electra Plumbing & Const | revision to permit 202206247017 structural adjustment to exposed hidden conditions. stiffen (e) 3rd fl joists. substitute proposed wood rafters with steel at dormer.Details
revision to permit 202206247017 structural adjustment to exposed hidden conditions. stiffen (e) 3rd fl joists. substitute proposed wood rafters with steel at dormer. | |
| Jun 24, 2022 | Completed final sign-off Jun 2023 | 1564 Church St | Electra Plumbing & Const | remodel 3rd fl to create additional bedroom. add dormer window. replace window in (e) dormer. remove forced air heating & all ducts. install new mini split hvac system. enlarge (e) domerDetails
remodel 3rd fl to create additional bedroom. add dormer window. replace window in (e) dormer. remove forced air heating & all ducts. install new mini split hvac system. enlarge (e) domer | $20,000 |
| Dec 29, 2020 | Completed final sign-off Aug 2021 | 1564 Church St | Electra Plumbing & Const | repair approx 25% of exterior front stairs and handrail.Details
repair approx 25% of exterior front stairs and handrail. | $6,000 |
| Jan 24, 2018 | Completed final sign-off Jan 2018 | 1562 Church St | Bayside Remodeling & Construction | remove some stairs and sid rail from dryrot. small single staircase in rear yard. replace 45 percent or lessDetails
remove some stairs and sid rail from dryrot. small single staircase in rear yard. replace 45 percent or less | $4,000 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 1562 Church St | Bayside Remodeling & Construction | removing siding on rear of building. replace with same wood sidingDetails
removing siding on rear of building. replace with same wood siding | $72,000 |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 1564 Church St | S V Builders | new cabinets, rearragne laundry room, remodel bath, 3 windows - like for like. one new window at top floor rear within new 8' x 8' dormer.Details
new cabinets, rearragne laundry room, remodel bath, 3 windows - like for like. one new window at top floor rear within new 8' x 8' dormer. | $30,000 |
| Jul 3, 2014 | Completed final sign-off Oct 2014 | 1562 Church St | complete basement retrofit. work in garage only. replace extg curb mount with flat 2x2 skylight(same size as original).Details
complete basement retrofit. work in garage only. replace extg curb mount with flat 2x2 skylight(same size as original). | $8,500 | |
| Dec 28, 2011 | Completed final sign-off Dec 2011 | 1564 Church St | use change of room from study to bedroom on 2nd floor level in rear of building.Details
use change of room from study to bedroom on 2nd floor level in rear of building. | ||
| Oct 12, 2010 | Completed final sign-off Nov 2011 | 1562 Church St | lower unit: add full bath, upper unit: remodel exist bath, upgrade 1/2 bath to full bath @ loft. relocate kitchen. add washer dryer add central heat. legalize exist loft (2) bedrooms.Details
lower unit: add full bath, upper unit: remodel exist bath, upgrade 1/2 bath to full bath @ loft. relocate kitchen. add washer dryer add central heat. legalize exist loft (2) bedrooms. | $40,000 | |
| Jun 12, 2009 | Completed final sign-off Nov 2011 | 1562 Church St | R M Construction | install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint throughoDetails
install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint througho | $20,000 |
| Feb 19, 2008 | Never finaled issued Feb 2008, no final | 1562 Church St | to renew pa# 2006/11/28/8606 to continue work.Details
to renew pa# 2006/11/28/8606 to continue work. | $15,000 | |
| Nov 28, 2006 | Never finaled issued Nov 2006, no final | 1562 Church St | internal remodeling of converting the g/f playroom with 1/2 bath into a smaller playroom with full bath and a storage room & connecting with 2nd story unit with a new stairs. at 2nd floor, remodel kitchen with new cabinets, appliance and fixtures, remodel bathroom to have tub & shower.Details
internal remodeling of converting the g/f playroom with 1/2 bath into a smaller playroom with full bath and a storage room & connecting with 2nd story unit with a new stairs. at 2nd floor, remodel kitchen with new cabinets, appliance and fixtures, remodel bathroom to have tub & shower. | $30,000 |