Back to bathroom remodel contractors
R M Construction
- Based in
- Sausalito
- On San Francisco permits
- Mar 2000 to Jul 2025
- Last 24 months
- 1 permit filed
64 permits since 2000: 44 completed, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 17 completed, 1 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2022 | Expired or cancelled expired May 2024 | 4033 Lincoln Wy | convert (e) storage into 2 bedrooms, office & bathroom at 1st fl. add exterior stair from 2nd fl to rear yard.Details
convert (e) storage into 2 bedrooms, office & bathroom at 1st fl. add exterior stair from 2nd fl to rear yard. | $40,000 |
| Jul 22, 2021 | Completed final sign-off Sep 2023 | 2525 19th St | new dwelling unit within density at 1st fl consisting of 1 bedroom, 1 bath, kitchen and living/dining room for a total of 544 sfDetails
new dwelling unit within density at 1st fl consisting of 1 bedroom, 1 bath, kitchen and living/dining room for a total of 544 sf | $15,000 |
| Nov 13, 2017 | Expired or cancelled expired May 2024 | 2524 19th St | legalize 1st flr enclosed 375 sq ft studio area, convert 1st flr unconditioned area to living space, move kitchen to 1st flr, add 1/2 bath & create mechanical rm on 1st flr, create (n) hall access from entry foyer to 1st flr living space, create master bed & bath on 2nd flr, remodel 2nd flr bath.Details
legalize 1st flr enclosed 375 sq ft studio area, convert 1st flr unconditioned area to living space, move kitchen to 1st flr, add 1/2 bath & create mechanical rm on 1st flr, create (n) hall access from entry foyer to 1st flr living space, create master bed & bath on 2nd flr, remodel 2nd flr bath. | $115,000 |
| Mar 8, 2016 | Completed final sign-off Apr 2016 | 36 Cumberland St | to remodel bathroom. change all fixtures out, in kind, faucets, toilet, medicine cabinet, bathtub, tiles and light fixtures. change out in in kind. gas wall heater.Details
to remodel bathroom. change all fixtures out, in kind, faucets, toilet, medicine cabinet, bathtub, tiles and light fixtures. change out in in kind. gas wall heater. | $7,000 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 2621 30th Av | new study, bath and laundry added to unfinished ground floor. new stairs, new glass doors, and windows added to the rear of bldg at 1st floor. new rear deck. no change to front facade. no change to floor area.Details
new study, bath and laundry added to unfinished ground floor. new stairs, new glass doors, and windows added to the rear of bldg at 1st floor. new rear deck. no change to front facade. no change to floor area. | $120,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 1488 14th Av | remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit.Details
remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit. | $112,000 |
| May 15, 2015 | Completed final sign-off Jun 2015 | 1045 Scott St | unit 2: partial remodel of (e) bathroom, replace shower pan, tiles, vanity cabinet, medicine cabinet, extractor fan, all in-kind. compliance with maher ordinance no 155-13 not required.Details
unit 2: partial remodel of (e) bathroom, replace shower pan, tiles, vanity cabinet, medicine cabinet, extractor fan, all in-kind. compliance with maher ordinance no 155-13 not required. | $5,000 |
| Jun 5, 2014 | Completed final sign-off Aug 2014 | 1045 Scott St | unit #3 - remodel existing bathroom in kind, tile, install cabinets, all new bath fixtures & paint. n/a maher ordinance 155-13Details
unit #3 - remodel existing bathroom in kind, tile, install cabinets, all new bath fixtures & paint. n/a maher ordinance 155-13 | $9,000 |
| Jun 5, 2014 | Completed final sign-off Jul 2014 | 1045 Scott St | unit #1 - install a half bath to the first floor under the stairway. install new toilet, sink, vanity cabinet, lights and ceiling fan. maher ordinance n/a.Details
unit #1 - install a half bath to the first floor under the stairway. install new toilet, sink, vanity cabinet, lights and ceiling fan. maher ordinance n/a. | $3,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 673 04th Av | remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing.Details
remodel extg kitchen: replace cabinets, stove, refridge, hood, sink.partial wall removal between kitchen and dining room. moving washer and dryer. drywall patching and painting. bathroom vanity sink sink replacement/installing fan & heated floors. new electrical & plumbing. | $16,000 |
| Aug 19, 2013 | Completed final sign-off Jul 2014 | 692 Hamilton St | replace windows in front and back; add shower pan. remodel kitchen, bathroom; hardwood floors, replace (e) torch down roof; install water heater (on demand) and dumb waiter; paint inside; to comply with cec 150 (k) 8 & 10. u-factor not more than 0.32.Details
replace windows in front and back; add shower pan. remodel kitchen, bathroom; hardwood floors, replace (e) torch down roof; install water heater (on demand) and dumb waiter; paint inside; to comply with cec 150 (k) 8 & 10. u-factor not more than 0.32. | $45,000 |
| Aug 19, 2013 | Expired or cancelled cancelled Jan 2026 | 692 Hamilton St | remodel kitchen & bathroom (legalize), replace some windows, visible from the street. paint all inside. install hardwood floors, install green house in garden (seperate structure) & landscaping work, replace torch down roof, install on demand water heaterDetails
remodel kitchen & bathroom (legalize), replace some windows, visible from the street. paint all inside. install hardwood floors, install green house in garden (seperate structure) & landscaping work, replace torch down roof, install on demand water heater | $45,000 |
| Mar 6, 2013 | Completed final sign-off Mar 2015 | 247 Noe St | add full bathroom in existing space, shower, double vanity sinks, wall hung toilet ceiling fan heat combo, add lighting, tower bars, electrical and plumbing in stall door, and lower ceiling. no windows on this permit.Details
add full bathroom in existing space, shower, double vanity sinks, wall hung toilet ceiling fan heat combo, add lighting, tower bars, electrical and plumbing in stall door, and lower ceiling. no windows on this permit. | $20,000 |
| May 4, 2011 | Completed final sign-off Sep 2012 | 829 North Point St | remodel 829/831 north point st, remove and replace kitchen, bath and laundry in each unit, replace plumbing throughout, install on demand water heater in each unit, all new electric throughout and new upgraded service, replace forced air furnaces with 2 new heaters and ducting. add 1/2 bath (toiletDetails
remodel 829/831 north point st, remove and replace kitchen, bath and laundry in each unit, replace plumbing throughout, install on demand water heater in each unit, all new electric throughout and new upgraded service, replace forced air furnaces with 2 new heaters and ducting. add 1/2 bath (toilet | $175,000 |
| Jun 12, 2009 | Completed final sign-off Nov 2011 | 1562 Church St | install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint throughoDetails
install new kitchen cabinets, counter and appliciances, remodel bathroom with new tiles and fixtures, install lighting for kitchen and bathroom and fan as needed, install hardwood floor throughout and tile in mud room, upgrade plumbing in laudry room, replace any damaged sheetrock and paint througho | $20,000 |
| Jun 12, 2009 | Completed final sign-off Dec 2009 | 140 Paraiso Pl | remodel (e) bath room, replace all tiles, fixtgures and shower. add some lighting and install/replace door to bedroom. install/replace in kind two windows at side of house. install trim and paint for living rm and dining rm. lighting to conform to tile 24 lighting mandatory measure.Details
remodel (e) bath room, replace all tiles, fixtgures and shower. add some lighting and install/replace door to bedroom. install/replace in kind two windows at side of house. install trim and paint for living rm and dining rm. lighting to conform to tile 24 lighting mandatory measure. | $15,000 |
| Jul 24, 2008 | Completed final sign-off Oct 2008 | 40 Cumberland St | replace kitchen cabinets and countertop with new electrical and some plumbing and bathroom fixtures light, toilet, vanity sink.Details
replace kitchen cabinets and countertop with new electrical and some plumbing and bathroom fixtures light, toilet, vanity sink. | $10,000 |
| Dec 10, 2007 | Completed final sign-off Sep 2008 | 1020 Union St | kitchen and bath remodel. replace carbinet, counter tops, lighting, floor tiles and new fixtures in bathroom. replace bathroom windows in kind and re-frame closet walls. all work to be in unit # 28 onlyDetails
kitchen and bath remodel. replace carbinet, counter tops, lighting, floor tiles and new fixtures in bathroom. replace bathroom windows in kind and re-frame closet walls. all work to be in unit # 28 only | $27,000 |
| Apr 19, 2006 | Completed final sign-off Aug 2006 | 34 Cumberland St | 41 bathroom remodel. replace (e) fixtures, replace sheetrock + tiles.Details
41 bathroom remodel. replace (e) fixtures, replace sheetrock + tiles. | $3,000 |
| Mar 10, 2006 | Completed final sign-off Aug 2006 | 716 Arguello Bl | renew 200409013143 and 200509082305 and revision. alteration to lower unit bathroom, change layout, modify stair support wallDetails
renew 200409013143 and 200509082305 and revision. alteration to lower unit bathroom, change layout, modify stair support wall | $8,000 |
| Oct 31, 2001 | Completed final sign-off Jan 2002 | 79 Bemis St | remodel existing bath,tub, toilet, and tileDetails
remodel existing bath,tub, toilet, and tile | $4,000 |
| Mar 31, 2000 | Expired or cancelled expired Oct 2000 | 2904 California St | plumbing work in kitchen and bathroom, kitchen cabinets in 3 unitsDetails
plumbing work in kitchen and bathroom, kitchen cabinets in 3 units |