Back to kitchen remodel contractors
R M Builders
- Based in
- Pacifica
- On San Francisco permits
- Mar 2008 to Jul 2022
- Last 24 months
- 0 permits filed
73 permits since 2000: 62 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 16 completed, 1 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2021 | Completed final sign-off Feb 2022 | 3356 Jackson St | replace cabinets and some appliances. kitchen layout change. no removal of wallsDetails
replace cabinets and some appliances. kitchen layout change. no removal of walls | $58,200 |
| Oct 21, 2020 | Completed final sign-off May 2021 | 296 Cresta Vista Dr | replace cabinets and appliances of kitchen. no change in layout.Details
replace cabinets and appliances of kitchen. no change in layout. | $21,500 |
| Mar 20, 2019 | Completed final sign-off May 2019 | 125 Marview Wy | replace existing kitchen cabinets in the kitchen. do some electrical and some plumbing.Details
replace existing kitchen cabinets in the kitchen. do some electrical and some plumbing. | $10,000 |
| May 30, 2018 | Completed final sign-off Nov 2018 | 1990 Green St | apt 102: kitchen remodel, approx 120 sq ft. like for like.Details
apt 102: kitchen remodel, approx 120 sq ft. like for like. | $12,000 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 3673 19th St | unit b: to comply with nov#201635151: 1) remove kitchen cab and replace for new, 2)remove bathroom vanity and replace for new. 3) fix some dryrot around back door, 4) patch some drywall that was removed from different part.Details
unit b: to comply with nov#201635151: 1) remove kitchen cab and replace for new, 2)remove bathroom vanity and replace for new. 3) fix some dryrot around back door, 4) patch some drywall that was removed from different part. | $5,000 |
| Sep 8, 2016 | Never finaled issued Sep 2016, no final | 3676 19th St | remove kitchen cabinets and install new ones. remove bathroom vanity and install new ones. no sheetrock removedDetails
remove kitchen cabinets and install new ones. remove bathroom vanity and install new ones. no sheetrock removed | $5,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 54 Allen St | remodel of a kitchen, one - non structual.Details
remodel of a kitchen, one - non structual. | $14,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 130 Varennes St | remodel of a kitchen, one - non structual.Details
remodel of a kitchen, one - non structual. | $6,000 |
| Apr 22, 2013 | Completed final sign-off Aug 2013 | 575 Hearst Av | kitchen remodel replace cabinets, replace 2 windows at side of the kitchen. not visible from street. replacing sliding door instead of swing door.Details
kitchen remodel replace cabinets, replace 2 windows at side of the kitchen. not visible from street. replacing sliding door instead of swing door. | $29,459 |
| Oct 25, 2012 | Completed final sign-off Dec 2013 | 2846 Baker St | remodel kitchen, reconfigure lower level and enclose space under overhang. remodel 1 bath, add 1.5 baths. add new interior staircase, remove wood burning fireplace and add ethanol fireplace. update plumbing, elec, mech systems. install high efficiancy windows and insulate all exterior wallsDetails
remodel kitchen, reconfigure lower level and enclose space under overhang. remodel 1 bath, add 1.5 baths. add new interior staircase, remove wood burning fireplace and add ethanol fireplace. update plumbing, elec, mech systems. install high efficiancy windows and insulate all exterior walls | $150,000 |
| Apr 2, 2012 | Completed final sign-off Jun 2012 | 1606 09th Av | revision to permit #201203196289 to add frame wall recess in non-bearing partition for installation of cabinet approximately 3'-7" wide x 7'-10" high between kitchen & dining rm. replace 2-kitchen windows(not visible from street).Details
revision to permit #201203196289 to add frame wall recess in non-bearing partition for installation of cabinet approximately 3'-7" wide x 7'-10" high between kitchen & dining rm. replace 2-kitchen windows(not visible from street). | $600 |
| Mar 19, 2012 | Completed final sign-off Jun 2012 | 1606 09th Av | kitchen cabinets remodel, redo electrical to add outlets, gas to be relocated, no change on walls and openingsDetails
kitchen cabinets remodel, redo electrical to add outlets, gas to be relocated, no change on walls and openings | $9,500 |
| Mar 30, 2011 | Completed final sign-off Jul 2012 | 2829 Greenwich St | site permit. remodel of 2 units. addition @ rear & sides on 3 levels. remodel 2 kitchens, remodel / reconfigure 4 baths. new insulated windows & doors, new lighting, throughout, new roof terrace & balcony @ rear, reconfigure front facade.Details
site permit. remodel of 2 units. addition @ rear & sides on 3 levels. remodel 2 kitchens, remodel / reconfigure 4 baths. new insulated windows & doors, new lighting, throughout, new roof terrace & balcony @ rear, reconfigure front facade. | $350,000 |
| Jun 21, 2010 | Completed final sign-off Jun 2010 | 2921 Jackson St | second floor bath & kitchen remodel. 3rd fl bath & kitchen remodel. see attached correction notice. increase valuation of job.Details
second floor bath & kitchen remodel. 3rd fl bath & kitchen remodel. see attached correction notice. increase valuation of job. | $61,000 |
| Apr 29, 2010 | Completed final sign-off Jun 2010 | 2921 Jackson St | 2nd floor bath: remove tile and replace. kitchen: replace cabinets to new and reinstall same appliances. 3rd floor bath. replace tile on floor and bath tub. cosmetics. no plumbing is relocated.. provide high efficacy lights per cecDetails
2nd floor bath: remove tile and replace. kitchen: replace cabinets to new and reinstall same appliances. 3rd floor bath. replace tile on floor and bath tub. cosmetics. no plumbing is relocated.. provide high efficacy lights per cec | $19,000 |
| Aug 10, 2009 | Completed final sign-off May 2010 | 3481 Washington St | revision to 2008/1118/6843; replace w10x33 to w14x61 at kitchen.Details
revision to 2008/1118/6843; replace w10x33 to w14x61 at kitchen. | $4,000 |
| Jun 10, 2008 | Completed final sign-off Jul 2009 | 470 Vallejo St | remodel kitchen and 3 baths. add 2 baths.reconfigure partitions to excavate rear portion of garage and add new retaining wall/footing. add elevator at e side lightwell with new footing below (3 stop) replace windows throughtout, modify size at top level front elevation. extend e roof deck/gaurdrl,Details
remodel kitchen and 3 baths. add 2 baths.reconfigure partitions to excavate rear portion of garage and add new retaining wall/footing. add elevator at e side lightwell with new footing below (3 stop) replace windows throughtout, modify size at top level front elevation. extend e roof deck/gaurdrl, | $150,000 |