Back to bathroom remodel contractors
R M Builders
- Based in
- Pacifica
- On San Francisco permits
- Mar 2008 to Jul 2022
- Last 24 months
- 0 permits filed
73 permits since 2000: 62 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 16 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2017 | Completed final sign-off Mar 2017 | 9 Bernice St | 1. remodel one full bathroom, remove tile and fixtures and install new tile and new fixtures. 2. replace toilet and sink in powder room. maher naDetails
1. remodel one full bathroom, remove tile and fixtures and install new tile and new fixtures. 2. replace toilet and sink in powder room. maher na | $18,000 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 3673 19th St | unit b: to comply with nov#201635151: 1) remove kitchen cab and replace for new, 2)remove bathroom vanity and replace for new. 3) fix some dryrot around back door, 4) patch some drywall that was removed from different part.Details
unit b: to comply with nov#201635151: 1) remove kitchen cab and replace for new, 2)remove bathroom vanity and replace for new. 3) fix some dryrot around back door, 4) patch some drywall that was removed from different part. | $5,000 |
| Sep 8, 2016 | Never finaled issued Sep 2016, no final | 3676 19th St | remove kitchen cabinets and install new ones. remove bathroom vanity and install new ones. no sheetrock removedDetails
remove kitchen cabinets and install new ones. remove bathroom vanity and install new ones. no sheetrock removed | $5,000 |
| Jul 2, 2014 | Completed final sign-off Aug 2014 | 2131 Bay St | remodel of one bathroom non structuralDetails
remodel of one bathroom non structural | $6,000 |
| Mar 5, 2014 | Expired or cancelled cancelled Jan 2026 | 130 Varennes St | remodel of a bathroom, (one) non structural.Details
remodel of a bathroom, (one) non structural. | |
| Oct 25, 2012 | Completed final sign-off Dec 2013 | 2846 Baker St | remodel kitchen, reconfigure lower level and enclose space under overhang. remodel 1 bath, add 1.5 baths. add new interior staircase, remove wood burning fireplace and add ethanol fireplace. update plumbing, elec, mech systems. install high efficiancy windows and insulate all exterior wallsDetails
remodel kitchen, reconfigure lower level and enclose space under overhang. remodel 1 bath, add 1.5 baths. add new interior staircase, remove wood burning fireplace and add ethanol fireplace. update plumbing, elec, mech systems. install high efficiancy windows and insulate all exterior walls | $150,000 |
| Jun 1, 2011 | Completed final sign-off Sep 2011 | 2424 Jones St | remodel of bathroom in the penthouseDetails
remodel of bathroom in the penthouse | $25,000 |
| Apr 22, 2011 | Completed final sign-off Sep 2011 | 2424 Jones St | demolition of bathroom, just sheet rock, mostly for sploting. open exploration holes to check for framing details - holes to be patched after exploratory work.Details
demolition of bathroom, just sheet rock, mostly for sploting. open exploration holes to check for framing details - holes to be patched after exploratory work. | $800 |
| Mar 30, 2011 | Completed final sign-off Jul 2012 | 2829 Greenwich St | site permit. remodel of 2 units. addition @ rear & sides on 3 levels. remodel 2 kitchens, remodel / reconfigure 4 baths. new insulated windows & doors, new lighting, throughout, new roof terrace & balcony @ rear, reconfigure front facade.Details
site permit. remodel of 2 units. addition @ rear & sides on 3 levels. remodel 2 kitchens, remodel / reconfigure 4 baths. new insulated windows & doors, new lighting, throughout, new roof terrace & balcony @ rear, reconfigure front facade. | $350,000 |
| Mar 1, 2011 | Completed final sign-off Apr 2011 | 355 Bryant St | replace in kind bath remodel(new fixtures and finishes and new tempered glass partitions). new closet partition.Details
replace in kind bath remodel(new fixtures and finishes and new tempered glass partitions). new closet partition. | $20,000 |
| Jun 21, 2010 | Completed final sign-off Jun 2010 | 2921 Jackson St | second floor bath & kitchen remodel. 3rd fl bath & kitchen remodel. see attached correction notice. increase valuation of job.Details
second floor bath & kitchen remodel. 3rd fl bath & kitchen remodel. see attached correction notice. increase valuation of job. | $61,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 1919 Vallejo St | m. bath @ 2nd. level: remove tub, expand shower, replace wall hung sinks w/ vanity. hall bath @ 2nd. level: replace shower w/tub, replace wall hung sink w/ vanity & replace scone light per california energy codes, outlet are already gfci.Details
m. bath @ 2nd. level: remove tub, expand shower, replace wall hung sinks w/ vanity. hall bath @ 2nd. level: replace shower w/tub, replace wall hung sink w/ vanity & replace scone light per california energy codes, outlet are already gfci. | $20,000 |
| Apr 29, 2010 | Completed final sign-off Jun 2010 | 2921 Jackson St | 2nd floor bath: remove tile and replace. kitchen: replace cabinets to new and reinstall same appliances. 3rd floor bath. replace tile on floor and bath tub. cosmetics. no plumbing is relocated.. provide high efficacy lights per cecDetails
2nd floor bath: remove tile and replace. kitchen: replace cabinets to new and reinstall same appliances. 3rd floor bath. replace tile on floor and bath tub. cosmetics. no plumbing is relocated.. provide high efficacy lights per cec | $19,000 |
| Mar 25, 2010 | Completed final sign-off Jun 2010 | 2921 Jackson St | replace brick foundatn @garage, reconfigure partition walls & doors @3rd fl, new full bath @3rd fl @(e) nursery location, new washer/dryer at (e) toilet closet in hallway on 3rd fl, new closet at ma. bedrm/dressing area, new lighting & outlets @ bedroom dressing/bath & laundry closet.voluntary int pDetails
replace brick foundatn @garage, reconfigure partition walls & doors @3rd fl, new full bath @3rd fl @(e) nursery location, new washer/dryer at (e) toilet closet in hallway on 3rd fl, new closet at ma. bedrm/dressing area, new lighting & outlets @ bedroom dressing/bath & laundry closet.voluntary int p | $50,000 |
| Oct 22, 2009 | Completed final sign-off May 2010 | 3481 Washington St | revision to application 20006291582 & 200810164364. revision includes interior remodel of basement including wine room, interior remodel at 2nd fl. remodel bathroom, remove (1) bedroom, replace existing door with new window.Details
revision to application 20006291582 & 200810164364. revision includes interior remodel of basement including wine room, interior remodel at 2nd fl. remodel bathroom, remove (1) bedroom, replace existing door with new window. | $5,000 |
| Oct 7, 2009 | Completed final sign-off Apr 2011 | 3362 Jackson St | seismic upgrade, new slab grade, infill @ west side lot line 2 lower lvls.int. remodel @ all lvls/new powder and wet bar at lower lvl. new elev.(4 sty),relocate pwdr,kitch,stairs @ 2nd, remodel 2 baths and add 1 bath @ 3rd lvl. reconfig. stairto 4th lv. relocate bath @ 4th & add powder/reconfigureDetails
seismic upgrade, new slab grade, infill @ west side lot line 2 lower lvls.int. remodel @ all lvls/new powder and wet bar at lower lvl. new elev.(4 sty),relocate pwdr,kitch,stairs @ 2nd, remodel 2 baths and add 1 bath @ 3rd lvl. reconfig. stairto 4th lv. relocate bath @ 4th & add powder/reconfigure | $300,000 |
| Jun 10, 2008 | Completed final sign-off Jul 2009 | 470 Vallejo St | remodel kitchen and 3 baths. add 2 baths.reconfigure partitions to excavate rear portion of garage and add new retaining wall/footing. add elevator at e side lightwell with new footing below (3 stop) replace windows throughtout, modify size at top level front elevation. extend e roof deck/gaurdrl,Details
remodel kitchen and 3 baths. add 2 baths.reconfigure partitions to excavate rear portion of garage and add new retaining wall/footing. add elevator at e side lightwell with new footing below (3 stop) replace windows throughtout, modify size at top level front elevation. extend e roof deck/gaurdrl, | $150,000 |
| Mar 26, 2008 | Completed final sign-off Sep 2008 | 63 Fernwood Dr | upgrade one bathroom with new tile new sink bathtub and shower. the sink is going to be moved to the opposite side of the bathroom. new lights, paint and cosmetics.Details
upgrade one bathroom with new tile new sink bathtub and shower. the sink is going to be moved to the opposite side of the bathroom. new lights, paint and cosmetics. | $6,500 |