R M Builders
- Based in
- Pacifica
- On San Francisco permits
- Mar 2008 to Jul 2022
- Last 24 months
- 0 permits filed
73 permits since 2000: 62 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2014 | Completed final sign-off Jul 2014 | 1959 California St | (r) dry rot on (e) deck, real deck, lower back, less than 50% repair. repair-in-kind.Details
(r) dry rot on (e) deck, real deck, lower back, less than 50% repair. repair-in-kind. | $4,000 |
| Apr 30, 2014 | Completed final sign-off Jul 2014 | 345 Collingwood St | repair damage wood due to weather on small deck right on top of the garage and replace door in kind, due to dry rot; repair work only 50% or less, no full replacementDetails
repair damage wood due to weather on small deck right on top of the garage and replace door in kind, due to dry rot; repair work only 50% or less, no full replacement | $4,800 |
| Oct 8, 2013 | Completed final sign-off Jan 2014 | 2846 Baker St | replace rear deckDetails
replace rear deck | $10,000 |
| Jul 25, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005).Details
revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005). | $250,000 |
| Aug 18, 2010 | Completed final sign-off Sep 2010 | 2921 Jackson St | remove & replace siding in the lower part of the back house & repair the deck on the back of the house less than 50%.Details
remove & replace siding in the lower part of the back house & repair the deck on the back of the house less than 50%. | $7,200 |
| Aug 5, 2009 | Completed final sign-off Mar 2011 | 3362 Jackson St | exploratory and light demo 50% plaster removal deck demoDetails
exploratory and light demo 50% plaster removal deck demo | $5,000 |