R C Construction
- Based in
- West Sacramento
- On San Francisco permits
- Sep 2012 to Dec 2025
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 2 never finaled. Typically 24 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2024 | Completed final sign-off Feb 2026 | 593 Banks St | retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac.Details
retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac. | $200,000 |
| Aug 2, 2023 | Completed final sign-off Nov 2023 | 2858 22nd St | dry rot repair on 2nd floor porch @ rear - less than 50%. (n) ledger board, floor, and stair treads. not visible from street.Details
dry rot repair on 2nd floor porch @ rear - less than 50%. (n) ledger board, floor, and stair treads. not visible from street. | $5,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 277 32nd Av | revision to 201712156590 change to front stair layout, move back 4 ftDetails
revision to 201712156590 change to front stair layout, move back 4 ft | |
| Dec 15, 2017 | Never finaled issued Feb 2018, no final | 277 32nd Av | kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs.Details
kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs. | $125,000 |