R C Construction
- Based in
- West Sacramento
- On San Francisco permits
- Sep 2012 to Dec 2025
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 never finaled. Typically 4 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2015 | Completed final sign-off Aug 2016 | 32 Terra Vista Av | unti #2 - new redwood roof deck 220 sf. no added square footage.Details
unti #2 - new redwood roof deck 220 sf. no added square footage. | $4,600 |
| Nov 16, 2015 | Completed final sign-off Mar 2017 | 32 Terra Vista Av | unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft.Details
unti #3 - new redwood roof deck, 220 sf. replace existing with new. no added sq. ft. | $4,800 |
| Jul 9, 2015 | Never finaled issued Aug 2015, no final | 32 Terra Vista Av | rev. to 201504294958 -adding plans for roof decks for top unit.Details
rev. to 201504294958 -adding plans for roof decks for top unit. | $20,000 |
| Apr 29, 2015 | Completed final sign-off Jun 2015 | 32 Terra Vista Av | unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like.Details
unit #1 - move washer/dryer to first floor from garage into a closet in hallway / new countertop in kitchen. replace 7 wood sash at front with new wood sash within existing openings. replace dryrot (2) roof deck with like. | $20,000 |