Back to bathroom remodel contractors
R C Construction
- Based in
- West Sacramento
- On San Francisco permits
- Sep 2012 to Dec 2025
- Last 24 months
- 4 permits filed
25 permits since 2000: 14 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 2 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 26 days from filing to permit and 462 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | In progress issued Dec 2025 | 236 Laussat St | unit #236: bathroom remodel in kind. no changes to walls or openings. (n) tub/shower, vanity, toilet. all (n) light switches. upgrade main panel to 400amp.Details
unit #236: bathroom remodel in kind. no changes to walls or openings. (n) tub/shower, vanity, toilet. all (n) light switches. upgrade main panel to 400amp. | $29,000 |
| Jun 5, 2025 | In progress issued Jul 2025 | 83 Fair Oaks St | remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings.Details
remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings. | $120,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2026 | 593 Banks St | retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac.Details
retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac. | $200,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room.Details
interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room. | $160,000 |
| May 31, 2018 | Never finaled issued Jun 2018, no final | 277 32nd Av | revision to pa # 201712156590. add a master bath downstairs and upgrade foundation in back of house.Details
revision to pa # 201712156590. add a master bath downstairs and upgrade foundation in back of house. | $25,000 |
| Dec 15, 2017 | Never finaled issued Feb 2018, no final | 277 32nd Av | kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs.Details
kitchen & bath remodel, open dining room to hall all on upper floor. bedroom and bath remodel on lower floor. replace exterior rear yard stairs. | $125,000 |
| Dec 14, 2015 | Expired or cancelled expired Jun 2018 | 32 Terra Vista Av | unit #2: move kitchen to dinning room open consept. remodel bathroom as is. turn old kitchen into bedroom. move window in the bedroom and reframe wall add closet.Details
unit #2: move kitchen to dinning room open consept. remodel bathroom as is. turn old kitchen into bedroom. move window in the bedroom and reframe wall add closet. | $40,000 |