Back to kitchen remodel contractors
Quick Connect Electric Co
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2000 to May 2025
- Last 24 months
- 4 permits filed
66 permits since 2000: 50 completed, 6 never finaled, 10 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 12 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2025 | Completed final sign-off Oct 2025 | 1743 28th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $45,000 |
| Jun 10, 2024 | Completed final sign-off Sep 2024 | 1968 Jefferson St | remodel kitchen - lights, cabinets, sink replace in-kind (no moving walls)Details
remodel kitchen - lights, cabinets, sink replace in-kind (no moving walls) | $21,000 |
| Mar 16, 2023 | Completed final sign-off Jun 2023 | 1714 08th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment. | $27,000 |
| Feb 6, 2022 | Completed final sign-off Dec 2023 | 1878 41st Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $32,000 |
| Aug 21, 2014 | Completed final sign-off Aug 2016 | 495 12th Av | remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed.Details
remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed. | $53,000 |
| Aug 29, 2013 | Completed final sign-off Dec 2013 | 128 Judson Av | remove closet and hutch at dining room/kitchen. replace countertop in kitchen and install peninsula cabinets. no removal of bearing partitions.Details
remove closet and hutch at dining room/kitchen. replace countertop in kitchen and install peninsula cabinets. no removal of bearing partitions. | $8,400 |
| Jan 18, 2013 | Completed final sign-off Aug 2013 | 65 Fairmount St | remodel kitchen, dining and living room, replace cabinets, countertop & tile backsplash, install kitchen & living room lights (12), no structural work, sheetrock areas of work and install insulation to ceiling r-30 wall r-13Details
remodel kitchen, dining and living room, replace cabinets, countertop & tile backsplash, install kitchen & living room lights (12), no structural work, sheetrock areas of work and install insulation to ceiling r-30 wall r-13 | $21,000 |
| Jul 20, 2012 | Completed final sign-off Nov 2012 | 655 27th St | remodel interior stairway 1st fl & grnd fl. rework (e) stairway, (n) doors & windows throughout. re-stucco outside front & rear. repair deck rail & stair, (n) kitchen.Details
remodel interior stairway 1st fl & grnd fl. rework (e) stairway, (n) doors & windows throughout. re-stucco outside front & rear. repair deck rail & stair, (n) kitchen. | $120,000 |
| Jul 10, 2008 | Completed final sign-off Feb 2009 | 191 Edgehill Wy | install 20 lights. remodel one full bathroom. replace 10 windows on side and rear of building in existing opening.living room, dinning woom, kitchen, sheet rock removel + replacement electrical work.Details
install 20 lights. remodel one full bathroom. replace 10 windows on side and rear of building in existing opening.living room, dinning woom, kitchen, sheet rock removel + replacement electrical work. | $21,000 |
| Jun 12, 2007 | Completed final sign-off Aug 2007 | 160 Corwin St | remodel 1 bath, 1 kitchen and replace sliding patio door to deck in kind. no spec inspections for this work. permit to replace 200209277722s which is to be cancelled. insp keith mather requested change for final sign off of workDetails
remodel 1 bath, 1 kitchen and replace sliding patio door to deck in kind. no spec inspections for this work. permit to replace 200209277722s which is to be cancelled. insp keith mather requested change for final sign off of work | $21,000 |
| Feb 12, 2007 | Expired or cancelled expired Mar 2010 | 160 Corwin St | revision to appl#200209277722 scope of work reduced, now consisting of interior remodeling in apt. #4 only. remodel kitchen and master bathroom. no structural work.Details
revision to appl#200209277722 scope of work reduced, now consisting of interior remodeling in apt. #4 only. remodel kitchen and master bathroom. no structural work. | |
| Jun 10, 2004 | Expired or cancelled expired Oct 2007 | 206 Rose St | remodel kitchen. replace cabinets, sink,counter remodel bathroom. replace tub, toilet + sink tileDetails
remodel kitchen. replace cabinets, sink,counter remodel bathroom. replace tub, toilet + sink tile | $11,000 |
| Apr 6, 2004 | Completed final sign-off Aug 2004 | 633 Webster St | remodel bathroom & kitchen. sheetrock walls in area of plumbing & electrical work all work on 3rd flDetails
remodel bathroom & kitchen. sheetrock walls in area of plumbing & electrical work all work on 3rd fl | $15,000 |
| Nov 7, 2002 | Expired or cancelled cancelled Jan 2004 | 193 Caine Av | remove kitchens as per notice of violation 200234542Details
remove kitchens as per notice of violation 200234542 | $1,500 |
| Jun 24, 2002 | Never finaled issued Jun 2002, no final | 438 Fair Oaks St | replace cabinets & counters for 3 kitchens & 3 bathrooms.replace 3 tubs.sheetrock areas of work.neceDetails
replace cabinets & counters for 3 kitchens & 3 bathrooms.replace 3 tubs.sheetrock areas of work.nece | $30,600 |
| Jun 24, 2002 | Never finaled issued Jun 2002, no final | 442 Fair Oaks St | replace cabinets in kitchen & bath, replace counter top, tile floor in bathroom & wall at tubDetails
replace cabinets in kitchen & bath, replace counter top, tile floor in bathroom & wall at tub | $15,000 |
| May 6, 2002 | Completed final sign-off Jun 2002 | 2301 09th Av | repalce kitchen cabinets sink countertops, replace tub and tile surround sinkDetails
repalce kitchen cabinets sink countertops, replace tub and tile surround sink | $14,000 |
| May 8, 2001 | Expired or cancelled expired Sep 2001 | 1020 Florida St | repair dryrot on porch off kitchen on east side, replace balusters as needed to comply w 4" spacingDetails
repair dryrot on porch off kitchen on east side, replace balusters as needed to comply w 4" spacing | $2,500 |