Back to bathroom remodel contractors
Quick Connect Electric Co
- Based in
- Corte Madera
- On San Francisco permits
- Oct 2000 to May 2025
- Last 24 months
- 4 permits filed
66 permits since 2000: 50 completed, 6 never finaled, 10 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 13 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2025 | Completed final sign-off Oct 2025 | 1743 28th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $45,000 |
| Feb 2, 2025 | Completed final sign-off Jun 2025 | 2030 17th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $18,500 |
| Sep 16, 2022 | Completed final sign-off Oct 2022 | 160 Corwin St | simple remodel bathroom- tile, toilet, sink.Details
simple remodel bathroom- tile, toilet, sink. | $15,000 |
| Feb 6, 2022 | Completed final sign-off Dec 2023 | 1878 41st Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $32,000 |
| Jun 5, 2017 | Completed final sign-off May 2018 | 1714 08th Av | finish (e) rough plumbed bathroom, remove stair and turn into office, add 47 sq.ft. on 2/f & 3/f for a total of 94 s.f. addition in lightwell, remodel 2 baths on 3/f and add laundry on 2/f, provide exterior staircase.Details
finish (e) rough plumbed bathroom, remove stair and turn into office, add 47 sq.ft. on 2/f & 3/f for a total of 94 s.f. addition in lightwell, remodel 2 baths on 3/f and add laundry on 2/f, provide exterior staircase. | $164,000 |
| Aug 21, 2014 | Completed final sign-off Aug 2016 | 495 12th Av | remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed.Details
remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed. | $53,000 |
| Dec 28, 2011 | Completed final sign-off Feb 2012 | 1507 35th Av | remodel bathroom sink, toilet, shower. add sink to powder room. no structural work. lighting must comply w/cec 150(k). existing walls to remain without modification.Details
remodel bathroom sink, toilet, shower. add sink to powder room. no structural work. lighting must comply w/cec 150(k). existing walls to remain without modification. | $13,000 |
| Jul 10, 2008 | Completed final sign-off Feb 2009 | 191 Edgehill Wy | install 20 lights. remodel one full bathroom. replace 10 windows on side and rear of building in existing opening.living room, dinning woom, kitchen, sheet rock removel + replacement electrical work.Details
install 20 lights. remodel one full bathroom. replace 10 windows on side and rear of building in existing opening.living room, dinning woom, kitchen, sheet rock removel + replacement electrical work. | $21,000 |
| Jun 12, 2007 | Completed final sign-off Aug 2007 | 160 Corwin St | remodel 1 bath, 1 kitchen and replace sliding patio door to deck in kind. no spec inspections for this work. permit to replace 200209277722s which is to be cancelled. insp keith mather requested change for final sign off of workDetails
remodel 1 bath, 1 kitchen and replace sliding patio door to deck in kind. no spec inspections for this work. permit to replace 200209277722s which is to be cancelled. insp keith mather requested change for final sign off of work | $21,000 |
| Feb 12, 2007 | Expired or cancelled expired Mar 2010 | 160 Corwin St | revision to appl#200209277722 scope of work reduced, now consisting of interior remodeling in apt. #4 only. remodel kitchen and master bathroom. no structural work.Details
revision to appl#200209277722 scope of work reduced, now consisting of interior remodeling in apt. #4 only. remodel kitchen and master bathroom. no structural work. | |
| Jun 24, 2005 | Completed final sign-off Mar 2007 | 107 Ellsworth St | revision to pa 200403199163, relocate bathroom, revised framing for the family room.Details
revision to pa 200403199163, relocate bathroom, revised framing for the family room. | |
| Feb 15, 2005 | Completed final sign-off Jun 2005 | 1927 09th Av | install bathroom within 2nd floor bedroom where closet was.Details
install bathroom within 2nd floor bedroom where closet was. | $10,000 |
| Jun 10, 2004 | Expired or cancelled expired Oct 2007 | 206 Rose St | remodel kitchen. replace cabinets, sink,counter remodel bathroom. replace tub, toilet + sink tileDetails
remodel kitchen. replace cabinets, sink,counter remodel bathroom. replace tub, toilet + sink tile | $11,000 |
| Apr 15, 2004 | Completed final sign-off Aug 2004 | 633 Webster St | change room on top floor to bathroomDetails
change room on top floor to bathroom | $8,000 |
| Apr 6, 2004 | Completed final sign-off Aug 2004 | 633 Webster St | remodel bathroom & kitchen. sheetrock walls in area of plumbing & electrical work all work on 3rd flDetails
remodel bathroom & kitchen. sheetrock walls in area of plumbing & electrical work all work on 3rd fl | $15,000 |
| Jun 24, 2002 | Never finaled issued Jun 2002, no final | 438 Fair Oaks St | replace cabinets & counters for 3 kitchens & 3 bathrooms.replace 3 tubs.sheetrock areas of work.neceDetails
replace cabinets & counters for 3 kitchens & 3 bathrooms.replace 3 tubs.sheetrock areas of work.nece | $30,600 |
| Jun 24, 2002 | Never finaled issued Jun 2002, no final | 442 Fair Oaks St | replace cabinets in kitchen & bath, replace counter top, tile floor in bathroom & wall at tubDetails
replace cabinets in kitchen & bath, replace counter top, tile floor in bathroom & wall at tub | $15,000 |