Back to bathroom remodel contractors
Quality Painting Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Feb 2020
- Last 24 months
- 0 permits filed
252 permits since 2000: 222 completed, 22 never finaled, 8 expired or cancelled.
Of the 22 never-finaled permits, 13 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
115 bathroom remodel permits: 106 completed, 7 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2019 | Completed final sign-off Mar 2019 | 95 Rae Av | revise to bpa#201811085453 toi nclude upgrade hallway bathroom (51 sq. ft.), replace furnace, water heater, laundry.Details
revise to bpa#201811085453 toi nclude upgrade hallway bathroom (51 sq. ft.), replace furnace, water heater, laundry. | $17,000 |
| Nov 8, 2018 | Completed final sign-off Mar 2019 | 95 Rae Av | kitchen & bath remodel, no underground, replace (e) lights, with he, replace (e) kitchen & bath fans use (e) ducts, bathroom = 50 sq. ft., kitchen = 80 sq. ft.Details
kitchen & bath remodel, no underground, replace (e) lights, with he, replace (e) kitchen & bath fans use (e) ducts, bathroom = 50 sq. ft., kitchen = 80 sq. ft. | $41,000 |
| Nov 6, 2018 | Completed final sign-off Dec 2018 | 2190 34th Av | kitchen and bath remodel add 10 recessed lights. upgrade elec, new subpanel 100 amp new bath and kitchen fans, connect into e ducts. all new lights to be heDetails
kitchen and bath remodel add 10 recessed lights. upgrade elec, new subpanel 100 amp new bath and kitchen fans, connect into e ducts. all new lights to be he | $41,000 |
| Oct 1, 2018 | Completed final sign-off Jan 2019 | 2683 47th Av | kitchen & bathroom remodel, subpanel add 12 pressed lights, upgrade outlets 5x8 bath 10 x 10 kitchenDetails
kitchen & bathroom remodel, subpanel add 12 pressed lights, upgrade outlets 5x8 bath 10 x 10 kitchen | $47,000 |
| Aug 3, 2018 | Completed final sign-off Jan 2019 | 651 Scott St | unit 2: renovate kitchen and one bathroom, add 14 can lights, add new kitchen floor, paint. everything in the same location.Details
unit 2: renovate kitchen and one bathroom, add 14 can lights, add new kitchen floor, paint. everything in the same location. | $41,000 |
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 5415 Anza St | adding a ground floor bedroom, bathroom, and living area with in an extg 2 floor, single family homeDetails
adding a ground floor bedroom, bathroom, and living area with in an extg 2 floor, single family home | $95,000 |
| Jul 5, 2018 | Completed final sign-off Feb 2019 | 1451 Oakdale Av | build (n) bathroom in basement, build (n) interior stairs, remodel (e) kitchen & bathroom on 1st fl, remodel (e) bathroom 2nd fl. less than 75% wall removedDetails
build (n) bathroom in basement, build (n) interior stairs, remodel (e) kitchen & bathroom on 1st fl, remodel (e) bathroom 2nd fl. less than 75% wall removed | $130,000 |
| Jun 11, 2018 | Completed final sign-off Oct 2018 | 1190 Palou Av | interior remodeling: 1st fl: build (n) family room, (n) laundry room, remodel (e) bathrooom. 2nd fl: remodel/relocate (e) kitchen, remodel (e) bathroom, build (n) master bathroom.Details
interior remodeling: 1st fl: build (n) family room, (n) laundry room, remodel (e) bathrooom. 2nd fl: remodel/relocate (e) kitchen, remodel (e) bathroom, build (n) master bathroom. | $100,000 |
| May 29, 2018 | Completed final sign-off Oct 2019 | 805 Hampshire St | remove plaster, insulate, replace drywall through out, except for kitchen and garage and bathroom. new drywall to be 5/8" typ 'x' per sfbc sec 403.12.1Details
remove plaster, insulate, replace drywall through out, except for kitchen and garage and bathroom. new drywall to be 5/8" typ 'x' per sfbc sec 403.12.1 | $17,000 |
| May 8, 2018 | Completed final sign-off Aug 2018 | 2070 Fell St | (1) kitchen, (1) bathroom remodel in kind. upgrade electrial panel. no change of (e) floor plan; n/a maherDetails
(1) kitchen, (1) bathroom remodel in kind. upgrade electrial panel. no change of (e) floor plan; n/a maher | $22,000 |
| May 1, 2018 | Completed final sign-off Feb 2019 | 43 Edna St | ground floor: build new laundry, staircase, remodel bathroom, bedroom, family room. 2nd floor: build new bathroom, remodel extg kitchen, bathroom. attic: build new bathroomn, remodel extg bedrooms.Details
ground floor: build new laundry, staircase, remodel bathroom, bedroom, family room. 2nd floor: build new bathroom, remodel extg kitchen, bathroom. attic: build new bathroomn, remodel extg bedrooms. | $100,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2018 | 107 Maddux Av | 1st floor: build new mudroom, new bathroom, new entry, two (n) bedrooms, new furnae and water heater. 2nd floor: build new bathroom, remodel extg kitchen, bedroom and bathroom.Details
1st floor: build new mudroom, new bathroom, new entry, two (n) bedrooms, new furnae and water heater. 2nd floor: build new bathroom, remodel extg kitchen, bedroom and bathroom. | $100,000 |
| Apr 24, 2018 | Completed final sign-off Nov 2018 | 1119 Hollister Av | revision to ba# 201802211844 to include adding 1 bathroom at 2nd flr, changeout windows doors at rear, remove 1 structural wall & 1 partition wall, changeout furnaceDetails
revision to ba# 201802211844 to include adding 1 bathroom at 2nd flr, changeout windows doors at rear, remove 1 structural wall & 1 partition wall, changeout furnace | $40,000 |
| Apr 11, 2018 | Completed final sign-off Oct 2018 | 1190 Palou Av | open walls/ceiling not, including kitchen & bath, add insualtion througout. rainfall type x 5/8" inch drywall. prime paint, type 5d cooler nails at 4" oc. exterior walls only. r-19 & r-30 insulation.Details
open walls/ceiling not, including kitchen & bath, add insualtion througout. rainfall type x 5/8" inch drywall. prime paint, type 5d cooler nails at 4" oc. exterior walls only. r-19 & r-30 insulation. | $11,000 |
| Apr 9, 2018 | Completed final sign-off Oct 2018 | 107 Maddux Av | open up walls, install insulation throughout. replace with 5/8 type x sheetrock prime/paint. excluding kitchen and bathrooms. install 5/8 deck. bedroom, family room, hallway storageDetails
open up walls, install insulation throughout. replace with 5/8 type x sheetrock prime/paint. excluding kitchen and bathrooms. install 5/8 deck. bedroom, family room, hallway storage | $7,000 |
| Mar 14, 2018 | Completed final sign-off Sep 2018 | 1669 Grove St | remodel bathroom in kind. new tile, fixtures etc. no wall moves.Details
remodel bathroom in kind. new tile, fixtures etc. no wall moves. | $14,000 |
| Feb 21, 2018 | Completed final sign-off Nov 2018 | 1119 Hollister Av | kitchen / baths remodel in kind. upgrade electrical. no alteration of any wall.Details
kitchen / baths remodel in kind. upgrade electrical. no alteration of any wall. | $35,000 |
| Jan 30, 2018 | Completed final sign-off Dec 2018 | 2366 31st Av | remodel existing kitchen and bathroom. enclosed a lightwell, rebuild existing interior staircase, new skylightsDetails
remodel existing kitchen and bathroom. enclosed a lightwell, rebuild existing interior staircase, new skylights | $80,000 |
| Jan 26, 2018 | Completed final sign-off May 2018 | 1231 Grove St | remodel kitchen and bath, add laundry, replace window door with new sliding glass door, replace rear porch in kind, new subpanel, add 20 can lights.Details
remodel kitchen and bath, add laundry, replace window door with new sliding glass door, replace rear porch in kind, new subpanel, add 20 can lights. | $37,000 |
| Dec 7, 2017 | Completed final sign-off Jun 2018 | 1563 Revere Av | remodel sfd: new kitchen enlarged into extg breakfast room, new master bath, nw master closet, remodel 2 extg baths, rebuild interior stairs to 36" width, nw bedroom closet doors, add skylights, nw elec plan, repair rear exterior stairs, repair exterior side stairs as per extg.add new post & footingDetails
remodel sfd: new kitchen enlarged into extg breakfast room, new master bath, nw master closet, remodel 2 extg baths, rebuild interior stairs to 36" width, nw bedroom closet doors, add skylights, nw elec plan, repair rear exterior stairs, repair exterior side stairs as per extg.add new post & footing | $175,000 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 77 Toledo Wy | remodel (e) kitchen, 3 (4) bathrooms, build new half-bath, new stairs to ground floor, build new laundry, install new wod frame window in front of property,widen garage, enlarge window in rear door.Details
remodel (e) kitchen, 3 (4) bathrooms, build new half-bath, new stairs to ground floor, build new laundry, install new wod frame window in front of property,widen garage, enlarge window in rear door. | $50,000 |
| Oct 10, 2017 | Completed final sign-off Jul 2018 | 480 09th Av | unit #b: kitchen and bath remodel, in kind. upgrade electrical and lightingDetails
unit #b: kitchen and bath remodel, in kind. upgrade electrical and lighting | $27,000 |
| Sep 25, 2017 | Completed final sign-off Apr 2018 | 566 Mangels Av | add a family room at garage lvel, add bath at garage level, add laundry rm at garage lvel, relocate furnace, wh, sink, new window in rear, remodel e 2nd fl: kitchen, 2 baths, 3 bedrooms.Details
add a family room at garage lvel, add bath at garage level, add laundry rm at garage lvel, relocate furnace, wh, sink, new window in rear, remodel e 2nd fl: kitchen, 2 baths, 3 bedrooms. | $50,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2018 | 230 Central Av | unit#14 remodel kitchen & bath in-kind. upgrade electrical. no alteration of wall, window & door. n/a for maher.Details
unit#14 remodel kitchen & bath in-kind. upgrade electrical. no alteration of wall, window & door. n/a for maher. | $29,000 |
| Aug 29, 2017 | Completed final sign-off Mar 2018 | 1133 Fell St | unit #11 - convert studio to one bedroom, remodel kitchen & bath in kind, add laundry upgrade electrical panel, remvoe non-load bearing walls.Details
unit #11 - convert studio to one bedroom, remodel kitchen & bath in kind, add laundry upgrade electrical panel, remvoe non-load bearing walls. | $35,000 |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 203 Corbett Av | remodel kitchen & bath in kind, replace 6 windows at rear of house.Details
remodel kitchen & bath in kind, replace 6 windows at rear of house. | $27,000 |
| Jul 12, 2017 | Completed final sign-off Dec 2017 | 1415 Oakdale Av | 2/f: remodel (e) bathroom & (e) kitchen. build (n) master bathroom. install (n) interior finishes. install (n) windows in rear of property.Details
2/f: remodel (e) bathroom & (e) kitchen. build (n) master bathroom. install (n) interior finishes. install (n) windows in rear of property. | $30,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2020 | 929 Ashbury St | remodel kitchen, 2 baths in kind, upgrade panel, no walls to be removed/altered.Details
remodel kitchen, 2 baths in kind, upgrade panel, no walls to be removed/altered. | $47,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 1809 California St | unit #302:renovate kitchen move and renovate bathroom, add laundry room, upgrade electrical. remove some partition walls and paint unit. n/a for maher.Details
unit #302:renovate kitchen move and renovate bathroom, add laundry room, upgrade electrical. remove some partition walls and paint unit. n/a for maher. | $35,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 1809 California St | unit #502:renovate kitchen move and renovate bathroom, add laundry room, upgrade electrical. remove some partition walls and paint unit. n/a for maher.Details
unit #502:renovate kitchen move and renovate bathroom, add laundry room, upgrade electrical. remove some partition walls and paint unit. n/a for maher. | $35,000 |
| Feb 17, 2017 | Completed final sign-off Jul 2017 | 1662 40th Av | interior remodel, gr fl remodel- existing bathroom, build new partition wall , new doors. 2nd fl- remove door to interior stairs, install new window into interior stairwell. gr fl to include office and master bedroomDetails
interior remodel, gr fl remodel- existing bathroom, build new partition wall , new doors. 2nd fl- remove door to interior stairs, install new window into interior stairwell. gr fl to include office and master bedroom | $10,000 |
| Feb 6, 2017 | Completed final sign-off Apr 2017 | 2335 Ulloa St | upgrade wall framing on 1st floor. revision to app#201611031862. legalize rooms down @ ground floor with half bath & one bedroom per 2a bulletin #1 and plans.Details
upgrade wall framing on 1st floor. revision to app#201611031862. legalize rooms down @ ground floor with half bath & one bedroom per 2a bulletin #1 and plans. | $1,000 |
| Jan 20, 2017 | Completed final sign-off May 2017 | 48 Collins St | kitchen 2 baths remodel in kind add 20 recessed lights upgrade electriccal new subpanelDetails
kitchen 2 baths remodel in kind add 20 recessed lights upgrade electriccal new subpanel | $58,000 |
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 3914 23rd St | 3914b 23rd street: working at cottage at rear of house: remodel kitchen & bathroom: change out appliances, cabinets and fixtures in-kind. upgrade panel & electrical to code, paint, tile, flooring.Details
3914b 23rd street: working at cottage at rear of house: remodel kitchen & bathroom: change out appliances, cabinets and fixtures in-kind. upgrade panel & electrical to code, paint, tile, flooring. | $23,000 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 1231 Grove St | unit #8: remodel (1) kitchen and (1) bath in kind, add laundry in existing closet, add 17 recessed lights, upgrade elec, install subpanel maher not reqDetails
unit #8: remodel (1) kitchen and (1) bath in kind, add laundry in existing closet, add 17 recessed lights, upgrade elec, install subpanel maher not req | $21,000 |
| Nov 21, 2016 | Completed final sign-off May 2017 | 2110 28th Av | build new exterior wall, build new roof over (e) patio, rebuild (n) interior stair, remodel (e) kitchen & (e) bathroom. add (n) bathroom, build new interior walls, add 2 (n) skylightsDetails
build new exterior wall, build new roof over (e) patio, rebuild (n) interior stair, remodel (e) kitchen & (e) bathroom. add (n) bathroom, build new interior walls, add 2 (n) skylights | $80,000 |
| Nov 3, 2016 | Completed final sign-off Apr 2017 | 2335 Ulloa St | remodel bathroom, upgrade elctrical downstairs.Details
remodel bathroom, upgrade elctrical downstairs. | $17,000 |
| Sep 1, 2016 | Completed final sign-off Jan 2018 | 78 Lee Av | per ord 43-14. legalizae ground floor unit consisting of 1 kitchen, 1 bedroom 1 full bath. & living room. remove prop ceiling and add new unit entry.Details
per ord 43-14. legalizae ground floor unit consisting of 1 kitchen, 1 bedroom 1 full bath. & living room. remove prop ceiling and add new unit entry. | $10,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 1231 Grove St | unit 7 - remodel kitchen and bath in kind, add laundry, add 17 recessed lights upgrade electrical install subpanel. maher naDetails
unit 7 - remodel kitchen and bath in kind, add laundry, add 17 recessed lights upgrade electrical install subpanel. maher na | $21,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 1231 Grove St | unit 6 - remodel kitchen and bath in kind, add launry, add 17 recessed lights upgrade, electrical install subpanel. maher naDetails
unit 6 - remodel kitchen and bath in kind, add launry, add 17 recessed lights upgrade, electrical install subpanel. maher na | $21,000 |
| Jun 14, 2016 | Completed final sign-off Dec 2016 | 851 46th Av | 2nd floor reconfiguratiion kitchen move & remodel add bath. add in-set lighting replace back windows.Details
2nd floor reconfiguratiion kitchen move & remodel add bath. add in-set lighting replace back windows. | $150,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 339 Orizaba Av | replace siding and windows, remodel main floor, remodel ground floor,add family room & bathroom.Details
replace siding and windows, remodel main floor, remodel ground floor,add family room & bathroom. | $100,000 |
| May 27, 2016 | Completed final sign-off Aug 2017 | 1565 Grove St | revision to pa 2015-1221-5656 - revise interior partitions on 3rd to include 2 new bath & laundry. revise new sprinkler system from nfpa to nfpa 13r (already submitted separately)Details
revision to pa 2015-1221-5656 - revise interior partitions on 3rd to include 2 new bath & laundry. revise new sprinkler system from nfpa to nfpa 13r (already submitted separately) | $12,000 |
| Apr 22, 2016 | Completed final sign-off Jul 2016 | 1582 Funston Av | bathroom remodel in-kind; panel upgrade.Details
bathroom remodel in-kind; panel upgrade. | $12,000 |
| Mar 4, 2016 | Completed final sign-off Dec 2016 | 3234 Divisadero St | unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof.Details
unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof. | $165,000 |
| Jan 12, 2016 | Completed final sign-off Jun 2016 | 3092 Market St | remodel kitchen, 2.5 baths, change out siding to hardy plank (front & back)Details
remodel kitchen, 2.5 baths, change out siding to hardy plank (front & back) | $55,000 |
| Dec 22, 2015 | Completed final sign-off May 2016 | 106 Dellbrook Av | all work on g/f only- relocate (e) furnace & water heater, build new bathroom & bedroom, new 1 hr. rated partition walls.Details
all work on g/f only- relocate (e) furnace & water heater, build new bathroom & bedroom, new 1 hr. rated partition walls. | $35,000 |
| Dec 21, 2015 | Completed final sign-off Aug 2017 | 1567 Grove St | to comply with nov 201497581 items 1 & 3, general renovation of 1st story to include regrading, new garage layout, new habitable master bedroom. new foundations & slab. structural seismic upgrades. new interior partitions each unit. replacement of kitchen & baths with new at each unit. new windows,Details
to comply with nov 201497581 items 1 & 3, general renovation of 1st story to include regrading, new garage layout, new habitable master bedroom. new foundations & slab. structural seismic upgrades. new interior partitions each unit. replacement of kitchen & baths with new at each unit. new windows, | $500,000 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 651 Scott St | unit 11: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind.Details
unit 11: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind. | $32,000 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 651 Scott St | unit 5: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind.Details
unit 5: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind. | $32,000 |
| Nov 5, 2015 | Completed final sign-off Nov 2018 | 2311 Balboa St | vertical addition of a 3rd story & roof deck & interior remodel, including (n) kitchen & bathDetails
vertical addition of a 3rd story & roof deck & interior remodel, including (n) kitchen & bath | $280,000 |
| Oct 22, 2015 | Completed final sign-off Dec 2016 | 136 Bradford St | additional to pa#201510139524, add third bathroom, relocate laundry hookup within 5' of existing location.Details
additional to pa#201510139524, add third bathroom, relocate laundry hookup within 5' of existing location. | $71,323 |
| Oct 13, 2015 | Completed final sign-off Dec 2016 | 136 Bradford St | kitchen bath remodel in kind.Details
kitchen bath remodel in kind. | $27,500 |
| Sep 4, 2015 | Completed final sign-off Feb 2016 | 314 Victoria St | build out of unoccupied space on the 1st floor to 477 sq ft of conditioned space consisting of a bedroom and bathroom and a bathroom remodel on the 2nd floor.Details
build out of unoccupied space on the 1st floor to 477 sq ft of conditioned space consisting of a bedroom and bathroom and a bathroom remodel on the 2nd floor. | $20,000 |
| Aug 31, 2015 | Completed final sign-off Oct 2015 | 2979 19th Av | bathroom remodel and upgrade electrical in two bedrooms, new sub-panel. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel and upgrade electrical in two bedrooms, new sub-panel. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $17,000 |
| Aug 4, 2015 | Completed final sign-off Dec 2015 | 1900 Sutter St | apt #11. remodel kitchen, 1.5 bath, add laundry, upgrade panel. (e) exh fan be replaced, ventless dryer, all new kitchen lights shall be led.Details
apt #11. remodel kitchen, 1.5 bath, add laundry, upgrade panel. (e) exh fan be replaced, ventless dryer, all new kitchen lights shall be led. | $35,000 |
| Jun 19, 2015 | Completed final sign-off Nov 2015 | 1323 Lyon St | remodel kitchen - replace cabinets & appliances, paint. remodel bathroom in kind - 1323 #a only.Details
remodel kitchen - replace cabinets & appliances, paint. remodel bathroom in kind - 1323 #a only. | $19,000 |
| May 13, 2015 | Completed final sign-off Oct 2015 | 649 14th Av | remodel kitchen, remodel bathroom, move partition wall, add 1/2 bath, rellocate laundry, add partiton wall, remove closet walls to create additonal bedroom. upsize one light in interior lightwell.Details
remodel kitchen, remodel bathroom, move partition wall, add 1/2 bath, rellocate laundry, add partiton wall, remove closet walls to create additonal bedroom. upsize one light in interior lightwell. | $30,000 |
| May 13, 2015 | Completed final sign-off Oct 2015 | 647 14th Av | remodel bath, upgrade elect, relocate laundry, move partition wall, legalize gr fl full bathDetails
remodel bath, upgrade elect, relocate laundry, move partition wall, legalize gr fl full bath | $12,000 |
| Apr 13, 2015 | Completed final sign-off Jul 2015 | 124 Romain St | 1.5 bathroom remodel. no change to existing layout and openings. high efficacy lighting or controlled by manual on sensor with high efficacy main switch light.Details
1.5 bathroom remodel. no change to existing layout and openings. high efficacy lighting or controlled by manual on sensor with high efficacy main switch light. | $15,000 |
| Jan 13, 2015 | Completed final sign-off Apr 2015 | 844 46th Av | 2 bathroom, kitchen remodel, replace fixtures in-kind, relocate subpanel out of closet, install 20 recessed lights, paint replace flooring. to comply with all applicable codes. no walls moved/removed/added, all layouts unchanged.Details
2 bathroom, kitchen remodel, replace fixtures in-kind, relocate subpanel out of closet, install 20 recessed lights, paint replace flooring. to comply with all applicable codes. no walls moved/removed/added, all layouts unchanged. | $42,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2017 | 628 46th Av | add 3rd story addition to (e) 2 story residence, a (n) stair on north side of 2nd floor will access (n) 3rd story which will contain 3 bedrooms and 2 baths.(n) roof deck on (e) roof at rear pop-out.Details
add 3rd story addition to (e) 2 story residence, a (n) stair on north side of 2nd floor will access (n) 3rd story which will contain 3 bedrooms and 2 baths.(n) roof deck on (e) roof at rear pop-out. | $250,000 |
| Nov 14, 2014 | Completed final sign-off Apr 2016 | 2526 Francisco St | remodel house- kitchen, 4 baths, new floors, 50+ can lights. kitchen lighting: min. 50% of total watage shall be high efficacy. bathroom lighting: permanent lights shall be high efficacy unless controlled by manuel on occupancy sensors. n/a ordinance #155-13.Details
remodel house- kitchen, 4 baths, new floors, 50+ can lights. kitchen lighting: min. 50% of total watage shall be high efficacy. bathroom lighting: permanent lights shall be high efficacy unless controlled by manuel on occupancy sensors. n/a ordinance #155-13. | $75,000 |
| Nov 10, 2014 | Completed final sign-off Mar 2015 | 3719 Scott St | improvement on 1st floor. adding one living room, one bedroom, one full bathroom, a laundry area and relocation of utilities per plan. replace rear windows.Details
improvement on 1st floor. adding one living room, one bedroom, one full bathroom, a laundry area and relocation of utilities per plan. replace rear windows. | $43,000 |
| Oct 29, 2014 | Completed final sign-off May 2015 | 43 Gladeview Wy | kitchen, bath remodel, change out panels, remove one partition wall, upgrade electrical, redo floors and paintDetails
kitchen, bath remodel, change out panels, remove one partition wall, upgrade electrical, redo floors and paint | $35,000 |
| Jul 28, 2014 | Completed final sign-off Nov 2014 | 155 Juanita Wy | remodel 2 bathrooms at main & lower level; to comply with cec150(k)10Details
remodel 2 bathrooms at main & lower level; to comply with cec150(k)10 | $13,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 3036 Webster St | kitchen and bathroom remodel, enlarge door openings. install 12-lights, upgrade electrical panels and repaint.Details
kitchen and bathroom remodel, enlarge door openings. install 12-lights, upgrade electrical panels and repaint. | $50,000 |
| Jun 10, 2014 | Completed final sign-off May 2015 | 1527 35th Av | lower level remodel, including excavation of concrete slab/foundation, addition of new half bath and remodel of extg full bath.Details
lower level remodel, including excavation of concrete slab/foundation, addition of new half bath and remodel of extg full bath. | $100,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2018 | 249 Santa Rosa Av | add bathroom, bedroom, sitting area to extg unconditioned space. rebuild extg stairs in kind on 1st floor.Details
add bathroom, bedroom, sitting area to extg unconditioned space. rebuild extg stairs in kind on 1st floor. | $16,500 |
| Jan 10, 2014 | Completed final sign-off Aug 2014 | 3542 Broderick St | interior remodel of kitchen and bath, 3rd fl convert utility into new bath at 3rd fl. compliance with ordinance no. 155-13 not required.Details
interior remodel of kitchen and bath, 3rd fl convert utility into new bath at 3rd fl. compliance with ordinance no. 155-13 not required. | $50,000 |
| Nov 20, 2013 | Completed final sign-off Aug 2014 | 1419 Clay St | interior remodel, remove walls to remodel living room, dining, kitchen, bathroom, bedrooms. relocate bathroom #1 & office. enlarge bathroom #2.Details
interior remodel, remove walls to remodel living room, dining, kitchen, bathroom, bedrooms. relocate bathroom #1 & office. enlarge bathroom #2. | $54,000 |
| Nov 12, 2013 | Completed final sign-off Feb 2014 | 1287 04th Av | add new bathroom and dressing roomDetails
add new bathroom and dressing room | $12,000 |
| Nov 12, 2013 | Completed final sign-off Mar 2015 | 1285 04th Av | add new bathroom and dressing roomDetails
add new bathroom and dressing room | $12,000 |
| Oct 21, 2013 | Completed final sign-off Jul 2014 | 440 Linden St | comply with his#200734733-remodel of complete building. existing wall sheathing to remain.-add 1 bathroom & 2 closets in unit #440, add powder room & 2 closets in 442, add powder room & 2 clsoets in 444. change (e) shingles to wood sidingDetails
comply with his#200734733-remodel of complete building. existing wall sheathing to remain.-add 1 bathroom & 2 closets in unit #440, add powder room & 2 closets in 442, add powder room & 2 clsoets in 444. change (e) shingles to wood siding | $300,000 |
| Sep 25, 2013 | Completed final sign-off Oct 2013 | 487 Lakeshore Dr | revision to app#201309066215. remove and relocate non bearing partition wall at north side of bathroom per plans.Details
revision to app#201309066215. remove and relocate non bearing partition wall at north side of bathroom per plans. | |
| Sep 24, 2013 | Completed final sign-off Mar 2014 | 220 Lombard St | unit #714, remodel kitchen & 2 bathrooms, move 1 partition wall, adjust fire sprinkler coverage, and replace 4 lights in kind.Details
unit #714, remodel kitchen & 2 bathrooms, move 1 partition wall, adjust fire sprinkler coverage, and replace 4 lights in kind. | $35,000 |
| Sep 6, 2013 | Completed final sign-off Oct 2013 | 487 Lakeshore Dr | remodel bathroom on 1/f- replace in kind ; electrical to cec 150(k) 10Details
remodel bathroom on 1/f- replace in kind ; electrical to cec 150(k) 10 | $9,000 |
| Jul 29, 2013 | Completed final sign-off Sep 2013 | 487 Lakeshore Dr | one bathroom remodel. upgrade electrical to title 24 standardsDetails
one bathroom remodel. upgrade electrical to title 24 standards | $17,500 |
| Jul 23, 2013 | Completed final sign-off Oct 2013 | 3234 Washington St | #4 - remodel kitchen & 2 bathrooms, replace fixtures & appliances in kind. bring lighting to title 24, install laundry electrical to code, add laundry - wash/dryer, no structural.Details
#4 - remodel kitchen & 2 bathrooms, replace fixtures & appliances in kind. bring lighting to title 24, install laundry electrical to code, add laundry - wash/dryer, no structural. | $20,000 |
| Jun 25, 2013 | Completed final sign-off Oct 2013 | 3201 Moraga St | bathroom remodel, electrical done to titel 24 standards, change out fixturesDetails
bathroom remodel, electrical done to titel 24 standards, change out fixtures | $5,200 |
| Apr 12, 2013 | Completed final sign-off Aug 2014 | 235 Duncan St | remodel single family dwelling-conversion of 1st fl storage & garage space into habitable space includes new 1 bedrm, 1 full bathrm, 1 family rm, full remodel of (e) 2nd floor kitchen, bedrooms, living room, bathrooms. addition of new water closet on 2nd floor. replace and/or new windows of exterDetails
remodel single family dwelling-conversion of 1st fl storage & garage space into habitable space includes new 1 bedrm, 1 full bathrm, 1 family rm, full remodel of (e) 2nd floor kitchen, bedrooms, living room, bathrooms. addition of new water closet on 2nd floor. replace and/or new windows of exter | $180,000 |
| Mar 20, 2013 | Completed final sign-off Nov 2013 | 235 Duncan St | remodel 2 bathrooms & kitchen , replace cabinets appliances and fixtures in kind, upgrade electrical to current code.Details
remodel 2 bathrooms & kitchen , replace cabinets appliances and fixtures in kind, upgrade electrical to current code. | $18,000 |
| Mar 13, 2013 | Never finaled issued Mar 2013, no final | 58 Woodward St | kitchen & bathroom remodel - replace cabinets fixtures, appliances, laundry in kind, add sub panel, upgrade electrical to code.Details
kitchen & bathroom remodel - replace cabinets fixtures, appliances, laundry in kind, add sub panel, upgrade electrical to code. | $12,000 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 1432 Hyde St | remodel of bathroom, (n) partition wall to create walk in closet at first floor level. add partition wall to create home office at second floor.Details
remodel of bathroom, (n) partition wall to create walk in closet at first floor level. add partition wall to create home office at second floor. | $10,000 |
| Jan 28, 2013 | Completed final sign-off Mar 2013 | 2801 Jackson St | replace tile and plumbing fixtures in one bathroomDetails
replace tile and plumbing fixtures in one bathroom | $6,000 |
| Nov 19, 2012 | Completed final sign-off Dec 2012 | 600 Chestnut St | replace kitchen countertop and sink with faucet; replace tile in two bathrooms, replace rough-in bathtub valves, replace tub with shower pan in masterbath, replace vanitiesDetails
replace kitchen countertop and sink with faucet; replace tile in two bathrooms, replace rough-in bathtub valves, replace tub with shower pan in masterbath, replace vanities | $10,000 |
| Oct 5, 2012 | Completed final sign-off Nov 2012 | 1250 Pacific Av | remodel bathroom, replace vanity tub, add fan, change tile, replace hidden window with glass block approx 45 sq ft.Details
remodel bathroom, replace vanity tub, add fan, change tile, replace hidden window with glass block approx 45 sq ft. | $9,000 |
| Jul 12, 2012 | Completed final sign-off Aug 2012 | 963 North Point St | rear building- minor revision to pa# 201205079908. keep partial storage loft, walls of existing bathroom, fixtures removed. space to reamin vacant per ab-017, improvement work on future permitDetails
rear building- minor revision to pa# 201205079908. keep partial storage loft, walls of existing bathroom, fixtures removed. space to reamin vacant per ab-017, improvement work on future permit | |
| Feb 28, 2012 | Completed final sign-off Sep 2012 | 1640 Lyon St | proposed kitchen & bathroom remodel for all 3-levels, voluntary provide plywood on 2-walls on 3-floors above & on walls on basement floor with anchor bolts. replace all 68-windows in-kind. (48-windows on front & side of bldg are wood & 20 window at rear are vinyl).Details
proposed kitchen & bathroom remodel for all 3-levels, voluntary provide plywood on 2-walls on 3-floors above & on walls on basement floor with anchor bolts. replace all 68-windows in-kind. (48-windows on front & side of bldg are wood & 20 window at rear are vinyl). | $60,000 |
| Feb 23, 2012 | Completed final sign-off Nov 2012 | 1432 Hyde St | excavate basement to make conditioned space connect with new internal stairs, new bathroom. remodel both kitchens & relocate rear yard stairs, front windows to replaced in kind - wood for wood.Details
excavate basement to make conditioned space connect with new internal stairs, new bathroom. remodel both kitchens & relocate rear yard stairs, front windows to replaced in kind - wood for wood. | $98,000 |
| Nov 22, 2011 | Completed final sign-off Mar 2012 | 1130 Shrader St | #3: residential remodel of existing (1) kitchen and (1) bath. add additional bathroom. add one new window and skylight. replace (5) windows w/ 4 windows increasing in size.Details
#3: residential remodel of existing (1) kitchen and (1) bath. add additional bathroom. add one new window and skylight. replace (5) windows w/ 4 windows increasing in size. | $24,000 |
| Oct 20, 2011 | Completed final sign-off Jul 2012 | 2101 Ellis St | remodel unit 2101; 2103; 2107; & 2109; add (n) a bathroom in unit 2109 &; provide seismic upgrade (voluntary).add 2 new bedrooms-Details
remodel unit 2101; 2103; 2107; & 2109; add (n) a bathroom in unit 2109 &; provide seismic upgrade (voluntary).add 2 new bedrooms- | $50,000 |
| Oct 12, 2011 | Completed final sign-off Mar 2012 | 3272 Mission St | kitchen/bath remodel replace fixtures in kind, remove added partition wall, add 1 partition wall in corner of room panel upgrade. comply with his nov 201124801. repair rear exterior stairs. no change to lighting to comply with cec 150 k windows walls or doors.Details
kitchen/bath remodel replace fixtures in kind, remove added partition wall, add 1 partition wall in corner of room panel upgrade. comply with his nov 201124801. repair rear exterior stairs. no change to lighting to comply with cec 150 k windows walls or doors. | $18,500 |
| Aug 29, 2011 | Completed final sign-off Nov 2011 | 2166 20th Av | bath remodel on 1st floor. replace existing tileDetails
bath remodel on 1st floor. replace existing tile | $9,037 |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 925 Geary St | #403 - 1 bathroom remodel, change plumbing fixtures, floor tile, paint walls. lighting to comply with cec150(k). install co/smoke detector, no change to windows, walls or doors. comply with co alarm per cbc420.1Details
#403 - 1 bathroom remodel, change plumbing fixtures, floor tile, paint walls. lighting to comply with cec150(k). install co/smoke detector, no change to windows, walls or doors. comply with co alarm per cbc420.1 | $4,000 |
| Aug 25, 2011 | Completed final sign-off Nov 2011 | 925 Geary St | #106 - kitchen/bath remodel, upgrade panel, lighting to comply with cec150(k). install co/smoke detector, repaint walls, refinish floor. no change to windows, walls or doors. comply with co alarm per cbc420.1Details
#106 - kitchen/bath remodel, upgrade panel, lighting to comply with cec150(k). install co/smoke detector, repaint walls, refinish floor. no change to windows, walls or doors. comply with co alarm per cbc420.1 | $17,000 |
| Aug 8, 2011 | Completed final sign-off Oct 2011 | 240 Cumberland St | #208- kitchen & bath remodel, panel upgrade, replace fixtures in kind & number. co alarm shall comply with cbc 2010 sect. 420.1Details
#208- kitchen & bath remodel, panel upgrade, replace fixtures in kind & number. co alarm shall comply with cbc 2010 sect. 420.1 | $9,000 |
| Jul 27, 2011 | Completed final sign-off Sep 2011 | 3474 17th St | unit # 3: one bathroom remodel: new tile, fixtures, switches, light. (all in kind). replace bathroom window.Details
unit # 3: one bathroom remodel: new tile, fixtures, switches, light. (all in kind). replace bathroom window. | $5,000 |
| Apr 7, 2011 | Completed final sign-off Jan 2012 | 3649 17th St | unit #3651-revision to pa# 2010-1012-2728-changes include moving bathroom & building living room rather than pantry & mud room. exterior not impacted, re-organization of interior space. structural revision. revision to (e) permit #201010122728.Details
unit #3651-revision to pa# 2010-1012-2728-changes include moving bathroom & building living room rather than pantry & mud room. exterior not impacted, re-organization of interior space. structural revision. revision to (e) permit #201010122728. | $6,000 |
| Mar 24, 2011 | Completed final sign-off May 2011 | 240 Cumberland St | kitchen and bath remodel. kitchen atleast 50% high eff lighting, bath he or occupancy sensor. no new exhaust systemDetails
kitchen and bath remodel. kitchen atleast 50% high eff lighting, bath he or occupancy sensor. no new exhaust system | $5,000 |