Quality Painting Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Feb 2020
- Last 24 months
- 0 permits filed
252 permits since 2000: 222 completed, 22 never finaled, 8 expired or cancelled.
Of the 22 never-finaled permits, 13 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
10 roof deck permits: 9 completed, 1 never finaled. Typically 44 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2017 | Completed final sign-off Nov 2018 | 2311 Balboa St | revision to pa #201511051876 - to add a roof deck.Details
revision to pa #201511051876 - to add a roof deck. | $15,000 |
| Oct 4, 2016 | Completed final sign-off Jul 2017 | 1250 Pacific Av | new roof deck to replace (e) non-complying deck. new roof access to deck with roof hatch - parapet walls @ p.l. 4'-0" max 1 hr rated. serving 3rd fl unit only. comply with sfdbi ab-057. jjcDetails
new roof deck to replace (e) non-complying deck. new roof access to deck with roof hatch - parapet walls @ p.l. 4'-0" max 1 hr rated. serving 3rd fl unit only. comply with sfdbi ab-057. jjc | $10,000 |
| May 26, 2016 | Completed final sign-off Aug 2017 | 1565 Grove St | revision to pa 2015-1221-5656 2 new stairs to 2 new roof decks.Details
revision to pa 2015-1221-5656 2 new stairs to 2 new roof decks. | $37,000 |
| Mar 4, 2016 | Completed final sign-off Dec 2016 | 3234 Divisadero St | unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof.Details
unit 3234 - remodel (e) kitchen & bathroom, add (n) bathrm. replace 9e) staircase and convert (e) bedrooms to media room. legalize (e) conditioned space (bedroom); unit 3236 - relocate kitchen, add (n) bedroom & (n) bathroom; add (n) roof deck & (n) interior stair to roof. | $165,000 |
| Nov 5, 2015 | Completed final sign-off Nov 2018 | 2311 Balboa St | vertical addition of a 3rd story & roof deck & interior remodel, including (n) kitchen & bathDetails
vertical addition of a 3rd story & roof deck & interior remodel, including (n) kitchen & bath | $280,000 |
| Feb 3, 2015 | Completed final sign-off Jul 2015 | 9 Alpine Tr | add roof deck (225 sf not visible from street) with existing roof hatch over internal stair leading to the roof.Details
add roof deck (225 sf not visible from street) with existing roof hatch over internal stair leading to the roof. | $15,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2017 | 628 46th Av | add 3rd story addition to (e) 2 story residence, a (n) stair on north side of 2nd floor will access (n) 3rd story which will contain 3 bedrooms and 2 baths.(n) roof deck on (e) roof at rear pop-out.Details
add 3rd story addition to (e) 2 story residence, a (n) stair on north side of 2nd floor will access (n) 3rd story which will contain 3 bedrooms and 2 baths.(n) roof deck on (e) roof at rear pop-out. | $250,000 |
| Mar 14, 2014 | Completed final sign-off Aug 2014 | 3542 Broderick St | new roof deck, access hatch & stairs. compliance with ordinance #155-13 not requiredDetails
new roof deck, access hatch & stairs. compliance with ordinance #155-13 not required | $42,000 |
| Mar 20, 2013 | Never finaled issued May 2015, no final | 987 Dolores St | add interior access stairway to roof deck & stair enclosure create new walkable roof surface, non combusible pavers on pedistal system. extend exterior rear stair to roof for fire dept. access.Details
add interior access stairway to roof deck & stair enclosure create new walkable roof surface, non combusible pavers on pedistal system. extend exterior rear stair to roof for fire dept. access. | $30,000 |
| Jul 12, 2012 | Completed final sign-off Oct 2013 | 959 Jackson St | install about 70 linear feet, 42 inch high safety guardrail on existing roof. adding 400 sf roof deck and 30" 1 hour parapet access from unit 3a only.Details
install about 70 linear feet, 42 inch high safety guardrail on existing roof. adding 400 sf roof deck and 30" 1 hour parapet access from unit 3a only. | $5,000 |