Permit GraphShortlistSan Francisco building permits since 2000

Pyramid Construction & Design

Contractor license
836731
State license record
Based in
Daly City
On San Francisco permits
Dec 2004 to Oct 2018
Last 24 months
0 permits filed

35 permits since 2000: 22 completed, 6 never finaled, 7 expired or cancelled.

Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 2 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 3Stairs 7Kitchen remodel 6Bathroom remodel 10

7 stairs permits: 6 completed, 1 expired or cancelled. Typically 148 days from filing to permit and 148 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 13, 2017Completed
final sign-off Oct 2020
331 Paris Stconvert the (e) bedroom in a new garage on the front of the 1st floor and add one bedroom on the top of the new garage, one new stair connecting the new bedroom with the (e) house.
Details
Permit
201701137146
Status
complete
Filed
Jan 13, 2017
Permit issued
Jan 14, 2020
Final sign-off
Oct 29, 2020
Declared cost
$52,000
Address
331 Paris St

convert the (e) bedroom in a new garage on the front of the 1st floor and add one bedroom on the top of the new garage, one new stair connecting the new bedroom with the (e) house.

Open the permit page

$52,000
Apr 29, 2015Expired or cancelled
withdrawn Jan 2017
331 Paris Stconvert (e) bedroom in a new garage on the front of the 1st floor & add 1 new bedroom on the top of the new garage. 1 new stair connecting the new bedroom with the (e) house.
Details
Permit
201504294931
Status
withdrawn
Filed
Apr 29, 2015
Declared cost
$52,000
Address
331 Paris St

convert (e) bedroom in a new garage on the front of the 1st floor & add 1 new bedroom on the top of the new garage. 1 new stair connecting the new bedroom with the (e) house.

Open the permit page

$52,000
Jan 22, 2015Completed
final sign-off Oct 2015
3018 22nd Strevision to pa#201308154495 new spiral stair was previously approved between (e) garage to (e) living space on 1/f now change to "l" shape with one hour seperation on the garage.
Details
Permit
201501226373
Status
complete
Filed
Jan 22, 2015
Permit issued
Aug 13, 2015
Final sign-off
Oct 14, 2015
Address
3018 22nd St

revision to pa#201308154495 new spiral stair was previously approved between (e) garage to (e) living space on 1/f now change to "l" shape with one hour seperation on the garage.

Open the permit page

Aug 15, 2013Completed
final sign-off Aug 2015
3018 22nd Stpartition to make 2 berooms and 2 baths, 1 rear patio on existing gr fl. new spiral stair, new lightwell on existing 2nd fl
Details
Permit
201308154495
Status
complete
Filed
Aug 15, 2013
Permit issued
Sep 30, 2013
Final sign-off
Aug 18, 2015
Declared cost
$55,000
Address
3018 22nd St

partition to make 2 berooms and 2 baths, 1 rear patio on existing gr fl. new spiral stair, new lightwell on existing 2nd fl

Open the permit page

$55,000
Apr 9, 2009Completed
final sign-off Sep 2009
28 Bennington Stto comply w/n.o.v. #200882356 dated 11/11/08 - to legalize rooms including (e) bedroom, (e) bathroom, & (e) t.v. room into the (e) garage, build new stair connect the 2nd floor with the ground floor.
Details
Permit
200904095959
Status
complete
Filed
Apr 9, 2009
Permit issued
Apr 27, 2009
Final sign-off
Sep 18, 2009
Declared cost
$5,000
Address
28 Bennington St

to comply w/n.o.v. #200882356 dated 11/11/08 - to legalize rooms including (e) bedroom, (e) bathroom, & (e) t.v. room into the (e) garage, build new stair connect the 2nd floor with the ground floor.

Open the permit page

$5,000
Dec 15, 2008Completed
final sign-off Jun 2009
675 Lisbon Stremove & replace existing front stairs at exterior elevation.
Details
Permit
200812158496
Status
complete
Filed
Dec 15, 2008
Permit issued
Mar 19, 2009
Final sign-off
Jun 1, 2009
Declared cost
$3,000
Address
675 Lisbon St

remove & replace existing front stairs at exterior elevation.

Open the permit page

$3,000
Jul 13, 2005Completed
final sign-off Nov 2007
2426 44th Avaddition on the rear of three stories, horizontal & vertical addition.in each story i will build 2 bedrooms&1 bathroom.1 interior stair connect the 3 stories, &1 exterior deck connected the exterior of the 3 stories. like a 2nd exit for emergency.
Details
Permit
200507137519
Status
complete
Filed
Jul 13, 2005
Permit issued
Jun 5, 2007
Final sign-off
Nov 5, 2007
Declared cost
$175,000
Address
2426 44th Av

addition on the rear of three stories, horizontal & vertical addition.in each story i will build 2 bedrooms&1 bathroom.1 interior stair connect the 3 stories, &1 exterior deck connected the exterior of the 3 stories. like a 2nd exit for emergency.

Open the permit page

$175,000