Back to kitchen remodel contractors
Pyramid Construction & Design
- Based in
- Daly City
- On San Francisco permits
- Dec 2004 to Oct 2018
- Last 24 months
- 0 permits filed
35 permits since 2000: 22 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2017 | Completed final sign-off Sep 2018 | 2187 21st Av | to legalize one bedroom, one bathroom, t.v. room and dining room with kitchen on first floor. ordiance 43-14Details
to legalize one bedroom, one bathroom, t.v. room and dining room with kitchen on first floor. ordiance 43-14 | $47,500 |
| May 1, 2017 | Completed final sign-off Sep 2017 | 2187 21st Av | install 7 recessed lights in the e living room, install 4 recessed lights and 12 outlets in (e) kitchen. remodel (1) (e) 1 bath; add 1 new bath.Details
install 7 recessed lights in the e living room, install 4 recessed lights and 12 outlets in (e) kitchen. remodel (1) (e) 1 bath; add 1 new bath. | $37,000 |
| Jul 26, 2016 | Completed final sign-off Nov 2016 | 1831 17th Av | replace the (e) cabinets with (n) cabinets and (n) countertop and new tile in kitchen only. no wall changes.Details
replace the (e) cabinets with (n) cabinets and (n) countertop and new tile in kitchen only. no wall changes. | $8,000 |
| Aug 25, 2009 | Completed final sign-off Dec 2009 | 3997 Cesar Chavez St | remodel kitchen incl. wall removal. relocate stove. replace sink in the bathroom, replace bath tub with new shower. all work on 2nd floor.Details
remodel kitchen incl. wall removal. relocate stove. replace sink in the bathroom, replace bath tub with new shower. all work on 2nd floor. | $5,000 |
| Jun 10, 2009 | Expired or cancelled cancelled Aug 2022 | 323 Athens St | comply with nov 200883773, 200883722: legalize 1 bedroom and 1 bath on the garage level and remove existing kitchen. leave garage parking 20x8 clear.Details
comply with nov 200883773, 200883722: legalize 1 bedroom and 1 bath on the garage level and remove existing kitchen. leave garage parking 20x8 clear. | $6,200 |
| May 9, 2006 | Completed final sign-off Sep 2006 | 1318 Palou Av | to remove (e) kitchen and (e) storage on 1st floor to legalize a (e) bedroom and one bathroom on the (e) 1st floor, and open a 2nd exit door to the rear. plumbing and electric work on 1st floor, to comply with nov #20667369Details
to remove (e) kitchen and (e) storage on 1st floor to legalize a (e) bedroom and one bathroom on the (e) 1st floor, and open a 2nd exit door to the rear. plumbing and electric work on 1st floor, to comply with nov #20667369 | $15,000 |