Pyramid Construction & Design
- Based in
- Daly City
- On San Francisco permits
- Dec 2004 to Oct 2018
- Last 24 months
- 0 permits filed
35 permits since 2000: 22 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 2 expired or cancelled. Typically 692 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2015 | Expired or cancelled cancelled Jan 2026 | 390 Dwight St | footing and new rectangular deck.Details
footing and new rectangular deck. | $15,000 |
| Oct 5, 2012 | Expired or cancelled cancelled Jan 2020 | 1724 Revere Av | comply with complaint #201049168 dated 12/6/10-front deck was built without the required building permit on 1st floor with roof overhang.Details
comply with complaint #201049168 dated 12/6/10-front deck was built without the required building permit on 1st floor with roof overhang. | $1,000 |
| Jul 13, 2005 | Completed final sign-off Nov 2007 | 2426 44th Av | addition on the rear of three stories, horizontal & vertical addition.in each story i will build 2 bedrooms&1 bathroom.1 interior stair connect the 3 stories, &1 exterior deck connected the exterior of the 3 stories. like a 2nd exit for emergency.Details
addition on the rear of three stories, horizontal & vertical addition.in each story i will build 2 bedrooms&1 bathroom.1 interior stair connect the 3 stories, &1 exterior deck connected the exterior of the 3 stories. like a 2nd exit for emergency. | $175,000 |