Back to kitchen remodel contractors
Preservation Trust Builder
- Based in
- Berkeley
- On San Francisco permits
- May 2000 to Sep 2022
- Last 24 months
- 0 permits filed
59 permits since 2000: 49 completed, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2015 | Completed final sign-off May 2016 | 1409 20th St | in kind kitchen remodel, replace living room & kitchen windows, bearing partition wall removal, upgrade plumbing, upgrade electrical. led lightwell, replacement windows max u-factorm 0.40Details
in kind kitchen remodel, replace living room & kitchen windows, bearing partition wall removal, upgrade plumbing, upgrade electrical. led lightwell, replacement windows max u-factorm 0.40 | $40,000 |
| Apr 22, 2015 | Never finaled issued Apr 2015, no final | 101 Casitas Av | kitchen remodel(replace cabinets in kind). replace extg windows and doors in kitchen(new doors and windows to meet title-24)Details
kitchen remodel(replace cabinets in kind). replace extg windows and doors in kitchen(new doors and windows to meet title-24) | $68,000 |
| Aug 12, 2014 | Completed final sign-off Jan 2015 | 139 Corbett Av | remodel bath and kitchen. remove wall between dining and kitchen. install recessed lights in living room and dining room at top level, 2nd flDetails
remodel bath and kitchen. remove wall between dining and kitchen. install recessed lights in living room and dining room at top level, 2nd fl | $60,000 |
| Jul 16, 2014 | Completed final sign-off Oct 2014 | 406 Mangels Av | remove and replace extg cabinets in kin. upgrade electrical circuit and receptacles as needed. install led recess lights. replace kitchen window and 1 bedroom window. install new gas range. replace rotted siding and lightwell and west wall. window max. u factor = 0.32Details
remove and replace extg cabinets in kin. upgrade electrical circuit and receptacles as needed. install led recess lights. replace kitchen window and 1 bedroom window. install new gas range. replace rotted siding and lightwell and west wall. window max. u factor = 0.32 | $30,000 |
| Aug 29, 2013 | Completed final sign-off Dec 2013 | 4027 23rd St | remodel existing kitchen, install new cabinets, counter top, flooring, install new tilt pac windows in laundry rm, upgrade electrical move sink & stove 2' ft from e location (to the right), repl e furnace, install (n) washer/dryer hook-up in garageDetails
remodel existing kitchen, install new cabinets, counter top, flooring, install new tilt pac windows in laundry rm, upgrade electrical move sink & stove 2' ft from e location (to the right), repl e furnace, install (n) washer/dryer hook-up in garage | $35,000 |
| Mar 25, 2013 | Completed final sign-off May 2013 | 1890 36th Av | kitchen remodel, existing layout to remain as is. install new cabinets, flooring, counter top. install new vinyl flooring. upgrade plumbing & electrical.Details
kitchen remodel, existing layout to remain as is. install new cabinets, flooring, counter top. install new vinyl flooring. upgrade plumbing & electrical. | $25,000 |
| Dec 10, 2012 | Completed final sign-off Apr 2013 | 2354 42nd Av | remodel existing kitchen, upgrade electrical to current code. upgrade plumbing to current code. replace cabinets in kind. install new tile floor.Details
remodel existing kitchen, upgrade electrical to current code. upgrade plumbing to current code. replace cabinets in kind. install new tile floor. | $25,000 |
| Aug 21, 2012 | Completed final sign-off Aug 2013 | 4029 23rd St | interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly roomDetails
interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly room | $105,364 |
| Sep 21, 2007 | Completed final sign-off Jan 2008 | 2167 Turk St | unit 2167-a only - remodel kitchen & bathroom. all fixtures in bathroom are to remain in existing location. rewire entire unit. paint cabinets & install new countertop. to comply with title-24 energy codes. complaint #200123797.Details
unit 2167-a only - remodel kitchen & bathroom. all fixtures in bathroom are to remain in existing location. rewire entire unit. paint cabinets & install new countertop. to comply with title-24 energy codes. complaint #200123797. | $50,000 |
| Mar 9, 2006 | Expired or cancelled expired Dec 2010 | 226 Shrader St | remodel kitchen, 2 baths. rewire entire unit.recopper entire unit. dryrot repair about 100 sf. layout of kitchen and baths to stay the same. new lighting. install dimmers on all bedrooms and hallway. install 50% wattage of he lighting in kitchen. install manual on motion sensor in bathrooms & lndryDetails
remodel kitchen, 2 baths. rewire entire unit.recopper entire unit. dryrot repair about 100 sf. layout of kitchen and baths to stay the same. new lighting. install dimmers on all bedrooms and hallway. install 50% wattage of he lighting in kitchen. install manual on motion sensor in bathrooms & lndry | $60,000 |
| Aug 25, 2005 | Expired or cancelled expired Dec 2010 | 224 Shrader St | remodel 2 bathrooms & 1 kitchen @ 224 & 228 shrader street. rewire both units. kitchen & bathroomsDetails
remodel 2 bathrooms & 1 kitchen @ 224 & 228 shrader street. rewire both units. kitchen & bathrooms | $100,000 |
| Nov 18, 2003 | Completed final sign-off Jan 2004 | 846 26th Av | remodel kitchen, keep existing layout, install new cabinets, tile, countertop, upgrade electricalDetails
remodel kitchen, keep existing layout, install new cabinets, tile, countertop, upgrade electrical | $10,000 |
| Jan 13, 2003 | Completed final sign-off May 2004 | 878 Haight St | remodel bath and kitchen. same layout. install new cabinets, upgrade electrical and plumbingDetails
remodel bath and kitchen. same layout. install new cabinets, upgrade electrical and plumbing | $15,000 |
| Aug 14, 2002 | Completed final sign-off Sep 2004 | 158 Downey St | horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, neDetails
horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, ne | $100,000 |
| Feb 6, 2001 | Completed final sign-off Nov 2001 | 165 Downey St | remodel kitchen, remodel bathroom, install hardwood floor.Details
remodel kitchen, remodel bathroom, install hardwood floor. | $50,000 |
| Jan 8, 2001 | Completed final sign-off Oct 2001 | 1445 Mcallister St | remodel kitchen @ 1445 mcallister . remodel 2 bathroomsDetails
remodel kitchen @ 1445 mcallister . remodel 2 bathrooms | $50,000 |