Back to bathroom remodel contractors
Preservation Trust Builder
- Based in
- Berkeley
- On San Francisco permits
- May 2000 to Sep 2022
- Last 24 months
- 0 permits filed
59 permits since 2000: 49 completed, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2017 | Completed final sign-off Apr 2018 | 1586 17th Av | remodel bathroom at 2nd level.Details
remodel bathroom at 2nd level. | $35,000 |
| Jan 7, 2016 | Completed final sign-off May 2016 | 15 Woodhaven Ct | remodel (e) 2 bathrooms, replace (e) shower stalls, bathtub, toilets, vanity and lights, work is located on 3rd floor.Details
remodel (e) 2 bathrooms, replace (e) shower stalls, bathtub, toilets, vanity and lights, work is located on 3rd floor. | $20,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 158 Downey St | remodel 1st floor: lower slab on grade & (n) foundation. remodel (e) bathroom; convert storage to habitable space; (n) property line windows per ab-09; (n) nfpa 13r sprinklers throughout 1st floor under a separate permitDetails
remodel 1st floor: lower slab on grade & (n) foundation. remodel (e) bathroom; convert storage to habitable space; (n) property line windows per ab-09; (n) nfpa 13r sprinklers throughout 1st floor under a separate permit | $85,888 |
| Aug 12, 2014 | Completed final sign-off Jan 2015 | 139 Corbett Av | remodel bath and kitchen. remove wall between dining and kitchen. install recessed lights in living room and dining room at top level, 2nd flDetails
remodel bath and kitchen. remove wall between dining and kitchen. install recessed lights in living room and dining room at top level, 2nd fl | $60,000 |
| Aug 21, 2012 | Completed final sign-off Aug 2013 | 4029 23rd St | interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly roomDetails
interior remodel of residential unit in a 2 unit building. remodel 3rd fl bedrooms, kitchen, living room, dining & bath, including all finishes. fixtures & services, appliances. remove e kitchen ceiling. add new rafters & finishes to roof structure, add new skylight. add new skylight above fmly room | $105,364 |
| Oct 17, 2011 | Completed final sign-off Jan 2012 | 15 Woodhaven Ct | remodel e bathroom on 2nd fl: replace shower,shower door,window,tiles,vanity and lights. install elect receptacles,no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. u-factor for window shall not exceed 0.4Details
remodel e bathroom on 2nd fl: replace shower,shower door,window,tiles,vanity and lights. install elect receptacles,no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. u-factor for window shall not exceed 0.4 | $13,000 |
| Apr 13, 2009 | Completed final sign-off Mar 2010 | 911 Central Av | add new bathroom, move laundry closet.Details
add new bathroom, move laundry closet. | $25,000 |
| Sep 21, 2007 | Completed final sign-off Jan 2008 | 2167 Turk St | unit 2167-a only - remodel kitchen & bathroom. all fixtures in bathroom are to remain in existing location. rewire entire unit. paint cabinets & install new countertop. to comply with title-24 energy codes. complaint #200123797.Details
unit 2167-a only - remodel kitchen & bathroom. all fixtures in bathroom are to remain in existing location. rewire entire unit. paint cabinets & install new countertop. to comply with title-24 energy codes. complaint #200123797. | $50,000 |
| Mar 9, 2006 | Expired or cancelled expired Dec 2010 | 226 Shrader St | remodel kitchen, 2 baths. rewire entire unit.recopper entire unit. dryrot repair about 100 sf. layout of kitchen and baths to stay the same. new lighting. install dimmers on all bedrooms and hallway. install 50% wattage of he lighting in kitchen. install manual on motion sensor in bathrooms & lndryDetails
remodel kitchen, 2 baths. rewire entire unit.recopper entire unit. dryrot repair about 100 sf. layout of kitchen and baths to stay the same. new lighting. install dimmers on all bedrooms and hallway. install 50% wattage of he lighting in kitchen. install manual on motion sensor in bathrooms & lndry | $60,000 |
| Aug 25, 2005 | Expired or cancelled expired Dec 2010 | 224 Shrader St | remodel 2 bathrooms & 1 kitchen @ 224 & 228 shrader street. rewire both units. kitchen & bathroomsDetails
remodel 2 bathrooms & 1 kitchen @ 224 & 228 shrader street. rewire both units. kitchen & bathrooms | $100,000 |
| Jan 13, 2003 | Completed final sign-off May 2004 | 878 Haight St | remodel bath and kitchen. same layout. install new cabinets, upgrade electrical and plumbingDetails
remodel bath and kitchen. same layout. install new cabinets, upgrade electrical and plumbing | $15,000 |
| Aug 14, 2002 | Completed final sign-off Sep 2004 | 158 Downey St | horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, neDetails
horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, ne | $100,000 |
| Feb 6, 2001 | Completed final sign-off Nov 2001 | 165 Downey St | remodel kitchen, remodel bathroom, install hardwood floor.Details
remodel kitchen, remodel bathroom, install hardwood floor. | $50,000 |
| Jan 8, 2001 | Completed final sign-off Oct 2001 | 1445 Mcallister St | remodel kitchen @ 1445 mcallister . remodel 2 bathroomsDetails
remodel kitchen @ 1445 mcallister . remodel 2 bathrooms | $50,000 |
| Jul 21, 2000 | Expired or cancelled expired Jan 2001 | 158 Downey St | remodel 2nd floor bathroomDetails
remodel 2nd floor bathroom | $17,500 |
| May 8, 2000 | Completed final sign-off Jun 2000 | 819 Lyon St | 0ne bathroom remodelingDetails
0ne bathroom remodeling | $10,500 |