Block 2673, lot 045
15 Woodhaven Ct
- City’s use
- Single Family Residential
- Built
- 1960
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,594 sq ft
- Lot
- 3,162 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2023 | Completed final sign-off Jan 2024 | 15 Woodhaven Ct | Tom Lee Roofing Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $28,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 15 Woodhaven Ct | Preservation Trust Builder | revision to pa#2015-0107-6578. replace two windows not facing the street. install radiant heating on one floor.Details
revision to pa#2015-0107-6578. replace two windows not facing the street. install radiant heating on one floor. | $1,000 |
| Jan 7, 2016 | Completed final sign-off May 2016 | 15 Woodhaven Ct | Preservation Trust Builder | remodel (e) 2 bathrooms, replace (e) shower stalls, bathtub, toilets, vanity and lights, work is located on 3rd floor.Details
remodel (e) 2 bathrooms, replace (e) shower stalls, bathtub, toilets, vanity and lights, work is located on 3rd floor. | $20,000 |
| Apr 1, 2013 | Never finaled issued Apr 2013, no final | 15 Woodhaven Ct | street spaceDetails
street space | ||
| Oct 17, 2011 | Completed final sign-off Jan 2012 | 15 Woodhaven Ct | Preservation Trust Builder | remodel e bathroom on 2nd fl: replace shower,shower door,window,tiles,vanity and lights. install elect receptacles,no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. u-factor for window shall not exceed 0.4Details
remodel e bathroom on 2nd fl: replace shower,shower door,window,tiles,vanity and lights. install elect receptacles,no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. u-factor for window shall not exceed 0.4 | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Preservation Trust Builder (3), Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.