- 0 permits filed
59 permits since 2000: 49 completed, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 69 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2011 | Completed final sign-off Jun 2011 | 229 Willard St | dry rot repairs on rear deck of unit #4; less than 50% to be replaced, no change to window wall or doorsDetails
dry rot repairs on rear deck of unit #4; less than 50% to be replaced, no change to window wall or doors | $6,000 |
| Jan 7, 2011 | Completed final sign-off Feb 2011 | 1875 Buchanan St | repair all guardrails on south side of bldg at rear deck.add additional horizontal bars on guardrail to meet current bldg code. under 50% repairDetails
repair all guardrails on south side of bldg at rear deck.add additional horizontal bars on guardrail to meet current bldg code. under 50% repair | $4,000 |
| Aug 26, 2010 | Completed final sign-off Nov 2010 | 2500 Pine St | to comply with nov# 201063527 of 08/18/10. replace rotted exterior 2 decks on east side of property (same for same). upgrade railing ro current building standardDetails
to comply with nov# 201063527 of 08/18/10. replace rotted exterior 2 decks on east side of property (same for same). upgrade railing ro current building standard | $16,000 |
| Mar 2, 2005 | Expired or cancelled expired Mar 2006 | 61 Prospect Av | dry rot repairs on front deck/replace decking with hrt b redwood in kind 200-250Details
dry rot repairs on front deck/replace decking with hrt b redwood in kind 200-250 | $12,000 |
| Jan 27, 2005 | Completed final sign-off Mar 2006 | 236 Clipper St | 2 story rear addition with rear deck-new fullbath&laundry.exist 2 structure with deck to.....Details
2 story rear addition with rear deck-new fullbath&laundry.exist 2 structure with deck to..... | $110,000 |
| Jan 7, 2004 | Completed final sign-off May 2004 | 878 Haight St | rebuild existing 3 decks according to plans, remove existing porchDetails
rebuild existing 3 decks according to plans, remove existing porch | $20,000 |
| Aug 14, 2002 | Completed final sign-off Sep 2004 | 158 Downey St | horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, neDetails
horizontal addition-kitchen & bath & laundry remodel, 36 sq ft addition to rear parlor, new deck, ne | $100,000 |
| Apr 12, 2002 | Completed final sign-off Apr 2002 | 229 Willard St | dry rot repair on 2nd fl deck, sister 2x12 pressure treated. cut of dry rot on existing joist, treatDetails
dry rot repair on 2nd fl deck, sister 2x12 pressure treated. cut of dry rot on existing joist, treat | $3,500 |
| Oct 17, 2001 | Completed final sign-off Nov 2001 | 1445 Mcallister St | dry rot repair @ frontstairs. dry rot repair@ rear deck.Details
dry rot repair @ frontstairs. dry rot repair@ rear deck. | $6,000 |