Back to kitchen remodel contractors
Prague Property Management Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2014 to Aug 2026
- Last 24 months
- 6 permits filed
76 permits since 2000: 46 completed, 7 in progress, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 expired or cancelled. Typically 12 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 4204 Mission St | unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved mannerDetails
unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved manner | $4,500 |
| Apr 28, 2017 | Completed final sign-off Sep 2017 | 158 Missouri St | remove door between 158 and 160 missouri and install new rated partition wall. provide 220 v electrical connection to cooktop to kitchen in unit 160 missouri no structural work. comply with/planning complaint 2017001630enfDetails
remove door between 158 and 160 missouri and install new rated partition wall. provide 220 v electrical connection to cooktop to kitchen in unit 160 missouri no structural work. comply with/planning complaint 2017001630enf | $5,000 |
| Apr 4, 2017 | Completed final sign-off May 2017 | 100 Teresita Bl | replace damaged plaster walls in bedroom & kitchen -- only portions of walls, 200 sq. ft.; no structural workDetails
replace damaged plaster walls in bedroom & kitchen -- only portions of walls, 200 sq. ft.; no structural work | $1,200 |
| Oct 14, 2016 | Completed final sign-off Apr 2018 | 151 Coleridge St | kitchen abd bath remodelDetails
kitchen abd bath remodel | $23,000 |
| Aug 29, 2016 | Completed final sign-off Jun 2018 | 109 17th Av | add 2nd unit at ground floor behind garage, structural work, upgrade (e) family room to kitchen. recess (e) garage door. 1 bedroom & 1 bath. existing legal 1st floor rooms approved under bpa#2004-0913-3903. 6" excavation for (n) corridor less than 50 cubic yards.Details
add 2nd unit at ground floor behind garage, structural work, upgrade (e) family room to kitchen. recess (e) garage door. 1 bedroom & 1 bath. existing legal 1st floor rooms approved under bpa#2004-0913-3903. 6" excavation for (n) corridor less than 50 cubic yards. | $12,350 |
| Feb 11, 2016 | Completed final sign-off May 2016 | 65 Beaumont Av | revision to app#201312315415 to reconfigure the lower unit floor plan at 1st floor and 2nd floor level. 1)restore kitchen to 2nd floor from 1st floor level. 2)remove connecting stairway from 2nd floor to 1st floor.Details
revision to app#201312315415 to reconfigure the lower unit floor plan at 1st floor and 2nd floor level. 1)restore kitchen to 2nd floor from 1st floor level. 2)remove connecting stairway from 2nd floor to 1st floor. | |
| Oct 13, 2015 | Completed final sign-off Mar 2017 | 1771 10th Av | upgrade kitchen: new countertop/cabinets, replace window sash in extg frame opening, replace hardwood floor, repair dryrot at front room, paint throughout. no structural work. upgrade bathroom. new fixtures and retile shower stall. comply with nov #201541901.Details
upgrade kitchen: new countertop/cabinets, replace window sash in extg frame opening, replace hardwood floor, repair dryrot at front room, paint throughout. no structural work. upgrade bathroom. new fixtures and retile shower stall. comply with nov #201541901. | $26,500 |
| Sep 18, 2015 | Expired or cancelled expired Mar 2026 | 1133 Tennessee St | new horiz add'n at rear of (e) 3 story bldg, remodel + expansion of 2 (e) top floor units, & renovation of (e) garage & addition of (n) 1 br unit, 2 (e) top units have 1 remodeled kitchen & 1 remodeled bath, plus 1.5 baths each. new plumbing & electrical throughout new exterior. sprinkler deferredDetails
new horiz add'n at rear of (e) 3 story bldg, remodel + expansion of 2 (e) top floor units, & renovation of (e) garage & addition of (n) 1 br unit, 2 (e) top units have 1 remodeled kitchen & 1 remodeled bath, plus 1.5 baths each. new plumbing & electrical throughout new exterior. sprinkler deferred | $400,000 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2240 Bay St | work in unit 202: upgrade kitchen and bathroom. new cabinets, counter, vanity and water closet.Details
work in unit 202: upgrade kitchen and bathroom. new cabinets, counter, vanity and water closet. | $18,500 |
| Jun 9, 2015 | Expired or cancelled cancelled Dec 2015 | 1050 North Point St | unit 802 - upgrade kitchen: new cabinets, appliances, floor tiles - replacement; upgrade bathroom: new toilet, vanity, machine cabinet; install 3 hardwired smoke alarms (under separate electricl permit) & co alarm. smooth ceilings throughout with smooth surface. refinish floor throughoutDetails
unit 802 - upgrade kitchen: new cabinets, appliances, floor tiles - replacement; upgrade bathroom: new toilet, vanity, machine cabinet; install 3 hardwired smoke alarms (under separate electricl permit) & co alarm. smooth ceilings throughout with smooth surface. refinish floor throughout | $35,000 |
| Jul 25, 2014 | Completed final sign-off May 2015 | 3422 16th St | upgrade kitchen - counters, dishwasher, new appliances, add electrical outlets, new floor, painting. upgrade for one (1) kitchen only and upgrade bathroom - shower stall, vanity, toilet.Details
upgrade kitchen - counters, dishwasher, new appliances, add electrical outlets, new floor, painting. upgrade for one (1) kitchen only and upgrade bathroom - shower stall, vanity, toilet. | $12,500 |