Prague Property Management Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2014 to Aug 2026
- Last 24 months
- 6 permits filed
76 permits since 2000: 46 completed, 7 in progress, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2021 | Never finaled issued Apr 2021, no final | 2872 Greenwich St | dryrot repair rear deck of apt #3 (repair in kind less than 50%)Details
dryrot repair rear deck of apt #3 (repair in kind less than 50%) | $3,875 |
| Dec 2, 2020 | Completed final sign-off Feb 2021 | 66 Encanto Av | dry rot repair - rear deck. less than 50%. no structural work.Details
dry rot repair - rear deck. less than 50%. no structural work. | $2,875 |
| Sep 3, 2019 | Expired or cancelled expired Apr 2025 | 1617 09th Av | repair replace dryrotted rear deck and stairs. construct all weather covering over deck. replace all elements in kind, same footprint. comply with complaint 201973096 and 201973094Details
repair replace dryrotted rear deck and stairs. construct all weather covering over deck. replace all elements in kind, same footprint. comply with complaint 201973096 and 201973094 | $6,800 |
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 4204 Mission St | unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved mannerDetails
unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved manner | $4,500 |
| Jun 9, 2015 | Completed final sign-off Jun 2015 | 65 Beaumont Av | comply with correction notice - clean & stain existing rear deck and add decorative detail at posts; add $10,000 to estimated cost of permit application 201407070596Details
comply with correction notice - clean & stain existing rear deck and add decorative detail at posts; add $10,000 to estimated cost of permit application 201407070596 | $15,000 |
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 1368 De Haro St | remove (3) rear decks at ground floor, 1st & 2nd floor level & reconstruct the (3) rear decks with reduced size. change railing of decks from wood balustrate to cable.Details
remove (3) rear decks at ground floor, 1st & 2nd floor level & reconstruct the (3) rear decks with reduced size. change railing of decks from wood balustrate to cable. | $21,500 |
| Mar 21, 2014 | Completed final sign-off Jun 2014 | 285 Santa Rosa Av | interior remodel at main floor level. 1). remove two window units that open onto existing deck. 2). replace two doors in kind.Details
interior remodel at main floor level. 1). remove two window units that open onto existing deck. 2). replace two doors in kind. | $1,550 |